Faraday - ACH-MRP
Overview
StatusFeasibilityInternational Energy Agency · as of 2026
Country · regionChileMinisterio de Bienes Nacionales / Biblioteca del Congreso Nacional de Chile · Antofagasta RegionMinisterio de Bienes Nacionales / Biblioteca del Congreso Nacional de Chile
TechnologyOther ElectrolysisInternational Energy Agency · as of 2026
ProductAmmoniaInternational Energy Agency · as of 2026
Capacity2000 MWInternational Energy Agency · as of 2026
Capacity values retain their recorded units and scope. MW, kt H₂/y and Nm³ H₂/h are different measures; this page does not convert or add them without a shared operating basis. “Other Electrolysis” and “Unknown PtX” are recorded classifications, not a specific electrolyzer design or power-to-X route.
Details
Technology & product
ComponentselectrolyzerMinisterio de Bienes Nacionales / Biblioteca del Congreso Nacional de ChileammoniaMinisterio de Bienes Nacionales / Biblioteca del Congreso Nacional de Chiledesalination plantMinisterio de Bienes Nacionales / Biblioteca del Congreso Nacional de Chile
Configuration DetailUnknown PtXInternational Energy Agency · as of 2026
Project Typehydrogen production facilityMinisterio de Bienes Nacionales / Biblioteca del Congreso Nacional de Chile
Status & timeline
Date online (tracker field)2027 (meaning under review)International Energy Agency · as of 2026
Location & names
Site NameTaltalMinisterio de Bienes Nacionales / Biblioteca del Congreso Nacional de Chile
AliasFaraday - ACH-MRP; FaradayMinisterio de Bienes Nacionales / Biblioteca del Congreso Nacional de Chile
Local NameProyecto H2V FaradayMinisterio de Bienes Nacionales / Biblioteca del Congreso Nacional de Chile
Official NameProyecto Faraday; Proyecto H2V FaradayMinisterio de Bienes Nacionales / Biblioteca del Congreso Nacional de Chile
Additional project information
Administrative AreaRandom location in AntofagastaInternational Energy Agency · as of 2026
CountryChileInternational Energy Agency · as of 2026
Capacity (Nm³ H₂/h)444,444 Nm³ H₂/hInternational Energy Agency · as of 2026
Capacity (kt H2/y)347 kt H2/yInternational Energy Agency · as of 2026
Capacity (Announced Size)2000 MW or 180kt H2/y productionInternational Energy Agency · as of 2026
Timeline
- Investment agreement signed : 2021-02-19Mainstream Renewable Power
Sources & record history
Sources
- IEA Hydrogen Projects dataset Shared by 12 fields: Snapshot 2026-06-18 · Confidence: reported · Older value (2026)
- Ministerio de Bienes Nacionales / Biblioteca del Congreso Nacional de Chile Ministerio de Bienes Nacionales / Biblioteca del Congreso Nacional de Chile (https://www.bcn.cl/leychile/Navegar/imprimir?idNorma=1210618&idVersion=2025-01-25)
- Ministerio de Bienes Nacionales Ministerio de Bienes Nacionales (https://nuevo.leychile.cl/servicios/Consulta/Exportar?exportar_con_notas_al_pie=False&exportar_con_notas_bcn=False&exportar_con_notas_originales=False&exportar_formato=pdf&hddResultadoExportar=1210620.2025-01-25.0.0%23&nombrearchivo=Decreto-4-EXENTO_25-ENE-2025&radioExportar=Normas)
- Gobierno Regional de Antofagasta Gobierno Regional de Antofagasta (https://coreantofagasta.cl/coreantofagasta/site/docs/20250404/20250404191649/acta_774.pdf)
- H2Prism earlier record (SRC-C-P200)
- Mainstream Renewable Power Mainstream Renewable Power (https://www.mainstreamrp.com/news/mainstream-and-aker-clean-hydrogen-to-collaborate-on-green-hydrogen-and-low-cost-ammonia-in-chile/)
Field sources
Shared date, confidence and value status appear once with their source above; a dash in the table refers to that source context.
Record history
0 current sourced values · 17 older values · Record updated