Teesside Hydrogen CO2 Capture/H2NorthEast Phase 1
Overview
StatusFeasibilityInternational Energy Agency · as of 2026
Country · regionUnited KingdomInternational Energy Agency · as of 2026
TechnologyNG w CCUSInternational Energy Agency · as of 2026
ProductH2International Energy Agency · as of 2026
Capacity values retain their recorded units and scope. MW, kt H₂/y and Nm³ H₂/h are different measures; this page does not convert or add them without a shared operating basis.
Details
Technology & product
Configuration DetailUnknown technologyInternational Energy Agency · as of 2026
Status & timeline
Date online (tracker field)2029 (meaning under review)International Energy Agency · as of 2026
Additional project information
Administrative AreaRandom location in TeesideInternational Energy Agency · as of 2026
Capacity (Announced Size)1 GW - 2.5 Mt CO2/y (phase 1: 355 MW - 0.9 Mt CO2/y)International Energy Agency · as of 2026
Capacity (kt H2/y)88.6 kt H2/yInternational Energy Agency · as of 2026
Capacity (t CO₂ capt/y)900,000 t CO₂ capt/yInternational Energy Agency · as of 2026
Capacity (Nm³ H₂/h)113,680 Nm³ H₂/hInternational Energy Agency · as of 2026
Timeline
No recorded project events.
Sources & record history
Sources
- IEA Hydrogen Projects dataset Shared by 12 fields: Snapshot 2026-06-18 · Confidence: reported · Older value (2026)
Field sources
Shared date, confidence and value status appear once with their source above; a dash in the table refers to that source context.
| Field | Shown value | Original value | Source | Date basis | Meaning |
|---|---|---|---|---|---|
| Name | Teesside Hydrogen CO2 Capture/H2NorthEast Phase 1 | View exact valueTeesside Hydrogen CO2 Capture/H2NorthEast Phase 1 | IEA Hydrogen Projects dataset | — | — |
| Country | United Kingdom | View exact valueUnited Kingdom | IEA Hydrogen Projects dataset | — | — |
| Configuration Detail | Unknown technology | View exact valueUnknown technology | IEA Hydrogen Projects dataset | — | — |
| Product | H2 | View exact valueH2 | IEA Hydrogen Projects dataset | — | — |
| Technology | NG w CCUS | View exact valueNG w CCUS | IEA Hydrogen Projects dataset | — | — |
| Event | Date online : 2029 | View exact value{"date":"2029","date_precision":"year","event":"Date online","basis":"iea_hydrogen_projects_raw.csv"} | IEA Hydrogen Projects dataset | — | — |
| Progress Status | Feasibility | View exact valueFeasibility study | IEA Hydrogen Projects dataset | — | — |
| Administrative Area | Random location in Teeside | View exact valueRandom location in Teeside | IEA Hydrogen Projects dataset | — | — |
| Capacity (Announced Size) | 1 GW - 2.5 Mt CO2/y (phase 1: 355 MW - 0.9 Mt CO2/y) | View exact value1GW - 2.5 Mt CO2/y (phase 1: 355 MW - 0.9 Mt CO2/y) | IEA Hydrogen Projects dataset | — | — |
| Capacity (kt H2/y) | 88.6 kt H2/y | View exact value88.6293 kt H2/y | IEA Hydrogen Projects dataset | — | — |
| Capacity (t CO₂ capt/y) | 900,000 t CO₂ capt/y | View exact value900000 t CO₂ capt/y | IEA Hydrogen Projects dataset | — | — |
| Capacity (Nm³ H₂/h) | 113,680 Nm³ H₂/h | View exact value113679.77528089887 Nm³ H₂/h | IEA Hydrogen Projects dataset | — | — |
Record history
0 current sourced values · 6 older values · Record updated