H2Prism
Hydrogen calculators & data

Port of Aabenraa

Denmark

Overview

StatusLinde Gas decided not to participate after preliminary investigations; the port had not decided its next step (announced 25 May 2023)
Country · regionDenmarkInternational Energy Agency · as of 2026
TechnologyOther ElectrolysisInternational Energy Agency · as of 2026
ProductH2International Energy Agency · as of 2026
Capacity100 MWInternational Energy Agency · as of 2026

Capacity values retain their recorded units and scope. MW, kt H₂/y and Nm³ H₂/h are different measures; this page does not convert or add them without a shared operating basis. “Other Electrolysis” and “Unknown PtX” are recorded classifications, not a specific electrolyzer design or power-to-X route.

Details

Technology & product

Configuration DetailUnknown PtXInternational Energy Agency · as of 2026

Additional project information

Administrative AreaPort of AabenraaInternational Energy Agency · as of 2026
Progress StatusDormantInternational Energy Agency · as of 2026
Capacity (Announced Size)100 MWInternational Energy Agency · as of 2026
Capacity (Nm³ H₂/h)22,222 Nm³ H₂/hInternational Energy Agency · as of 2026
Capacity (kt H2/y)17.3 kt H2/yInternational Energy Agency · as of 2026

Timeline

No recorded project events.

Sources & record history

Sources

Field sources

Shared date, confidence and value status appear once with their source above; a dash in the table refers to that source context.

FieldShown valueOriginal valueSourceDate basisMeaning
NamePort of Aabenraa
View exact valuePort of Aabenraa
IEA Hydrogen Projects dataset——
CountryDenmark
View exact valueDenmark
IEA Hydrogen Projects dataset——
Configuration DetailUnknown PtX
View exact valueUnknown PtX
IEA Hydrogen Projects dataset——
ProductH2
View exact valueH2
IEA Hydrogen Projects dataset——
TechnologyOther Electrolysis
View exact valueOther Electrolysis
IEA Hydrogen Projects dataset——
Capacity100 MW
View exact value100 MW
IEA Hydrogen Projects dataset——
Progress StatusLinde Gas decided not to participate after preliminary investigations; the port had not decided its next step (announced 25 May 2023)
View exact valueLinde Gas decided not to participate after preliminary investigations; the port had not decided its next step (announced 25 May 2023)
Opdatering vedrørende muligheden for et PtX-projekt på Aabenraa HavnCurrent
Administrative AreaPort of Aabenraa
View exact valuePort of Aabenraa
IEA Hydrogen Projects dataset——
Progress StatusDormant
View exact valueDormant
IEA Hydrogen Projects dataset——
Capacity (Announced Size)100 MW
View exact value100MW
IEA Hydrogen Projects dataset——
Capacity (Nm³ H₂/h)22,222 Nm³ H₂/h
View exact value22222.222222222223 Nm³ H₂/h
IEA Hydrogen Projects dataset——
Capacity (kt H2/y)17.3 kt H2/y
View exact value17.325333333333333 kt H2/y
IEA Hydrogen Projects dataset——

Record history

1 current sourced value · 5 older values · Record updated

H2Prism separates published values from estimates. Check the linked source before you use a value. · Back to Hydrogen projects

Records are compiled with AI assistance. Original source links are shown when available.