H2Enable (Phase 1)
Overview
StatusFeasibilityInternational Energy Agency · as of 2026
Country · regionPortugalInternational Energy Agency · as of 2026
TechnologyALKInternational Energy Agency · as of 2026
ProductAmmoniaInternational Energy Agency · as of 2026
Capacity40 MWInternational Energy Agency · as of 2026
Capacity values retain their recorded units and scope. MW, kt H₂/y and Nm³ H₂/h are different measures; this page does not convert or add them without a shared operating basis.
Details
Technology & product
Final UsePlanned green hydrogen supply for natural gas grid injection, long-haul transport and Bondalti chemical processes (July 2023 announcement)
Status & timeline
Date online (tracker field)2028 (meaning under review)International Energy Agency · as of 2026
Additional project information
Administrative AreaEstarrejaInternational Energy Agency · as of 2026
Capacity (Nm³ H₂/h)8,696 Nm³ H₂/hInternational Energy Agency · as of 2026
Capacity (kt H2/y)6.78 kt H2/yInternational Energy Agency · as of 2026
Capacity (Announced Size)40 MWInternational Energy Agency · as of 2026
Timeline
No recorded project events.
Sources & record history
Sources
- Nel Hydrogen Nel ASA: Receives purchase order for 40 MW electrolyser equipment from Bondalti | Nel Hydrogen
- International Energy Agency IEA Hydrogen Projects dataset Shared by 10 fields: Snapshot 2026-06-18 · Confidence: reported · Older value (2026)
- Nel ASA Nel ASA: Receives purchase order for 40 MW electrolyser equipment from Bondalti
Field sources
Shared date, confidence and value status appear once with their source above; a dash in the table refers to that source context.
| Field | Shown value | Original value | Source | Date basis | Meaning |
|---|---|---|---|---|---|
| Name | H2Enable (Phase 1) | View exact valueH2Enable (Phase 1) | Nel ASA: Receives purchase order for 40 MW electrolyser equipment from Bondalti | Nel Hydrogen | Current | |
| Country | Portugal | View exact valuePortugal | IEA Hydrogen Projects dataset | — | — |
| Final Use | Planned green hydrogen supply for natural gas grid injection, long-haul transport and Bondalti chemical processes (July 2023 announcement) | View exact valuePlanned green hydrogen supply for natural gas grid injection, long-haul transport and Bondalti chemical processes (July 2023 announcement) | Nel ASA: Receives purchase order for 40 MW electrolyser equipment from Bondalti | Current | |
| Product | Ammonia | View exact valueAmmonia | IEA Hydrogen Projects dataset | — | — |
| Technology | ALK | View exact valueALK | IEA Hydrogen Projects dataset | — | — |
| Capacity | 40 MW | View exact value40 MW | IEA Hydrogen Projects dataset | — | — |
| Event | Date online : 2028 | View exact value{"date":"2028","date_precision":"year","event":"Date online","basis":"iea_hydrogen_projects_raw.csv"} | IEA Hydrogen Projects dataset | — | — |
| Progress Status | Feasibility | View exact valueFeasibility study | IEA Hydrogen Projects dataset | — | — |
| Administrative Area | Estarreja | View exact valueEstarreja | IEA Hydrogen Projects dataset | — | — |
| Capacity (Nm³ H₂/h) | 8,696 Nm³ H₂/h | View exact value8695.652173913044 Nm³ H₂/h | IEA Hydrogen Projects dataset | — | — |
| Capacity (kt H2/y) | 6.78 kt H2/y | View exact value6.779478260869565 kt H2/y | IEA Hydrogen Projects dataset | — | — |
| Capacity (Announced Size) | 40 MW | View exact value40 MW | IEA Hydrogen Projects dataset | — | — |
Record history
1 current sourced value · 6 older values · Record updated