H2Prism
Hydrogen calculators & data

ArcelorMittal Hamburg

Germany

Overview

StatusDormantInternational Energy Agency · as of 2026
Country · regionGermanyInternational Energy Agency · as of 2026
TechnologyOther ElectrolysisInternational Energy Agency · as of 2026
ProductH2International Energy Agency · as of 2026
Capacity50 MW

Capacity values retain their recorded units and scope. MW, kt H₂/y and Nm³ H₂/h are different measures; this page does not convert or add them without a shared operating basis. “Other Electrolysis” and “Unknown PtX” are recorded classifications, not a specific electrolyzer design or power-to-X route.

Details

Technology & product

Configuration DetailUnknown PtXInternational Energy Agency · as of 2026
Final UsePlanned hydrogen supply for iron-ore reduction and steel production

Additional project information

Administrative AreaArcelorMittal HamburgInternational Energy Agency · as of 2026
Capacity (kt H2/y)8.66 kt H2/yInternational Energy Agency · as of 2026
Capacity (Announced Size)50 MWInternational Energy Agency · as of 2026
Capacity (MWel)50 MWelInternational Energy Agency · as of 2026
Capacity (Nm³ H₂/h)11,111 Nm³ H₂/hInternational Energy Agency · as of 2026

Timeline

No recorded project events.

Sources & record history

Sources

Field sources

Shared date, confidence and value status appear once with their source above; a dash in the table refers to that source context.

FieldShown valueOriginal valueSourceDate basisMeaning
NameArcelorMittal Hamburg
View exact valueArcelorMittal Hamburg
IEA Hydrogen Projects dataset——
CountryGermany
View exact valueGermany
IEA Hydrogen Projects dataset——
Configuration DetailUnknown PtX
View exact valueUnknown PtX
IEA Hydrogen Projects dataset——
Final UsePlanned hydrogen supply for iron-ore reduction and steel production
View exact valuePlanned hydrogen supply for iron-ore reduction and steel production
ArcelorMittal to become carbon neutral by 2050—
ProductH2
View exact valueH2
IEA Hydrogen Projects dataset——
TechnologyOther Electrolysis
View exact valueOther Electrolysis
IEA Hydrogen Projects dataset——
Capacity50 MW
View exact value50 MW
ArcelorMittal to become carbon neutral by 2050—
Progress StatusDormant
View exact valueDormant
IEA Hydrogen Projects dataset——
Administrative AreaArcelorMittal Hamburg
View exact valueArcelorMittal Hamburg
IEA Hydrogen Projects dataset——
Capacity (kt H2/y)8.66 kt H2/y
View exact value8.662666666666667 kt H2/y
IEA Hydrogen Projects dataset——
Capacity (Announced Size)50 MW
View exact value50MW
IEA Hydrogen Projects dataset——
Capacity (MWel)50 MWel
View exact value50 MWel
IEA Hydrogen Projects dataset——
Capacity (Nm³ H₂/h)11,111 Nm³ H₂/h
View exact value11111.111111111111 Nm³ H₂/h
IEA Hydrogen Projects dataset——

Record history

2 current sourced values · 5 older values · Record updated

H2Prism separates published values from estimates. Check the linked source before you use a value. · Back to Hydrogen projects

Records are compiled with AI assistance. Original source links are shown when available.