Hydrogen projects
Public hydrogen production and supply projects tracked by H2Prism
Shown in catalog order. Capacity sort is unavailable because these results have no explicitly identified electrolyser MW_e values; generic MW values are not compared as the same measure.
| Project | Status | Country | Technology | Product | Capacity · sort unavailable |
|---|---|---|---|---|---|
| H2V Marseille - Fos | Feasibilityiea.org · as of 2026 | Franceiea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | 300 MWiea.org · as of 2026 |
| NFC Belfort (Phase 1) | Operationaliea.org · as of 2026 | Franceiea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | 1 MWiea.org · as of 2026 |
| SoCalGaS - Kore demo facility | Demoiea.org · as of 2026 | United Statesiea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | Not confirmed |
| Port of Hanstholm - hydrogen | Not confirmed | Not confirmed | Not confirmed | hydrogen, e-methanol | Not confirmed |
| Port of Hanstholm - methanol | Dormantiea.org · as of 2026 | DenmarkPort of Hanstholm signs letter of intent with European Energy · as of 2022 | Not confirmed | MeOHiea.org · as of 2026 | Not confirmed |
| Lhyfe-Enerparc Luckau project | Dormantiea.org · as of 2026 | Germanyiea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | 5 MW |
| Ande - Fortescue Future Industries MoU | Dormantiea.org · as of 2026 | Paraguayiea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | 600 MWiea.org · as of 2026 |
| Ande - Maire Tecnimont - FerSam | Dormantiea.org · as of 2026 | Paraguayiea.org · as of 2026 | Not confirmed | Ammoniaiea.org · as of 2026 | 350 MWiea.org · as of 2026 |
| Ande - Neogreen Hydrogen, phase 1 | Feasibilityiea.org · as of 2026 | Paraguayiea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | 75 MWiea.org · as of 2026 |
| Ande - Neogreen Hydrogen, phase 2 | Conceptiea.org · as of 2026 | Paraguayiea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | 225 MWiea.org · as of 2026 |
| Dorset Green H2 Project | Operationaliea.org · as of 2026 | United Kingdomiea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | 0.9 MWiea.org · as of 2026 |
| Catalina Project, Phase 1 | Feasibilityiea.org · as of 2026 | Spainiea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | 500 MWiea.org · as of 2026 |
| Catalina Project, Phase 2 | Conceptiea.org · as of 2026 | Spainiea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | Not confirmed |
| Trzebinia refinery | OperationalH2Prism earlier record | Polandiea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | 2.02 MWiea.org · as of 2026 |
| Pembroke power station - Pembroke Green Hydrogen/Net Zero Centre (Phase 1) | Feasibilityiea.org · as of 2026 | United Kingdomiea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | 110 MWiea.org · as of 2026 |
| PETROTEL-LUKOIL refinery | Cancellediea.org · as of 2026 | Not confirmed | Not confirmed | H2iea.org · as of 2026 | Not confirmed |
| Lightsource bp - Dourogás project | Cancellediea.org · as of 2026 | PortugalIntroducing our green hydrogen partnership with Portugal’s Dourogás · as of 2021 | Not confirmed | H2iea.org · as of 2026 | Not confirmed |
| Geelong Hydrogen Hub | Feasibilityiea.org · as of 2026 | Australiaiea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | 716 MWiea.org · as of 2026 |
| H2Enable (Phase 1) | Feasibilityiea.org · as of 2026 | Portugaliea.org · as of 2026 | Not confirmed | Ammoniaiea.org · as of 2026 | 40 MWiea.org · as of 2026 |
| Firlough project | Feasibilityiea.org · as of 2026 | Irelandiea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | 10 MW minimum initial electrolyser; up to 80 MW maximum (planned)Production: Up to 4,000 kg/day at initial 10 MW; up to 31,200 kg/day at maximum 80 MW (planned) |
| Alcázar de San Juan - pHYnix | FID / Constructioniea.org · as of 2026 | Spainiea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | 10 MWiea.org · as of 2026 |
| Green CCU Hub Aalborg | Feasibilityiea.org · as of 2026 | Denmarkiea.org · as of 2026 | Not confirmed | MeOHiea.org · as of 2026 | 120 MWiea.org · as of 2026 |
| Blue Seal | Feasibilityiea.org · as of 2026 | Denmarkiea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | 50 MWiea.org · as of 2026 |
| Green lab skive (Phase III) | Conceptiea.org · as of 2026 | Denmarkiea.org · as of 2026 | Not confirmed | MeOHiea.org · as of 2026 | 226 MWiea.org · as of 2026 |
