H2Prism
Hydrogen calculators & data

Barrow Green Hydrogen - Carlton Power hydrogen hub

United Kingdom · GB-CMA Cumbria

Overview

StatusFID / ConstructionInternational Energy Agency · as of 2026
Country · regionUnited KingdomCarlton Power · as of 2026 · GB-CMA CumbriaCarlton Power · as of 2026
TechnologyProton Exchange Membrane (PEM) electrolysis using Plug GenEco electrolysers (supply agreement announced 2026-05-20).
ProductH2International Energy Agency · as of 2026
Capacity30 MWInternational Energy Agency · as of 2026

Capacity values retain their recorded units and scope. MW, kt H₂/y and Nm³ H₂/h are different measures; this page does not convert or add them without a shared operating basis.

Details

Technology & product

Componentselectrolyzer (PEM)Carlton Power · as of 2026
Configuration DetailContracted supply of six 5 MW Plug GenEco PEM electrolysers for the 30 MW Barrow Green Hydrogen project (announced 2026-05-20).
Project Typehydrogen production facilityCarlton Power · as of 2026

Status & timeline

Date online (tracker field)2028 (meaning under review)International Energy Agency · as of 2026

Location & names

Site NameBarrow-in-FurnessCarlton Power · as of 2026
AliasBarrow Green HydrogenCarlton Power · as of 2026
Official NameBarrow Green Hydrogen ProjectCarlton Power · as of 2026

Additional project information

Administrative AreaBarrow-in-FurnessInternational Energy Agency · as of 2026
CountryUnited KingdomInternational Energy Agency · as of 2026
TechnologyPEMInternational Energy Agency · as of 2026
Capacity (Nm³ H₂/h)5,769 Nm³ H₂/hInternational Energy Agency · as of 2026
Capacity (kt H2/y)4.5 kt H2/yInternational Energy Agency · as of 2026
Capacity (Announced Size)30 MWInternational Energy Agency · as of 2026

Timeline

  1. Final investment decision (FID) : 2026-05-20Carlton Power · as of 2026
  2. Construction start : 2026-05-20Carlton Power · as of 2026
  3. Target start of operation : 2028Carlton Power · as of 2026

Connected companies

A normalized project development role; it does not assert an official title, sole developer status, EPC role, or operator role.

    • Developer (normalized project development lead)
      • Organization-to-Project: Developing the project in partnership with Schroders Greencoat.
      • Source: The Project Publication date unknown · accessed 2026-09-01 Project overview; development paragraph

Sources & record history

Sources

Field sources

Shared date, confidence and value status appear once with their source above; a dash in the table refers to that source context.

