Hydrogen projects
Public hydrogen production and supply projects tracked by H2Prism
Shown in catalog order. Capacity sort is unavailable because these results have no explicitly identified electrolyser MW_e values; generic MW values are not compared as the same measure.
| Project | Status | Country | Technology | Product | Capacity · sort unavailable |
|---|---|---|---|---|---|
| Oshivela | Not confirmed | Not confirmed | Not confirmed | H2iea.org · as of 2026 | Not confirmed |
| HySCALE 100 - IPCEI project Heide refinery | Cancellediea.org · as of 2026 | Germanyiea.org · as of 2026 | Not confirmed | Variousiea.org · as of 2026 | 500 MWiea.org · as of 2026 |
| Green Energy Manufacturing Centre (GEM) -Gladstone -PEM50 phase 1 | Cancellediea.org · as of 2026 | Australiaiea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | Not confirmed |
| Green Iron Trial Commercial Plant - Christmas Creek | First hot metal produced; staged commissioning continues before larger-scale production (announced 19 August 2026) | Australiaiea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | 8.66 MWiea.org · as of 2026Production: More than 1,500 tonnes per annum of green iron metal (planned output announced 15 August 2024) |
| EBIC - Ammonia plant - phase 2 | Feasibilityiea.org · as of 2026 | Egyptiea.org · as of 2026 | Not confirmed | Ammoniaiea.org · as of 2026 | 85 MWiea.org · as of 2026 |
| Green Energy Manufacturing Centre (GEM) -Gladstone -PEM50 phase 2 | Cancellediea.org · as of 2026 | Australiaiea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | Not confirmed |
| Eneco H2 project Rotterdam port area | Conceptiea.org · as of 2026 | Netherlandsiea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | 225 MWiea.org · as of 2026 |
| White Dunes - Western Sahara hydrogen project -phase 1 | Cancellediea.org · as of 2026 | Moroccoiea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | Not confirmed |
| White Dunes - Western Sahara hydrogen project -phase 2 | Cancellediea.org · as of 2026 | Moroccoiea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | Not confirmed |
| Leuna 100 | Not confirmed | Not confirmed | Not confirmed | MeOHiea.org · as of 2026 | Not confirmed |
| Goldwind e-methanol project | OperationalH2Prism earlier record | ChinaGoldwind (https://www.goldwind.com/cn/news/focus-972799634579852288/) · as of 2024 | Not confirmed | MeOHiea.org · as of 2026 | 276 MWiea.org · as of 2026 |
| Scatec e-Methanol - second project | Conceptiea.org · as of 2026 | Egyptiea.org · as of 2026 | Not confirmed | MeOHiea.org · as of 2026 | 190 MWiea.org · as of 2026 |
| Hydrogen Park Takasago | Operational | Japaniea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | 5.06 MWiea.org · as of 2026 |
| H2eron | Feasibilityiea.org · as of 2026 | Netherlandsiea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | Planned 90 MW electrolysis project in Delfzijl (announced 18 July 2025) |
| ACWA Power - Green Hydrogen Project | Conceptiea.org · as of 2026 | Egyptiea.org · as of 2026 | Not confirmed | Ammoniaiea.org · as of 2026 | 624 MWiea.org · as of 2026 |
| Cormorant Clean Energy Project | Feasibilityiea.org · as of 2026 | United Statesiea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | Not confirmed |