| European Energy, phase I | OperationalH2Prism earlier record | Denmarkiea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | 3.1 MWiea.org · as of 2026 |
| European Energy, phase II | Operational | Denmarkiea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | 5 MWiea.org · as of 2026 |
| Eurowind Mariagerfjord, phase 1 | Conceptiea.org · as of 2026 | Denmarkiea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | 43 MWiea.org · as of 2026 |
| Eurowind Mariagerfjord, phase 2 | Conceptiea.org · as of 2026 | Denmarkiea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | 43 MWiea.org · as of 2026 |
| Port of Aabenraa | Linde Gas decided not to participate after preliminary investigations; the port had not decided its next step (announced 25 May 2023) | Denmarkiea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | 100 MWiea.org · as of 2026 |
| Port of Aabenraa, Kasso Power-to-X facility | OperationalH2Prism earlier record | DenmarkEuropean Energy (https://europeanenergy.com/2025/05/13/kasso-e-methanol-facility-officially-inaugurated/) · as of 2025 | Not confirmed | MeOHiea.org · as of 2026 | 52 MWiea.org · as of 2026Production: Annual production capacity of 42,000 tonnes of e-methanol |
| Vordingborg biofuels | Dormantiea.org · as of 2026 | Denmarkiea.org · as of 2026 | Not confirmed | MeOHiea.org · as of 2026 | 221 MWiea.org · as of 2026 |
| Aalborg MeOH project | Dormantiea.org · as of 2026 | Denmarkiea.org · as of 2026 | Not confirmed | MeOHiea.org · as of 2026 | 350 MWiea.org · as of 2026 |
| CCU biogas (11x36MW) | Conceptiea.org · as of 2026 | Denmarkiea.org · as of 2026 | Not confirmed | CH4iea.org · as of 2026 | 396 MWiea.org · as of 2026 |
| Fortescue Future Industries - Incitec Pivot MoU | Conceptiea.org · as of 2026 | Australiaiea.org · as of 2026 | Not confirmed | Ammoniaiea.org · as of 2026 | 577 MWiea.org · as of 2026 |
| Fortescue Future Industries - Refining NZ MoU | Dormantiea.org · as of 2026 | New Zealandiea.org · as of 2026 | Not confirmed | Synfuelsiea.org · as of 2026 | 300 MWiea.org · as of 2026 |
| Enagas - CEAR MoU | Conceptiea.org · as of 2026 | Spainiea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | Planned 30 MW electrolysis for green hydrogen production (announced 21 December 2021) |
| Sun Brilliance West Australia Project, phase 1 | Feasibilityiea.org · as of 2026 | Australiaiea.org · as of 2026 | Not confirmed | green urea | 300 MW of electrolyzersProduction: is designed to generate approximately 1,000 tons of green urea per day |
| Sun Brilliance West Australia Project, phase 2 and 3 | Conceptiea.org · as of 2026 | Australiaiea.org · as of 2026 | Not confirmed | Ammoniaiea.org · as of 2026 | 1900 MWiea.org · as of 2026 |
| Great Falls - Calumet & Montana Renewables | FID / Constructioniea.org · as of 2026 | United Statesiea.org · as of 2026 | Not confirmed | Synfuelsiea.org · as of 2026 | 2.37 MWiea.org · as of 2026 |
| Fortescue Future Industries Gull Island | Not confirmed | Not confirmed | Not confirmed | Not confirmed | Not confirmed |
| Port of South Louisiana | Conceptiea.org · as of 2026 | United Statesiea.org · as of 2026 | Not confirmed | Ammoniaiea.org · as of 2026 | 3,035 MWiea.org · as of 2026 |
| Hive Energy green ammonia plant | Cancellediea.org · as of 2026 | Spainiea.org · as of 2026 | Not confirmed | Ammoniaiea.org · as of 2026 | Not confirmed |
| Cactus Energia Verde Port of Pecem | Feasibilityiea.org · as of 2026 | Braziliea.org · as of 2026 | Not confirmed | Ammoniaiea.org · as of 2026 | 1,120 MWiea.org · as of 2026 |
| Ingenostrum - Total Eren MoU | Conceptiea.org · as of 2026 | Braziliea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | Not confirmed |
| Reuze | Dormantiea.org · as of 2026 | Franceiea.org · as of 2026 | Not confirmed | Synfuelsiea.org · as of 2026 | 400 MWiea.org · as of 2026 |
| Octopus Hydrogen - BayWa MoU | FID / Constructioniea.org · as of 2026 | United Kingdomiea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | 15 MWiea.org · as of 2026 |
| Atacama Hydrogen Hub, phase 1 | Feasibilityiea.org · as of 2026 | Chileiea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | 10 MWiea.org · as of 2026 |
| Atacama Hydrogen Hub, phase 2 | Conceptiea.org · as of 2026 | Chileiea.org · as of 2026 | Not confirmed | Ammoniaiea.org · as of 2026 | 1900 MWiea.org · as of 2026 |
| Faraday - ACH-MRP | Feasibilityiea.org · as of 2026 | ChileMinisterio de Bienes Nacionales / Biblioteca del Congreso Nacional de Chile (https://www.bcn.cl/leychile/Navegar/imprimir?idNorma=1210618&idVersion=2025-01-25) · as of 2025 | Not confirmed | Ammoniaiea.org · as of 2026 | 2000 MWiea.org · as of 2026 |
