Enertrag Magdeburg
Overview
StatusFID / ConstructionInternational Energy Agency · as of 2026
Country · regionGermanyInternational Energy Agency · as of 2026
TechnologyPEMInternational Energy Agency · as of 2026
ProductH2International Energy Agency · as of 2026
CapacityFirst-stage PEM electrolyser: 10 MW
Capacity values retain their recorded units and scope. MW, kt H₂/y and Nm³ H₂/h are different measures; this page does not convert or add them without a shared operating basis.
Details
Technology & product
Final UsePlanned industrial decarbonisation, long-haul transport fuel, pipeline supply and long-term electricity generation
Power SourceRenewable electricity from ENERTRAG own wind farms
Status & timeline
Lifecycle StageConstruction started (reported 13 May 2024)
Date online (tracker field)2026 (meaning under review)International Energy Agency · as of 2026
Additional project information
Administrative AreaMagdeburgInternational Energy Agency · as of 2026
Capacity (MWel)10 MWelInternational Energy Agency · as of 2026
Capacity (Announced Size)10 MWInternational Energy Agency · as of 2026
Capacity (Nm³ H₂/h)1,923 Nm³ H₂/hInternational Energy Agency · as of 2026
Capacity (kt H2/y)1.5 kt H2/yInternational Energy Agency · as of 2026
Timeline
No recorded project events.
Sources & record history
Sources
- Elogen
- International Energy Agency IEA Hydrogen Projects dataset Shared by 10 fields: Snapshot 2026-06-18 · Confidence: reported · Older value (2026)
- ENERTRAG SE Spatenstich für Elektrolyseur im Industriepark Osterweddingen Shared by 4 fields: Current
Field sources
Shared date, confidence and value status appear once with their source above; a dash in the table refers to that source context.
| Field | Shown value | Original value | Source | Date basis | Meaning |
|---|---|---|---|---|---|
| Name | Enertrag Magdeburg | View exact valueEnertrag Magdeburg | Elogen | Current | |
| Country | Germany | View exact valueGermany | IEA Hydrogen Projects dataset | — | — |
| Final Use | Planned industrial decarbonisation, long-haul transport fuel, pipeline supply and long-term electricity generation | View exact valuePlanned industrial decarbonisation, long-haul transport fuel, pipeline supply and long-term electricity generation | Spatenstich für Elektrolyseur im Industriepark Osterweddingen | — | |
| Power Source | Renewable electricity from ENERTRAG own wind farms | View exact valueRenewable electricity from ENERTRAG own wind farms | Spatenstich für Elektrolyseur im Industriepark Osterweddingen | — | |
| Product | H2 | View exact valueH2 | IEA Hydrogen Projects dataset | — | — |
| Technology | PEM | View exact valuePEM | IEA Hydrogen Projects dataset | — | — |
| Capacity | First-stage PEM electrolyser: 10 MW | View exact valueFirst-stage PEM electrolyser: 10 MW | Spatenstich für Elektrolyseur im Industriepark Osterweddingen | — | |
| Event | Date online : 2026 | View exact value{"date":"2026","date_precision":"year","event":"Date online","basis":"iea_hydrogen_projects_raw.csv"} | IEA Hydrogen Projects dataset | — | — |
| Lifecycle Stage | Construction started (reported 13 May 2024) | View exact valueConstruction started (reported 13 May 2024) | Spatenstich für Elektrolyseur im Industriepark Osterweddingen | — | |
| Progress Status | FID / Construction | View exact valueFID/Construction | IEA Hydrogen Projects dataset | — | — |
| Administrative Area | Magdeburg | View exact valueMagdeburg | IEA Hydrogen Projects dataset | — | — |
| Capacity (MWel) | 10 MWel | View exact value10 MWel | IEA Hydrogen Projects dataset | — | — |
| Capacity (Announced Size) | 10 MW | View exact value10MW | IEA Hydrogen Projects dataset | — | — |
| Capacity (Nm³ H₂/h) | 1,923 Nm³ H₂/h | View exact value1923.076923076923 Nm³ H₂/h | IEA Hydrogen Projects dataset | — | — |
| Capacity (kt H2/y) | 1.5 kt H2/y | View exact value1.4993076923076922 kt H2/y | IEA Hydrogen Projects dataset | — | — |
Record history
4 current sourced values · 5 older values · Record updated