H2Prism
Hydrogen calculators & data

White Martins - Rio Grande do Sul green hydrogen MoU

Brazil

Overview

Statusplanned; productive capacity undefined; buyer required for advancement
Country · regionBrazilInternational Energy Agency · as of 2026
TechnologyOther ElectrolysisInternational Energy Agency · as of 2026
ProductH2International Energy Agency · as of 2026

Capacity values retain their recorded units and scope. MW, kt H₂/y and Nm³ H₂/h are different measures; this page does not convert or add them without a shared operating basis. “Other Electrolysis” and “Unknown PtX” are recorded classifications, not a specific electrolyzer design or power-to-X route.

Details

Technology & product

Configuration DetailUnknown PtXInternational Energy Agency · as of 2026

Status & timeline

Lifecycle Stagepreliminary feasibility-study stage / potential project

Additional project information

Administrative AreaRio Grande portInternational Energy Agency · as of 2026
Progress StatusConceptInternational Energy Agency · as of 2026

Timeline

No recorded project events.

Sources & record history

Sources

Field sources

Shared date, confidence and value status appear once with their source above; a dash in the table refers to that source context.

FieldShown valueOriginal valueSourceDate basisMeaning
NameWhite Martins - Rio Grande do Sul green hydrogen MoU
View exact valueWhite Martins - Rio Grande do Sul green hydrogen MoU
White Martins assina acordo para hidrogênio verde no RSCurrent
CountryBrazil
View exact valueBrazil
IEA Hydrogen Projects dataset——
Configuration DetailUnknown PtX
View exact valueUnknown PtX
IEA Hydrogen Projects dataset——
ProductH2
View exact valueH2
IEA Hydrogen Projects dataset——
TechnologyOther Electrolysis
View exact valueOther Electrolysis
IEA Hydrogen Projects dataset——
Lifecycle Stagepreliminary feasibility-study stage / potential project
View exact valuepreliminary feasibility-study stage / potential project
White Martins e Rio Grande do Sul assinam acordo para produção de hidrogênio verdeCurrent
Progress Statusplanned; productive capacity undefined; buyer required for advancement
View exact valueplanned; productive capacity undefined; buyer required for advancement
White Martins quer ampliar fornecimento de gases industriais com nova planta no RSCurrent
Administrative AreaRio Grande port
View exact valueRio Grande port
IEA Hydrogen Projects dataset——
Progress StatusConcept
View exact valueConcept
IEA Hydrogen Projects dataset——

Record history

2 current sourced values · 4 older values · Record updated

H2Prism separates published values from estimates. Check the linked source before you use a value. · Back to Hydrogen projects

Records are compiled with AI assistance. Original source links are shown when available.