| Project Mauricie | Feasibilityiea.org · as of 2026 | Canadaiea.org · as of 2026 | Not confirmed | Variousiea.org · as of 2026 | 500 MWiea.org · as of 2026Production: 70,000 tonnes of green hydrogen |
| Moeve la Rábida Energy Park (Huelva) - phase 3- Andalusian Green Hydrogen Valley THARSIS Project (Together with ONUBA: LUXIA project) | Feasibilityiea.org · as of 2026 | Spainiea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | 200 MWiea.org · as of 2026 |
| Megaton Moon, phase 1 | Conceptiea.org · as of 2026 | Mauritaniaiea.org · as of 2026 | Not confirmed | Ammoniaiea.org · as of 2026 | 500 MWiea.org · as of 2026 |
| C2X Green Methanol Plant | Feasibilityiea.org · as of 2026 | Egyptiea.org · as of 2026 | Not confirmed | MeOHiea.org · as of 2026 | 663 MWiea.org · as of 2026 |
| Hydrogen Project - La Romana | Conceptiea.org · as of 2026 | Dominican Republiciea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | 350 MWiea.org · as of 2026 |
| QAFCO ammonia project | FID / Constructioniea.org · as of 2026 | Qatariea.org · as of 2026 | Not confirmed | Ammoniaiea.org · as of 2026 | Not confirmed |
| Underground Sun Storage 2030 | OperationalRAG Austria AG (https://www.uss-2030.at/en/public-relations/press-releases/seasonal-electricity-storage-in-the-form-of-hydrogen-ready-for-scale-up-1) · as of 2025 | AustriaRAG Austria AG (https://www.uss-2030.at/en/public-relations/press-releases/underground-sun-storage-worlds-first-geological-hydrogen-storage-facility-goes-into-operation-1) · as of 2023 | Not confirmed | H2iea.org · as of 2026 | 2 MWiea.org · as of 2026 |
| Brightloop TM - CCS Demostration Plant: Converting Wyoming PRB Coal to Hydrogen | Demoiea.org · as of 2026 | United Statesiea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | Not confirmed |
| Integration of Produced Water Thermal Desalination and Steam Methane Reforming for Efficient Hydrogen Production | Demoiea.org · as of 2026 | United Statesiea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | Not confirmed |
| Green Hydrogen Production Facility in Gimcheon-si | Construction completed (reported 25 March 2026) | Korea, Republic ofSamsung C&T Newsroom (https://news.samsungcnt.com/en/features/engineering-construction/2026-03-samsung-ct-completes-koreas-first-off-grid-green-hydrogen-facility/) · as of 2026 | Not confirmed | H2iea.org · as of 2026 | 10 MW |
| AEM Nexus 1000 - Saerbeck | Decommissionediea.org · as of 2026 | Germanyiea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | 1 MWiea.org · as of 2026 |
| Keravan Energia (Kerava) | Feasibilityiea.org · as of 2026 | Finlandiea.org · as of 2026 | Not confirmed | CH4iea.org · as of 2026 | 50 MWiea.org · as of 2026 |
| Tarastenjärvi power (Tampere) | Feasibilityiea.org · as of 2026 | Finlandiea.org · as of 2026 | Not confirmed | CH4iea.org · as of 2026 | 50 MW electrolyser capacity (planned delivery; announced 19 November 2024) |
| Kymijärvi power (Lahti) | Feasibilityiea.org · as of 2026 | Finlandiea.org · as of 2026 | Not confirmed | CH4iea.org · as of 2026 | 100 MWiea.org · as of 2026 |
| Kotka power (Kotka) | Feasibilityiea.org · as of 2026 | Finlandiea.org · as of 2026 | Not confirmed | CH4iea.org · as of 2026 | 40 MW planned electrolyser output (announced 30 March 2022) |
| Mikkeli plant | Feasibilityiea.org · as of 2026 | Finlandiea.org · as of 2026 | Not confirmed | CH4iea.org · as of 2026 | 50 MWiea.org · as of 2026 |
