Tarastenjärvi power (Tampere)
Overview
StatusFeasibilityInternational Energy Agency · as of 2026
Country · regionFinlandInternational Energy Agency · as of 2026
TechnologyOther ElectrolysisInternational Energy Agency · as of 2026
ProductCH4International Energy Agency · as of 2026
Capacity50 MW electrolyser capacity (planned delivery; announced 19 November 2024)
Capacity values retain their recorded units and scope. MW, kt H₂/y and Nm³ H₂/h are different measures; this page does not convert or add them without a shared operating basis. “Other Electrolysis” and “Unknown PtX” are recorded classifications, not a specific electrolyzer design or power-to-X route.
Details
Technology & product
Configuration DetailUnknown PtXInternational Energy Agency · as of 2026
Final UsePlanned renewable e-methane for heavy road and maritime transport (announced 19 November 2024)
Status & timeline
Date online (tracker field)2027 (meaning under review)International Energy Agency · as of 2026
Additional project information
Administrative AreaTarastenjärvi Waste CenterInternational Energy Agency · as of 2026
Capacity (kt H2/y)8.66 kt H2/yInternational Energy Agency · as of 2026
Capacity (MWel)50 MWelInternational Energy Agency · as of 2026
Capacity (Nm³ H₂/h)11,111 Nm³ H₂/hInternational Energy Agency · as of 2026
Capacity (Announced Size)50 MWInternational Energy Agency · as of 2026
Timeline
No recorded project events.
Sources & record history
Sources
- Ren-Gas Oy Tampere - Ren-Gas Oy
- International Energy Agency IEA Hydrogen Projects dataset Shared by 11 fields: Snapshot 2026-06-18 · Confidence: reported · Older value (2026)
- Sunfire Ren-Gas Selects Sunfire Electrolyzer for Its Tampere E-Methane Plant Shared by 2 fields: Current
Field sources
Shared date, confidence and value status appear once with their source above; a dash in the table refers to that source context.
| Field | Shown value | Original value | Source | Date basis | Meaning |
|---|---|---|---|---|---|
| Name | Tarastenjärvi power (Tampere) | View exact valueTarastenjärvi power (Tampere) | Tampere - Ren-Gas Oy | Current | |
| Country | Finland | View exact valueFinland | IEA Hydrogen Projects dataset | — | — |
| Configuration Detail | Unknown PtX | View exact valueUnknown PtX | IEA Hydrogen Projects dataset | — | — |
| Final Use | Planned renewable e-methane for heavy road and maritime transport (announced 19 November 2024) | View exact valuePlanned renewable e-methane for heavy road and maritime transport (announced 19 November 2024) | Ren-Gas Selects Sunfire Electrolyzer for Its Tampere E-Methane Plant | — | |
| Product | CH4 | View exact valueCH4 | IEA Hydrogen Projects dataset | — | — |
| Technology | Other Electrolysis | View exact valueOther Electrolysis | IEA Hydrogen Projects dataset | — | — |
| Capacity | 50 MW electrolyser capacity (planned delivery; announced 19 November 2024) | View exact value50 MW electrolyser capacity (planned delivery; announced 19 November 2024) | Ren-Gas Selects Sunfire Electrolyzer for Its Tampere E-Methane Plant | — | |
| Event | Date online : 2027 | View exact value{"date":"2027","date_precision":"year","event":"Date online","basis":"iea_hydrogen_projects_raw.csv"} | IEA Hydrogen Projects dataset | — | — |
| Progress Status | Feasibility | View exact valueFeasibility study | IEA Hydrogen Projects dataset | — | — |
| Administrative Area | Tarastenjärvi Waste Center | View exact valueTarastenjärvi Waste Center | IEA Hydrogen Projects dataset | — | — |
| Capacity (kt H2/y) | 8.66 kt H2/y | View exact value8.662666666666667 kt H2/y | IEA Hydrogen Projects dataset | — | — |
| Capacity (MWel) | 50 MWel | View exact value50 MWel | IEA Hydrogen Projects dataset | — | — |
| Capacity (Nm³ H₂/h) | 11,111 Nm³ H₂/h | View exact value11111.111111111111 Nm³ H₂/h | IEA Hydrogen Projects dataset | — | — |
| Capacity (Announced Size) | 50 MW | View exact value50 MW | IEA Hydrogen Projects dataset | — | — |
Record history
2 current sourced values · 6 older values · Record updated