H2Prism
Hydrogen calculators & data

Teesside Hydrogen CO2 Capture/H2NorthEast Phase 1

United Kingdom

Overview

StatusFeasibilityInternational Energy Agency · as of 2026
Country · regionUnited KingdomInternational Energy Agency · as of 2026
TechnologyNG w CCUSInternational Energy Agency · as of 2026
ProductH2International Energy Agency · as of 2026

Capacity values retain their recorded units and scope. MW, kt H₂/y and Nm³ H₂/h are different measures; this page does not convert or add them without a shared operating basis.

Details

Technology & product

Configuration DetailUnknown technologyInternational Energy Agency · as of 2026

Status & timeline

Date online (tracker field)2029 (meaning under review)International Energy Agency · as of 2026

Additional project information

Administrative AreaRandom location in TeesideInternational Energy Agency · as of 2026
Capacity (Announced Size)1 GW - 2.5 Mt CO2/y (phase 1: 355 MW - 0.9 Mt CO2/y)International Energy Agency · as of 2026
Capacity (kt H2/y)88.6 kt H2/yInternational Energy Agency · as of 2026
Capacity (t CO₂ capt/y)900,000 t CO₂ capt/yInternational Energy Agency · as of 2026
Capacity (Nm³ H₂/h)113,680 Nm³ H₂/hInternational Energy Agency · as of 2026

Timeline

No recorded project events.

Sources & record history

Sources

Field sources

Shared date, confidence and value status appear once with their source above; a dash in the table refers to that source context.

FieldShown valueOriginal valueSourceDate basisMeaning
NameTeesside Hydrogen CO2 Capture/H2NorthEast Phase 1
View exact valueTeesside Hydrogen CO2 Capture/H2NorthEast Phase 1
IEA Hydrogen Projects dataset——
CountryUnited Kingdom
View exact valueUnited Kingdom
IEA Hydrogen Projects dataset——
Configuration DetailUnknown technology
View exact valueUnknown technology
IEA Hydrogen Projects dataset——
ProductH2
View exact valueH2
IEA Hydrogen Projects dataset——
TechnologyNG w CCUS
View exact valueNG w CCUS
IEA Hydrogen Projects dataset——
EventDate online : 2029
View exact value{"date":"2029","date_precision":"year","event":"Date online","basis":"iea_hydrogen_projects_raw.csv"}
IEA Hydrogen Projects dataset——
Progress StatusFeasibility
View exact valueFeasibility study
IEA Hydrogen Projects dataset——
Administrative AreaRandom location in Teeside
View exact valueRandom location in Teeside
IEA Hydrogen Projects dataset——
Capacity (Announced Size)1 GW - 2.5 Mt CO2/y (phase 1: 355 MW - 0.9 Mt CO2/y)
View exact value1GW - 2.5 Mt CO2/y (phase 1: 355 MW - 0.9 Mt CO2/y)
IEA Hydrogen Projects dataset——
Capacity (kt H2/y)88.6 kt H2/y
View exact value88.6293 kt H2/y
IEA Hydrogen Projects dataset——
Capacity (t CO₂ capt/y)900,000 t CO₂ capt/y
View exact value900000 t CO₂ capt/y
IEA Hydrogen Projects dataset——
Capacity (Nm³ H₂/h)113,680 Nm³ H₂/h
View exact value113679.77528089887 Nm³ H₂/h
IEA Hydrogen Projects dataset——

Record history

0 current sourced values · 6 older values · Record updated

H2Prism separates published values from estimates. Check the linked source before you use a value. · Back to Hydrogen projects

Records are compiled with AI assistance. Original source links are shown when available.