| Aittaluoto power (Pori) | Feasibilityiea.org · as of 2026 | Finlandiea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | 69.3 MWiea.org · as of 2026 |
| CEEC Songyuan Hydrogen Energy Industrial Park (Green H2-NH3 Integration) Phase 2 | FID / Constructioniea.org · as of 2026 | ChinaChina Power Engineering Consulting Group Northeast Electric Power Design Institute (https://www.nepdi.ceec.net.cn/art/2026/4/30/art_19511_2515661.html) · as of 2026 | Not confirmed | H2iea.org · as of 2026 | 1,280 MWiea.org · as of 2026Production: 400,000 t/year planned ammonia productionChina Power Engineering Consulting Group Northeast Electric Power Design Institute (https://www.nepdi.ceec.net.cn/art/2026/4/30/art_19511_2515661.html) · as of 2026 |
| Baofeng Ordos Base Green Hydrogen Integrating with Coal-to-Olefins Production Demo | FID / Construction鄂尔多斯市人民政府 (https://www.ordos.gov.cn/xw_127672/qqdt/202509/t20250903_3831824.html) · as of 2025 | China宁夏宝丰能源集团股份有限公司 (https://www.baofengenergy.com/user_tm/bjq2/attached/file/20250311/20250311090918121812.pdf) · as of 2025 | Not confirmed | MeOHiea.org · as of 2026 | 319 MWiea.org · as of 2026 |
| Qitai Smart Energy Equipment Industrial Park - 50,000 Ton Green Hydrogen and Green Methanol Project (Phase 1) | FID / Constructioniea.org · as of 2026 | Chinaiea.org · as of 2026 | Not confirmed | MeOHiea.org · as of 2026 | 56.4 MWiea.org · as of 2026 |
| Daye Green Power project | OperationalH2Prism earlier record | Chinaiea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | 27 MWiea.org · as of 2026 |
| Hydrogen Into Ten Thousand Homes - Huadian Weifang Hydrogen Energy Storage Demonstration | OperationalH2Prism earlier record | Chinaiea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | 25 MW electrolyser system (announced 10 December 2024) |
| Rudong Renewable Hydrogen Supply Base and Hydrogen Equipment Manufacturing Program Stage1 | Operationaliea.org · as of 2026 | Chinaiea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | 6.9 MWiea.org · as of 2026 |
| Zheneng-DSIC 10K Ton-Scale Green Methanol Project | FID / Constructioniea.org · as of 2026 | Chinaiea.org · as of 2026 | Not confirmed | MeOHiea.org · as of 2026 | 11 MWiea.org · as of 2026 |
| Qitai Smart Energy Equipment Industrial Park - 50,000 Ton Green Hydrogen and Green Methanol Project (Phase 2) | Conceptiea.org · as of 2026 | Chinaiea.org · as of 2026 | Not confirmed | MeOHiea.org · as of 2026 | 55.2 MWiea.org · as of 2026 |
| Qitai Smart Energy Equipment Industrial Park - 50,000 Ton Green Hydrogen and Green Methanol Project (Phase 3) | Conceptiea.org · as of 2026 | Chinaiea.org · as of 2026 | Not confirmed | MeOHiea.org · as of 2026 | 221 MWiea.org · as of 2026 |
| Proyecto Fenix | Operationaliea.org · as of 2026 | Peruiea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | 0.004 MWiea.org · as of 2026 |
| The Hydrogen Plant at Tse'khene Energy Transition Hub (TETH) | Dormantiea.org · as of 2026 | Canadaiea.org · as of 2026 | Not confirmed | Ammoniaiea.org · as of 2026 | 2,297 MWiea.org · as of 2026 |
| Masdar green hydrogen project | Conceptiea.org · as of 2026 | Jordaniea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | 289 MWiea.org · as of 2026 |
| ACWA Saudi Arabia green ammonia project | Feasibilityiea.org · as of 2026 | Jordaniea.org · as of 2026 | Not confirmed | Ammoniaiea.org · as of 2026 | 130 MWiea.org · as of 2026 |
