GalpH2Park-I (Phase I)
Overview
StatusFID / ConstructionH2Prism earlier record
Country · regionPortugalGalp · PT-02 AlentejoGalp
TechnologyPEM
ProductH2International Energy Agency · as of 2026
Capacity100 MWInternational Energy Agency · as of 2026
Capacity values retain their recorded units and scope. MW, kt H₂/y and Nm³ H₂/h are different measures; this page does not convert or add them without a shared operating basis.
Details
Technology & product
ComponentsElectrolyser (PEM)Galp
Configuration DetailTen 10 MW Plug Power GenEco electrolysis modules for the 100 MW Sines refinery unit; Galp reported completion of module installation on 2026-01-23.
Project GroupGalp H2 Park (Phase I)Galp
Project Typehydrogen production facilityGalp
Capacity & economics
Production VolumePlanned output of up to 15,000 tons of hydrogen per year for the 100 MW Sines unit
Status & timeline
Date online (tracker field)2026 (meaning under review)International Energy Agency · as of 2026
Location & names
Site NameSines RefineryGalp
AliasGalpH2Park-IGalp
Official NameProjeto 'Galp H2 Park'Galp
Additional project information
Administrative AreaSines refineryInternational Energy Agency · as of 2026
CountryPortugalInternational Energy Agency · as of 2026
Progress StatusFID / ConstructionInternational Energy Agency · as of 2026
TechnologyPEMInternational Energy Agency · as of 2026
Capacity (Announced Size)100 MWInternational Energy Agency · as of 2026
Capacity (kt H2/y)15 kt H2/yInternational Energy Agency · as of 2026
Capacity (Nm³ H₂/h)19,231 Nm³ H₂/hInternational Energy Agency · as of 2026
Timeline
- Final investment decision (FID) : 2023-09Galp
- Equipment ordered : 2023-09Galp
- Construction start : 2023-H2Galp
- Target start of operation : 2026-H2Galp
Sources & record history
Sources
- IEA Hydrogen Projects dataset Shared by 11 fields: Snapshot 2026-06-18 · Confidence: reported · Older value (2026)
- Galp Galp (https://www.galp.com/corp/pt/sobre-nos/o-que-fazemos/industrial-e-midstream/h2)
- H2Prism earlier record (SRC-C-P200)
- www.galp.com Galp instala 10.º eletrolisador do projeto de Hidrogénio Verde de 100MW em Sines
- www.plugpower.com Delivering 100 MW of On Site Green Hydrogen at Galp's Sines Refinery – Case Study Shared by 2 fields: Current
- Galp Galp (https://www.galp.com/corp/pt/media/comunicados-de-imprensa/comunicado/id/1661/galp-instala-10-eletrolisador-do-projeto-de-hidrogenio-verde-de-100mw-em-sines)
- Galp Galp (https://www.galp.com/corp/en/investors/publications-and-announcements/investor-announcements/investor-announcement/id/1489/final-investment-decision-on-green-hydrogen-and-hvosaf-projects-in-sines)
- H2Prism earlier record (SRC-S3)
Field sources
Shared date, confidence and value status appear once with their source above; a dash in the table refers to that source context.