| H1 Magallanes | Dormantiea.org · as of 2026 | Chileiea.org · as of 2026 | Not confirmed | Ammoniaiea.org · as of 2026 | 981 MWiea.org · as of 2026 |
| Aker - Berlevag | Feasibilityiea.org · as of 2026 | Norwayiea.org · as of 2026 | Not confirmed | Ammoniaiea.org · as of 2026 | 100 MW hydrogen plant design (announced 22 June 2021) |
| Aker - Rjukan, phase 1 | FID / Constructioniea.org · as of 2026 | Norwayiea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | 25 MWiea.org · as of 2026 |
| Aker - Rjukan, phase 2 | Feasibilityiea.org · as of 2026 | Norwayiea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | 15 MWiea.org · as of 2026 |
| Heliogen Arizona green H2 | Conceptiea.org · as of 2026 | United Statesiea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | 325 MWiea.org · as of 2026 |
| BP Castellon refinery, phase 2 | Feasibilityiea.org · as of 2026 | Spainiea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | 100 MWiea.org · as of 2026 |
| Wilhelmshaven , phase 2 | Conceptiea.org · as of 2026 | Germanyiea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | 800 MWiea.org · as of 2026 |
| China Coal Ordos Energy and Chemical | FID / Constructioniea.org · as of 2026 | ChinaOrdos Municipal People’s Government (https://www.ordos.gov.cn/gk_128120/zdjsxm/xmsg/202411/t20241127_3724482.html) · as of 2024 | Not confirmed | MeOHiea.org · as of 2026 | 213 MWiea.org · as of 2026 |
| Nazare Green Hydrogen Valley, phase 1 | Feasibilityiea.org · as of 2026 | Portugaliea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | 40 MWiea.org · as of 2026 |
| Nazare Green Hydrogen Valley, phase 2 | Conceptiea.org · as of 2026 | Portugaliea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | 540 MWiea.org · as of 2026 |
| Sinopec Yanshan Petrochemical | Demoiea.org · as of 2026 | Chinaiea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | 1.25 MWiea.org · as of 2026 |
| Green Crane, Murcia (part of Green Crane Gigafactory) | Feasibilityiea.org · as of 2026 | Spainiea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | 144 MWiea.org · as of 2026 |
| Lacq Hydrogen | FeasibilityENTSOG (https://www.entsog.eu/sites/default/files/2022-08/entsog_GRIP_South_2021_220727.pdf) | Spainiea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | 5,772 MWiea.org · as of 2026 |
| First HyDeal hub, phase 1 | Feasibilityiea.org · as of 2026 | Spainiea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | 1,200 MWiea.org · as of 2026 |
| First HyDeal hub, completion | ConceptArcelorMittal España (https://spain.arcelormittal.com/comunicados/hydeal-espana-hub-hidrogeno/) · as of 2022 | SpainArcelorMittal España (https://spain.arcelormittal.com/comunicados/hydeal-espana-hub-hidrogeno/) · as of 2022 | Not confirmed | H2iea.org · as of 2026 | 2100 MWiea.org · as of 2026 |
| Hunter Valley hydrogen hub - Phase I | Feasibilityiea.org · as of 2026 | Australiaiea.org · as of 2026 | Not confirmed | Ammoniaiea.org · as of 2026 | 50 MWiea.org · as of 2026 |
| O&L group - CMB.TECH hydrogen hub | Operationaliea.org · as of 2026 | Namibiaiea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | 4 MWiea.org · as of 2026 |
| White Martins - Rio Grande do Sul green hydrogen MoU | Not confirmed | Braziliea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | Not confirmed |
| Hazer-FortisBC Demonstration Facility | Feasibilityiea.org · as of 2026 | Canadaiea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | Not confirmed |
| Ballylumford energy storage demo project | Feasibilityiea.org · as of 2026 | United Kingdomiea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | 20 MWiea.org · as of 2026 |
| Bell Bay smelter | Not confirmed | Not confirmed | Not confirmed | H2iea.org · as of 2026 | Not confirmed |
| Raahe hub | Conceptiea.org · as of 2026 | FinlandRaahe and hydrogen | Not confirmed | H2iea.org · as of 2026 | Not confirmed |
| ExxonMobil's Baytown Project | On holdiea.org · as of 2026 | United Statesiea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | Not confirmed |
| New Fortress Energy green hydrogen US gulf, phase 1 | On holdiea.org · as of 2026 | United Statesiea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | 120 MWiea.org · as of 2026 |