| KEPCO -Xenel green ammonia project | Feasibilityiea.org · as of 2026 | Jordaniea.org · as of 2026 | Not confirmed | Ammoniaiea.org · as of 2026 | 520 MWiea.org · as of 2026 |
| Ocior Energy green ammonia project -Phase 1 | Feasibilityiea.org · as of 2026 | Jordaniea.org · as of 2026 | Not confirmed | Ammoniaiea.org · as of 2026 | 104 MWiea.org · as of 2026 |
| Ocior Energy green ammonia project -Phase 2 | Conceptiea.org · as of 2026 | Jordaniea.org · as of 2026 | Not confirmed | Ammoniaiea.org · as of 2026 | 935 MWiea.org · as of 2026 |
| Catalyst green ammonia project | Feasibilityiea.org · as of 2026 | Jordaniea.org · as of 2026 | Not confirmed | Ammoniaiea.org · as of 2026 | 156 MWiea.org · as of 2026 |
| Kawar Energy green ammonia project | Feasibilityiea.org · as of 2026 | Jordaniea.org · as of 2026 | Not confirmed | Ammoniaiea.org · as of 2026 | 104 MWiea.org · as of 2026 |
| Philadelphia solar green ammonia project | Feasibilityiea.org · as of 2026 | Jordaniea.org · as of 2026 | Not confirmed | Ammoniaiea.org · as of 2026 | 156 MWiea.org · as of 2026 |
| Enertag green ammonia project | Feasibilityiea.org · as of 2026 | Jordaniea.org · as of 2026 | Not confirmed | Ammoniaiea.org · as of 2026 | 520 MWiea.org · as of 2026 |
| Amarenco green ammonia project | Feasibilityiea.org · as of 2026 | Jordaniea.org · as of 2026 | Not confirmed | Ammoniaiea.org · as of 2026 | 1,039 MWiea.org · as of 2026 |
| Mass Group Holdings green ammonia project | Feasibilityiea.org · as of 2026 | Jordaniea.org · as of 2026 | Not confirmed | Ammoniaiea.org · as of 2026 | 187 MWiea.org · as of 2026 |
| Zijing Mining Renewable energy project | Feasibilityiea.org · as of 2026 | Serbiaiea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | 346 MWiea.org · as of 2026 |
| Picea systems installed at multiple residential households (500 2.4 kW) | Operationaliea.org · as of 2026 | Germanyiea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | 1.35 MWiea.org · as of 2026 |
| AEM Nexus for Metal Hardening Process (OMCD Tek Hub SpA) | FID / Constructioniea.org · as of 2026 | Italyiea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | 1 MWiea.org · as of 2026 |
| AEM Nexus for Fuel Cell factory FAT process | FID / Constructioniea.org · as of 2026 | United Kingdomiea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | 1 MWiea.org · as of 2026 |
| AEM Nexus for Unigranit | Operationaliea.org · as of 2026 | Czechiaiea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | 0.5 MWiea.org · as of 2026 |
| AEM Nexus in China for testing | Operationaliea.org · as of 2026 | Chinaiea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | 1 MWiea.org · as of 2026 |
| Zella-Mehlis waste incineration site methanol production | Cancellediea.org · as of 2026 | Germanyiea.org · as of 2026 | Not confirmed | MeOHiea.org · as of 2026 | Not confirmedProduction: Around 5,000 to 7,000 metric tons of green fuel per year (planned methanol synthesis output, announced 31 January 2022) |
| eM-Rhone | Feasibilityiea.org · as of 2026 | Franceiea.org · as of 2026 | Not confirmed | MeOHiea.org · as of 2026 | 200 MWiea.org · as of 2026 |
| Nautilus | Preliminary feasibility study (reported 3 May 2022) | Germanyiea.org · as of 2026 | Not confirmed | MeOHiea.org · as of 2026 | Initial electrolyser capacity: 75 MW (announced 3 May 2022) |