| Field | Shown value | Original value | Source | Date basis | Meaning |
|---|---|---|---|---|---|
| Name | GalpH2Park-I (Phase I) | View exact valueGalpH2Park-I (Phase I) | IEA Hydrogen Projects dataset | — | — |
| Site Name | Sines Refinery | View exact valueSines Refinery | Galp (https://www.galp.com/corp/pt/sobre-nos/o-que-fazemos/industrial-e-midstream/h2); Galp (https://www.galp.com/corp/pt/sobre-nos/o-que-fazemos/industrial-e-midstream/h2); H2Prism earlier record (SRC-C-P200); H2Prism earlier record (SRC-C-P200) | Older value | |
| Administrative Area | PT-02 Alentejo | View exact valuePT-02 Alentejo | Galp (https://www.galp.com/corp/pt/sobre-nos/o-que-fazemos/industrial-e-midstream/h2); Galp (https://www.galp.com/corp/pt/sobre-nos/o-que-fazemos/industrial-e-midstream/h2); H2Prism earlier record (SRC-C-P200); H2Prism earlier record (SRC-C-P200) | Older value | |
| Alias | GalpH2Park-I | View exact value[{"kind":"source_label","name":"GalpH2Park-I"}] | Galp (https://www.galp.com/corp/pt/sobre-nos/o-que-fazemos/industrial-e-midstream/h2); Galp (https://www.galp.com/corp/pt/sobre-nos/o-que-fazemos/industrial-e-midstream/h2); H2Prism earlier record (SRC-C-P200); H2Prism earlier record (SRC-C-P200) | Older value | |
| Country | Portugal | View exact valuePRT | Galp (https://www.galp.com/corp/pt/sobre-nos/o-que-fazemos/industrial-e-midstream/h2); Galp (https://www.galp.com/corp/pt/sobre-nos/o-que-fazemos/industrial-e-midstream/h2); H2Prism earlier record (SRC-C-P200); H2Prism earlier record (SRC-C-P200) | Older value | |
| Official Name | Projeto 'Galp H2 Park' | View exact value[{"lang":"pt","name":"Projeto 'Galp H2 Park'","evidence":["E-01"]}] | Galp (https://www.galp.com/corp/pt/sobre-nos/o-que-fazemos/industrial-e-midstream/h2); Galp (https://www.galp.com/corp/pt/sobre-nos/o-que-fazemos/industrial-e-midstream/h2); H2Prism earlier record (SRC-C-P200); H2Prism earlier record (SRC-C-P200) | Older value | |
| Components | Electrolyser (PEM) | View exact value{"kind":"전해조","tech":"PEM","tech_raw":"tecnologia PEM","component_id":"CMP-1"} | Galp (https://www.galp.com/corp/pt/sobre-nos/o-que-fazemos/industrial-e-midstream/h2); Galp (https://www.galp.com/corp/pt/sobre-nos/o-que-fazemos/industrial-e-midstream/h2); H2Prism earlier record (SRC-C-P200); H2Prism earlier record (SRC-C-P200) | Older value | |
| Configuration Detail | Ten 10 MW Plug Power GenEco electrolysis modules for the 100 MW Sines refinery unit; Galp reported completion of module installation on 2026-01-23. | View exact valueTen 10 MW Plug Power GenEco electrolysis modules for the 100 MW Sines refinery unit; Galp reported completion of module installation on 2026-01-23. | Galp instala 10.º eletrolisador do projeto de Hidrogénio Verde de 100MW em Sines | Current | |
| Product | H2 | View exact valueH2 | IEA Hydrogen Projects dataset | — | — |
| Project Group | Galp H2 Park (Phase I) | View exact value{"exists":true,"evidence":["E-03"],"group_name":"Galp H2 Park","phase_name":"Phase I","phase_order":1} | Galp (https://www.galp.com/corp/pt/sobre-nos/o-que-fazemos/industrial-e-midstream/h2); Galp (https://www.galp.com/corp/pt/sobre-nos/o-que-fazemos/industrial-e-midstream/h2); H2Prism earlier record (SRC-C-P200); H2Prism earlier record (SRC-C-P200) | Older value | |
| Project Type | hydrogen production facility | View exact valuehydrogen_production_facility | Galp (https://www.galp.com/corp/pt/sobre-nos/o-que-fazemos/industrial-e-midstream/h2); Galp (https://www.galp.com/corp/pt/sobre-nos/o-que-fazemos/industrial-e-midstream/h2); H2Prism earlier record (SRC-C-P200); H2Prism earlier record (SRC-C-P200) | Older value | |
| Technology | PEM | View exact valuePEM | Delivering 100 MW of On Site Green Hydrogen at Galp's Sines Refinery – Case Study | — | |
| Capacity | 100 MW | View exact value100 MW | IEA Hydrogen Projects dataset | — | — |
