- Capacity
- 0.03 MW
- Target operation
- —
- Technology
- SOEC
- Country
- Spain
- Development stage
- Operational
Country scale
#179 by recorded MW among 187 projects with capacity recorded in this country.
- Lacq Hydrogen5,772 MW
- Hive H2 Albamed, phase 23,200 MW
- CoSin: Synthetic Natural Gas from Sewage, Barcelona0.03 MW
All stages are included. Capacity does not describe current production.
Project details
- Operation start
- 2018
- Product
- Synthetic methane · Methane
Sources (3)
- IEA Hydrogen Production Projects 2026 (preserved CSV edition, received 2026-10-24)
International Energy Agency · As of 2026-06-18
Original value: Gas grid injection (End use: Gas grid injection · Product: Synthetic methane)
Original value: Synthetic methane (Product: Synthetic methane)
Original value: 0.033440000000000004 MW
Original value: Operational
Original value: SOEC electrolyser (Technology: SOEC electrolyser)
Published value: 0.03344 MW
- International Energy Agency
International Energy Agency
Original value: 2018
Original value: 0.006860832000000001 (Capacity (kt H2/y))
Original value: SOEC electrolyser (Technology: SOEC electrolyser)
Original value: 8.8 (Capacity (Nm³ H₂/h))
- IEA Hydrogen Production Projects 2026
International Energy Agency
Original value: 2018
Original value: Operational
Original value: 0.006860832000000001 (Capacity (kt H2/y))
Original value: SOEC electrolyser (Technology: SOEC electrolyser)
Original value: Methane (Product: Methane)
Original value: 20m3 CH4/h (Announced Size)
Original value: 8.8 (Capacity (Nm³ H₂/h))
Sources (2)
- International Conference On Renewable Energy 2018 / Ex Ordo
International Conference On Renewable Energy 2018 / Ex Ordo
Original value: Location
- The COSIN project: synthetic natural gas production from biogas in a waste water treatment plant in Barcelona
International Conference On Renewable Energy 2018 / Ex Ordo
Original value: Location
Projects in Spain
Major projects: operating and FID first, then by recorded capacity.
- Moeve La Rábida Energy Park (Huelva) - phase 1 - Andalusian Green Hydrogen Valley ONUBA I Project (Together with THARSIS: LUXIA project)Under construction300 MW
- La Robla GreenFID / Construction200 MW
- Repsol Bilbao refineryFID100 MW
- Repsol Cartagena, phase 1FID / Construction100 MW
- BP Castellon refinery, phase 1FID / Construction25 MW