Zaragoza H2V
Overview
StatusIDAE published a final direct-grant resolution for ZARAGOZAH2V on 4 August 2026; grant award only, not confirmation of construction or operation
Country · regionSpainInternational Energy Agency · as of 2026
TechnologyPEMInternational Energy Agency · as of 2026
ProductH2International Energy Agency · as of 2026
Capacity25 MWInternational Energy Agency · as of 2026
Capacity values retain their recorded units and scope. MW, kt H₂/y and Nm³ H₂/h are different measures; this page does not convert or add them without a shared operating basis.
Details
Technology & product
Final UseIndustrial and mobility applications planned for the grant-funded ZARAGOZAH2V project (IDAE final resolution published 4 August 2026, Annex I)
Status & timeline
Date online (tracker field)2028 (meaning under review)International Energy Agency · as of 2026
Additional project information
Administrative AreaZaragozaInternational Energy Agency · as of 2026
Progress StatusFeasibilityInternational Energy Agency · as of 2026
Capacity (kt H2/y)3.75 kt H2/yInternational Energy Agency · as of 2026
Capacity (Announced Size)25 MW, 5x5 MW modularInternational Energy Agency · as of 2026
Capacity (Nm³ H₂/h)4,808 Nm³ H₂/hInternational Energy Agency · as of 2026
Timeline
No recorded project events.
Sources & record history
Sources
- El Periódico de la Energía Accionaplug construirá un proyecto de hidrógeno verde en Zaragoza con un electrolizador de 25 MW
- International Energy Agency IEA Hydrogen Projects dataset Shared by 10 fields: Snapshot 2026-06-18 · Confidence: reported · Older value (2026)
- IDAE Resolución Definitiva proyecto ZARAGOZAH2V Shared by 2 fields: Current
Field sources
Shared date, confidence and value status appear once with their source above; a dash in the table refers to that source context.
| Field | Shown value | Original value | Source | Date basis | Meaning |
|---|---|---|---|---|---|
| Name | Zaragoza H2V | View exact valueZaragoza H2V | Accionaplug construirá un proyecto de hidrógeno verde en Zaragoza con un electrolizador de 25 MW | Current | |
| Country | Spain | View exact valueSpain | IEA Hydrogen Projects dataset | — | — |
| Final Use | Industrial and mobility applications planned for the grant-funded ZARAGOZAH2V project (IDAE final resolution published 4 August 2026, Annex I) | View exact valueIndustrial and mobility applications planned for the grant-funded ZARAGOZAH2V project (IDAE final resolution published 4 August 2026, Annex I) | Resolución Definitiva proyecto ZARAGOZAH2V | — | |
| Product | H2 | View exact valueH2 | IEA Hydrogen Projects dataset | — | — |
| Technology | PEM | View exact valuePEM | IEA Hydrogen Projects dataset | — | — |
| Capacity | 25 MW | View exact value25 MW | IEA Hydrogen Projects dataset | — | — |
| Event | Date online : 2028 | View exact value{"date":"2028","date_precision":"year","event":"Date online","basis":"iea_hydrogen_projects_raw.csv"} | IEA Hydrogen Projects dataset | — | — |
| Progress Status | IDAE published a final direct-grant resolution for ZARAGOZAH2V on 4 August 2026; grant award only, not confirmation of construction or operation | View exact valueIDAE published a final direct-grant resolution for ZARAGOZAH2V on 4 August 2026; grant award only, not confirmation of construction or operation | Resolución Definitiva proyecto ZARAGOZAH2V | — | |
| Administrative Area | Zaragoza | View exact valueZaragoza | IEA Hydrogen Projects dataset | — | — |
| Progress Status | Feasibility | View exact valueFeasibility study | IEA Hydrogen Projects dataset | — | — |
| Capacity (kt H2/y) | 3.75 kt H2/y | View exact value3.7482692307692305 kt H2/y | IEA Hydrogen Projects dataset | — | — |
| Capacity (Announced Size) | 25 MW, 5x5 MW modular | View exact value25MW, 5x5MW modular | IEA Hydrogen Projects dataset | — | — |
| Capacity (Nm³ H₂/h) | 4,808 Nm³ H₂/h | View exact value4807.692307692308 Nm³ H₂/h | IEA Hydrogen Projects dataset | — | — |
Record history
2 current sourced values · 5 older values · Record updated