| HS Orka-H2V green methanol plant | Feasibilityiea.org · as of 2026 | Icelandiea.org · as of 2026 | Not confirmed | MeOHiea.org · as of 2026 | 60 MWiea.org · as of 2026 |
| Cromarty Clean Fuels Project | Feasibilityiea.org · as of 2026 | United Kingdomiea.org · as of 2026 | Not confirmed | MeOHiea.org · as of 2026 | 38.7 MWiea.org · as of 2026 |
| SolWinHy Cádiz | Withdrawn from IF24 grant-agreement preparation (withdrawal date not stated; EC page updated 21 January 2026, accessed 8 October 2026); not evidence of overall project cancellation. | Spainiea.org · as of 2026 | Not confirmed | MeOHiea.org · as of 2026 | 80 MWe (IF24 auction bid capacity; planned)Production: 63 kt_H2 / 10 yrs (IF24 auction bid volume; planned) |
| eM-Numancia | Feasibilityiea.org · as of 2026 | Spainiea.org · as of 2026 | Not confirmed | MeOHiea.org · as of 2026 | Planned 60 MW alkaline electrolyser in Garray, Soria (announced 27 November 2025) |
| Hydrogen Hub Agder Phase 1 | FID / Constructioniea.org · as of 2026 | NorwayITM Power (https://itm-power.com/news/contract-for-four-neptune-v) · as of 2025 | Not confirmed | H2iea.org · as of 2026 | 20 MWiea.org · as of 2026 |
| Hydrogen Hub Agder Phase 2 | Feasibilityiea.org · as of 2026 | Norwayiea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | 40 MWiea.org · as of 2026 |
| Lhyfe - Brake green hydrogen plant | FID / Constructioniea.org · as of 2026 | GermanyLhyfe (https://www.lhyfe.com/production-unit/lhyfe-brake-lower-saxony/) | Not confirmed | H2iea.org · as of 2026 | 10 MWiea.org · as of 2026 |
| Shandong Green Methanol Plant | Conceptiea.org · as of 2026 | Chinaiea.org · as of 2026 | Not confirmed | MeOHiea.org · as of 2026 | 442 MWiea.org · as of 2026 |
| GACL-NTPC REL ammonia methanol plant | Conceptiea.org · as of 2026 | Indiaiea.org · as of 2026 | Not confirmed | Variousiea.org · as of 2026 | 86.2 MWiea.org · as of 2026 |
| Umwelt e-fuels plant | Conceptiea.org · as of 2026 | Indiaiea.org · as of 2026 | Not confirmed | Variousiea.org · as of 2026 | 221 MWiea.org · as of 2026 |
| ReNew E-Fuels Private Limited green methanol plant - Malkangiri | Conceptiea.org · as of 2026 | Indiaiea.org · as of 2026 | Not confirmed | MeOHiea.org · as of 2026 | 969 MWiea.org · as of 2026 |
| ReNew E-Fuels Private Limited green methanol plant - Rayagada | Conceptiea.org · as of 2026 | Indiaiea.org · as of 2026 | Not confirmed | MeOHiea.org · as of 2026 | 581 MWiea.org · as of 2026 |
| Padborg PtX | On holdiea.org · as of 2026 | Denmarkiea.org · as of 2026 | Not confirmed | MeOHiea.org · as of 2026 | 150 MWiea.org · as of 2026 |
| IBCLNG hydrogen plant | Conceptiea.org · as of 2026 | Thailandiea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | 25 MWiea.org · as of 2026 |
| SAF+Consortium SAF plant | Cancellediea.org · as of 2026 | Canadaiea.org · as of 2026 | Not confirmed | Synfuelsiea.org · as of 2026 | 219 MWiea.org · as of 2026 |
| SPIC SAF facility - Qiqihaer - Phase 1 | Feasibilityiea.org · as of 2026 | Chinaiea.org · as of 2026 | Not confirmed | Synfuelsiea.org · as of 2026 | 38 MWiea.org · as of 2026 |
| SPIC SAF facility - Qiqihaer - Phase 2 | Conceptiea.org · as of 2026 | Chinaiea.org · as of 2026 | Not confirmed | Variousiea.org · as of 2026 | 923 MWiea.org · as of 2026 |