| Production Volume | Planned output of up to 15,000 tons of hydrogen per year for the 100 MW Sines unit | View exact valuePlanned output of up to 15,000 tons of hydrogen per year for the 100 MW Sines unit | Delivering 100 MW of On Site Green Hydrogen at Galp's Sines Refinery – Case Study | — | |
| Event | Final investment decision (FID) : 2023-09 | View exact value{"date":"2023-09","tags":{"as_of":"2026-01-23","source":"Galp","evidence":["E-04"],"judged_by":"worker_review","confidence":"high","accessed_at":"2026-08-17T18:07:42Z"},"ev_type":"EV-05","event_id":"V-01","raw_date_text":"A decisão de construção desta unidade de eletrólise foi tomada em setembro de 2023","date_precision":"month"} | Galp (https://www.galp.com/corp/pt/media/comunicados-de-imprensa/comunicado/id/1661/galp-instala-10-eletrolisador-do-projeto-de-hidrogenio-verde-de-100mw-em-sines); H2Prism earlier record (SRC-C-P200); H2Prism earlier record (SRC-C-P200) | Older value | |
| Event | Construction start : 2023-H2 | View exact value{"date":"2023-H2","tags":{"as_of":null,"source":"Galp","evidence":["E-03"],"judged_by":"transcription","confidence":"high","accessed_at":"2026-08-17T18:07:42Z"},"ev_type":"EV-10","event_id":"V-02","raw_date_text":"A fase de construção do projeto Galp H2 Park tem início no 2.º semestre de 2023","date_precision":"half"} | Galp (https://www.galp.com/corp/pt/sobre-nos/o-que-fazemos/industrial-e-midstream/h2); H2Prism earlier record (SRC-C-P200); H2Prism earlier record (SRC-C-P200) | Older value | |
| Event | Equipment ordered : 2023-09 | View exact value{"date":"2023-09","tags":{"as_of":"2023-09","source":"Galp","evidence":["E-02"],"judged_by":"transcription","confidence":"high","accessed_at":"2026-08-17T18:07:42Z"},"ev_type":"EV-08","event_id":"V-03","raw_date_text":"Plug Power was awarded the order for the 100 MW proton exchange membrane (PEM) electrolysers","date_precision":"month"} | Galp (https://www.galp.com/corp/en/investors/publications-and-announcements/investor-announcements/investor-announcement/id/1489/final-investment-decision-on-green-hydrogen-and-hvosaf-projects-in-sines); H2Prism earlier record (SRC-C-P200); H2Prism earlier record (SRC-C-P200) | Older value | |
| Event | Target start of operation : 2026-H2 | View exact value{"date":"2026-H2","tags":{"as_of":null,"source":"Galp","evidence":["E-01"],"judged_by":"transcription","confidence":"high","accessed_at":"2026-08-17T18:07:42Z"},"ev_type":"EV-14","event_id":"V-04","raw_date_text":"2026 (2.º Semestre) data prevista para o início da operação da unidade","date_precision":"half"} | Galp (https://www.galp.com/corp/pt/sobre-nos/o-que-fazemos/industrial-e-midstream/h2); H2Prism earlier record (SRC-C-P200); H2Prism earlier record (SRC-C-P200) | Older value | |
| Event | Date online : 2026 | View exact value{"date":"2026","date_precision":"year","event":"Date online","basis":"iea_hydrogen_projects_raw.csv"} | IEA Hydrogen Projects dataset | — | — |
| Progress Status | FID / Construction | View exact valueFID/Construction | H2Prism earlier record (SRC-S3); H2Prism earlier record (SRC-S3) | Older value | |
| Administrative Area | Sines refinery | View exact valueSines refinery | IEA Hydrogen Projects dataset | — | — |
| Country | Portugal | View exact valuePortugal | IEA Hydrogen Projects dataset | — | — |
| Progress Status | FID / Construction | View exact valueFID/Construction | IEA Hydrogen Projects dataset | — | — |
| Technology | PEM | View exact valuePEM | IEA Hydrogen Projects dataset | — | — |
| Capacity (Announced Size) | 100 MW | View exact value100 MW | IEA Hydrogen Projects dataset | — | — |
| Capacity (kt H2/y) | 15 kt H2/y | View exact value14.993076923076922 kt H2/y | IEA Hydrogen Projects dataset | — | — |
| Capacity (Nm³ H₂/h) | 19,231 Nm³ H₂/h | View exact value19230.76923076923 Nm³ H₂/h | IEA Hydrogen Projects dataset | — | — |
Record history
3 current sourced values · 16 older values · Record updated