H2Prism
Hydrogen calculators & data

Kotka power (Kotka)

Finland

Overview

StatusFeasibilityInternational Energy Agency · as of 2026
Country · regionFinlandInternational Energy Agency · as of 2026
TechnologyOther ElectrolysisInternational Energy Agency · as of 2026
ProductCH4International Energy Agency · as of 2026
Capacity40 MW planned electrolyser output (announced 30 March 2022)

Capacity values retain their recorded units and scope. MW, kt H₂/y and Nm³ H₂/h are different measures; this page does not convert or add them without a shared operating basis. “Other Electrolysis” and “Unknown PtX” are recorded classifications, not a specific electrolyzer design or power-to-X route.

Details

Technology & product

Configuration DetailUnknown PtXInternational Energy Agency · as of 2026
Power SourcePlanned renewable electricity from new Finnish wind parks under long-term contracts (announced 30 March 2022)

Status & timeline

Date online (tracker field)2028 (meaning under review)International Energy Agency · as of 2026

Additional project information

Administrative AreaRandom point in KotkaInternational Energy Agency · as of 2026
Capacity (Announced Size)50 MWInternational Energy Agency · as of 2026
Capacity (kt H2/y)8.66 kt H2/yInternational Energy Agency · as of 2026
Capacity (MWel)50 MWelInternational Energy Agency · as of 2026
Capacity (Nm³ H₂/h)11,111 Nm³ H₂/hInternational Energy Agency · as of 2026

Timeline

No recorded project events.

Sources & record history

Sources

Field sources

Shared date, confidence and value status appear once with their source above; a dash in the table refers to that source context.

FieldShown valueOriginal valueSourceDate basisMeaning
NameKotka power (Kotka)
View exact valueKotka power (Kotka)
Kotka - Ren-Gas OyCurrent
CountryFinland
View exact valueFinland
IEA Hydrogen Projects dataset——
Configuration DetailUnknown PtX
View exact valueUnknown PtX
IEA Hydrogen Projects dataset——
Power SourcePlanned renewable electricity from new Finnish wind parks under long-term contracts (announced 30 March 2022)
View exact valuePlanned renewable electricity from new Finnish wind parks under long-term contracts (announced 30 March 2022)
Feasibility study for a 100 million euro green hydrogen and domestic, renewable gas investment starts in the City of Kotka—
ProductCH4
View exact valueCH4
IEA Hydrogen Projects dataset——
TechnologyOther Electrolysis
View exact valueOther Electrolysis
IEA Hydrogen Projects dataset——
Capacity40 MW planned electrolyser output (announced 30 March 2022)
View exact value40 MW planned electrolyser output (announced 30 March 2022)
Feasibility study for a 100 million euro green hydrogen and domestic, renewable gas investment starts in the City of Kotka—
EventDate online : 2028
View exact value{"date":"2028","date_precision":"year","event":"Date online","basis":"iea_hydrogen_projects_raw.csv"}
IEA Hydrogen Projects dataset——
Progress StatusFeasibility
View exact valueFeasibility study
IEA Hydrogen Projects dataset——
Administrative AreaRandom point in Kotka
View exact valueRandom point in Kotka
IEA Hydrogen Projects dataset——
Capacity (Announced Size)50 MW
View exact value50 MW
IEA Hydrogen Projects dataset——
Capacity (kt H2/y)8.66 kt H2/y
View exact value8.662666666666667 kt H2/y
IEA Hydrogen Projects dataset——
Capacity (MWel)50 MWel
View exact value50 MWel
IEA Hydrogen Projects dataset——
Capacity (Nm³ H₂/h)11,111 Nm³ H₂/h
View exact value11111.111111111111 Nm³ H₂/h
IEA Hydrogen Projects dataset——

Record history

2 current sourced values · 6 older values · Record updated

H2Prism separates published values from estimates. Check the linked source before you use a value. · Back to Hydrogen projects

Records are compiled with AI assistance. Original source links are shown when available.