| Baden-Württemberg SAF Demo plant | Feasibilityiea.org · as of 2026 | Germanyiea.org · as of 2026 | Not confirmed | Synfuelsiea.org · as of 2026 | 181 MWiea.org · as of 2026 |
| The Next Gate - P2X -Europe | Demoiea.org · as of 2026 | Germanyiea.org · as of 2026 | Not confirmed | Synfuelsiea.org · as of 2026 | 0.759 MWiea.org · as of 2026 |
| IdunnH2 SAF plant | Feasibilityiea.org · as of 2026 | Icelandiea.org · as of 2026 | Not confirmed | Synfuelsiea.org · as of 2026 | 300 MWiea.org · as of 2026 |
| Swedish Biofuels/COWI SAF plant | Conceptiea.org · as of 2026 | Swedeniea.org · as of 2026 | Not confirmed | Synfuelsiea.org · as of 2026 | 75.9 MWiea.org · as of 2026 |
| Carbonshift PtL SAF refinery | Feasibilityiea.org · as of 2026 | United Kingdomiea.org · as of 2026 | Not confirmed | Synfuelsiea.org · as of 2026 | 127 MWiea.org · as of 2026 |
| NABOO | Feasibilityiea.org · as of 2026 | United Kingdomiea.org · as of 2026 | Not confirmed | Synfuelsiea.org · as of 2026 | 415 MWiea.org · as of 2026 |
| Oxefuel Biogenic | Conceptiea.org · as of 2026 | United Kingdomiea.org · as of 2026 | Not confirmed | Synfuelsiea.org · as of 2026 | 38.4 MWiea.org · as of 2026 |
| Project Starling - Advancing Sustainable Aviation via PtL and Direct Air Capture (ASAP-DAC) project | Feasibilityiea.org · as of 2026 | United Kingdomiea.org · as of 2026 | Not confirmed | Synfuelsiea.org · as of 2026 | 109 MWiea.org · as of 2026 |
| Nujio'qonik Green Hydrogen -phase 3 | Cancellediea.org · as of 2026 | CanadaGovernment of Newfoundland and Labrador (https://www.gov.nl.ca/ecc/files/env_assessment_y2023_2202_EIS_AppBSA-4.pdf) | Not confirmed | H2iea.org · as of 2026 | 650 MWiea.org · as of 2026 |
| Semarak Renewable Energy hydrogen project in Perak | FID / Constructioniea.org · as of 2026 | Malaysiaiea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | 60 MWiea.org · as of 2026 |
| Renewstable Mpumalanga | Conceptiea.org · as of 2026 | South Africaiea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | 346 MWiea.org · as of 2026 |
| Renewstable Olutanga | Feasibilityiea.org · as of 2026 | Philippinesiea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | 30.8 MWiea.org · as of 2026 |
| Renewstable Vitilevu | Conceptiea.org · as of 2026 | Fijiiea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | 7.7 MWiea.org · as of 2026 |
| LH2 Europe Project | Conceptiea.org · as of 2026 | United Kingdomiea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | 360 MWiea.org · as of 2026 |
| Uganda H2-based fertiliser project | Feasibilityiea.org · as of 2026 | Ugandaiea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | 115 MWiea.org · as of 2026 |
| e-methanol plant in Port of Victoria | Feasibilityiea.org · as of 2026 | United Statesiea.org · as of 2026 | Not confirmed | MeOHiea.org · as of 2026 | 221 MWiea.org · as of 2026 |
| Oulu E-methanol Plant | Feasibilityiea.org · as of 2026 | Finlandiea.org · as of 2026 | Not confirmed | MeOHiea.org · as of 2026 | 100 MWiea.org · as of 2026 |
| Stirling Green Hydrogen | Feasibilityiea.org · as of 2026 | United Kingdomiea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | 10 MWiea.org · as of 2026 |
| Wigan Green Hydrogen | Feasibilityiea.org · as of 2026 | United Kingdomiea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | 20 MWiea.org · as of 2026 |