| New Fortress Energy green hydrogen US gulf, phase 2 | On holdiea.org · as of 2026 | United Statesiea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | 80 MWiea.org · as of 2026 |
| Air Liquide Dunkirk | FeasibilityAir Liquide (https://www.airliquide.com/group/press-releases-news/2021-03-17/air-liquide-and-arcelormittal-join-forces-accelerate-decarbonization-steel-production-basin-dunkirk) · as of 2021 | FranceMinistère de la Transition écologique et de la Cohésion des territoires (https://portail.documentation.developpement-durable.gouv.fr/pub/CGE00000216-securite-developpement-filiere-hydrogene.html) | Not confirmed | H2iea.org · as of 2026 | 400 MWiea.org · as of 2026 |
| Renewstable Swakopmund | Feasibilityiea.org · as of 2026 | Namibiaiea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | 26.9 MWiea.org · as of 2026 |
| Sonangol | On holdiea.org · as of 2026 | Angolaiea.org · as of 2026 | Not confirmed | Ammoniaiea.org · as of 2026 | 400 MWiea.org · as of 2026 |
| Petronas-ENEOS MoU | Conceptiea.org · as of 2026 | Malaysiaiea.org · as of 2026 | Not confirmed | LOHCiea.org · as of 2026 | 289 MWiea.org · as of 2026 |
| Green Hydrogen and Chemicals Company SAOC Phase I | FID / Constructioniea.org · as of 2026 | Oman | Not confirmed | Ammoniaiea.org · as of 2026 | 320 MWiea.org · as of 2026 |
| Green Hydrogen and Chemicals SPC, phase II (former ACME-Scatec Oman) | Conceptiea.org · as of 2026 | Omaniea.org · as of 2026 | Not confirmed | Ammoniaiea.org · as of 2026 | 3,180 MWiea.org · as of 2026 |
| H2ercules | Dormantiea.org · as of 2026 | Germanyiea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | 1,000 MWiea.org · as of 2026 |
| Promigas | Demoiea.org · as of 2026 | Colombiaiea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | 0.022 MWiea.org · as of 2026 |
| Air Products Arizona | Decision announced to discontinue zero-carbon liquid hydrogen facility | United Statesiea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | 40 MWiea.org · as of 2026 |
| H2UDF, phase I | Dormantiea.org · as of 2026 | Spainiea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | 2.5 MWiea.org · as of 2026 |
| Hidroversol Castilla y León | Feasibilityiea.org · as of 2026 | Spainiea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | 200 MWiea.org · as of 2026 |
| H2UDF, phase II | Dormantiea.org · as of 2026 | Spainiea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | 7.5 MWiea.org · as of 2026 |
| AsturiasH2Valley, Aboño | On holdiea.org · as of 2026 | Spainiea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | 150 MWiea.org · as of 2026 |
| Inspira Madrid | FID / Constructioniea.org · as of 2026 | Spainiea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | 5 MWiea.org · as of 2026 |
| SolarHy Cordoba | Feasibilityiea.org · as of 2026 | Spainiea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | 55 MWiea.org · as of 2026 |
| Waste to hydrogen Boson Energy (H2-BEAM) | Conceptiea.org · as of 2026 | Spainiea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | Not confirmed |
| Green Hydrogen Kherson region, phase 1 | Dormantiea.org · as of 2026 | Ukraineiea.org · as of 2026 | Not confirmed | Ammoniaiea.org · as of 2026 | Not confirmed |
| Green Hydrogen Kherson region, phase 2 | Dormantiea.org · as of 2026 | Ukraineiea.org · as of 2026 | Not confirmed | Ammoniaiea.org · as of 2026 | Not confirmed |
| Green Hydrogen Kherson region, phase 3 | Dormantiea.org · as of 2026 | Ukraineiea.org · as of 2026 | Not confirmed | Ammoniaiea.org · as of 2026 | Not confirmed |
| Waste to hydrogen Boson Energy (BEH2X NO1) | Dormantiea.org · as of 2026 | Norwayiea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | Not confirmed |
| Ruse hydrogen project | Not confirmed | Not confirmed | Not confirmed | Not confirmed | Not confirmed |
| Emil'Hy- (Phase 1) | Conceptiea.org · as of 2026 | Franceiea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | 200 MWiea.org · as of 2026 |
| Emil'Hy- (Phase 2) | Dormantiea.org · as of 2026 | Franceiea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | 200 MWiea.org · as of 2026 |
| H2V Vigneux (Phase 1) | Cancellediea.org · as of 2026 | Franceiea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | Not confirmed |
| H2V Vigneux (Phase 3, final) | Cancellediea.org · as of 2026 | Franceiea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | Not confirmed |
| H2 Pierre-Bénite (Phase 1) | Cancellediea.org · as of 2026 | Franceiea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | 20 MWiea.org · as of 2026 |