FieldShown valueOriginal valueSourceDate basisMeaning
NameBarrow Green Hydrogen - Carlton Power hydrogen hub
View exact valueBarrow Green Hydrogen - Carlton Power hydrogen hub
IEA Hydrogen Projects dataset——
Site NameBarrow-in-Furness
View exact valueBarrow-in-Furness
Carlton Power (https://www.carltonpower.co.uk/news/carlton-power-and-schroders-greencoat-reach-final-investment-decision-on-barrow-green-hydrogen-project); Carlton Power (https://www.carltonpower.co.uk/news/carlton-power-and-schroders-greencoat-reach-final-investment-decision-on-barrow-green-hydrogen-project); H2Prism earlier record (SRC-C-P200); H2Prism earlier record (SRC-C-P200)Source dated 2026-05-20Older value (2026)
Administrative AreaGB-CMA Cumbria
View exact valueGB-CMA Cumbria
Carlton Power (https://www.carltonpower.co.uk/news/carlton-power-and-schroders-greencoat-reach-final-investment-decision-on-barrow-green-hydrogen-project); Carlton Power (https://www.carltonpower.co.uk/news/carlton-power-and-schroders-greencoat-reach-final-investment-decision-on-barrow-green-hydrogen-project); H2Prism earlier record (SRC-C-P200); H2Prism earlier record (SRC-C-P200)Source dated 2026-05-20Older value (2026)
AliasBarrow Green Hydrogen
View exact value[{"kind":"source_label","name":"Barrow Green Hydrogen"}]
Carlton Power (https://www.carltonpower.co.uk/news/carlton-power-and-schroders-greencoat-reach-final-investment-decision-on-barrow-green-hydrogen-project); Carlton Power (https://www.carltonpower.co.uk/news/carlton-power-and-schroders-greencoat-reach-final-investment-decision-on-barrow-green-hydrogen-project); H2Prism earlier record (SRC-C-P200); H2Prism earlier record (SRC-C-P200)Source dated 2026-05-20Older value (2026)
CountryUnited Kingdom
View exact valueGBR
Carlton Power (https://www.carltonpower.co.uk/news/carlton-power-and-schroders-greencoat-reach-final-investment-decision-on-barrow-green-hydrogen-project); Carlton Power (https://www.carltonpower.co.uk/news/carlton-power-and-schroders-greencoat-reach-final-investment-decision-on-barrow-green-hydrogen-project); H2Prism earlier record (SRC-C-P200); H2Prism earlier record (SRC-C-P200)Source dated 2026-05-20Older value (2026)
Official NameBarrow Green Hydrogen Project
View exact value[{"lang":"en","name":"Barrow Green Hydrogen Project","evidence":["E-01"]}]
Carlton Power (https://www.carltonpower.co.uk/news/carlton-power-and-schroders-greencoat-reach-final-investment-decision-on-barrow-green-hydrogen-project); Carlton Power (https://www.carltonpower.co.uk/news/carlton-power-and-schroders-greencoat-reach-final-investment-decision-on-barrow-green-hydrogen-project); H2Prism earlier record (SRC-C-P200); H2Prism earlier record (SRC-C-P200)Source dated 2026-05-20Older value (2026)
Componentselectrolyzer (PEM)
View exact value{"kind":"electrolyzer","tech":"PEM","tech_raw":"GenEco™ Proton Exchange Membrane (PEM) electrolyzers","component_id":"CMP-1"}
Carlton Power (https://www.carltonpower.co.uk/news/carlton-power-and-schroders-greencoat-reach-final-investment-decision-on-barrow-green-hydrogen-project); Carlton Power (https://www.carltonpower.co.uk/news/carlton-power-and-schroders-greencoat-reach-final-investment-decision-on-barrow-green-hydrogen-project); H2Prism earlier record (SRC-C-P200); H2Prism earlier record (SRC-C-P200)Source dated 2026-05-20Older value (2026)
Configuration DetailContracted supply of six 5 MW Plug GenEco PEM electrolysers for the 30 MW Barrow Green Hydrogen project (announced 2026-05-20).
View exact valueContracted supply of six 5 MW Plug GenEco PEM electrolysers for the 30 MW Barrow Green Hydrogen project (announced 2026-05-20).
30 MW Barrow Green Hydrogen Project Achieves Final Investment Decision with Plug Power Electrolyzer Supply——
ProductH2
View exact valueH2
IEA Hydrogen Projects dataset——
Project Typehydrogen production facility
View exact valuehydrogen_production_facility
Carlton Power (https://www.carltonpower.co.uk/news/carlton-power-and-schroders-greencoat-reach-final-investment-decision-on-barrow-green-hydrogen-project); Carlton Power (https://www.carltonpower.co.uk/news/carlton-power-and-schroders-greencoat-reach-final-investment-decision-on-barrow-green-hydrogen-project); H2Prism earlier record (SRC-C-P200); H2Prism earlier record (SRC-C-P200)Source dated 2026-05-20Older value (2026)
TechnologyProton Exchange Membrane (PEM) electrolysis using Plug GenEco electrolysers (supply agreement announced 2026-05-20).
View exact valueProton Exchange Membrane (PEM) electrolysis using Plug GenEco electrolysers (supply agreement announced 2026-05-20).
30 MW Barrow Green Hydrogen Project Achieves Final Investment Decision with Plug Power Electrolyzer Supply——
Capacity30 MW
View exact value30 MW
IEA Hydrogen Projects dataset——
EventFinal investment decision (FID) : 2026-05-20
View exact value{"date":"2026-05-20","tags":{"as_of":"2026-05-20","source":"Carlton Power","evidence":["E-01"],"judged_by":"worker_review","confidence":"high","accessed_at":"2026-08-18T00:00:00Z"},"ev_type":"EV-05","event_id":"V-01","raw_date_text":"Carlton Power, the UK independent energy infrastructure development company and Schroders Greencoat, the specialist renewables and energy transition infrastructure manager of Schroders Capital, today announce that they have reached Final Investment Decision (FID) on the 30MW Barrow Green Hydrogen Project in Cumbria.","date_precision":"day"}
Carlton Power (https://www.carltonpower.co.uk/news/carlton-power-and-schroders-greencoat-reach-final-investment-decision-on-barrow-green-hydrogen-project); H2Prism earlier record (SRC-C-P200); H2Prism earlier record (SRC-C-P200)Source dated 2026-05-20Older value (2026)
EventConstruction start : 2026-05-20
View exact value{"date":"2026-05-20","tags":{"as_of":"2026-05-20","source":"Carlton Power","evidence":["E-05"],"judged_by":"worker_review","confidence":"high","accessed_at":"2026-08-18T00:00:00Z"},"ev_type":"EV-10","event_id":"V-02","raw_date_text":"Barrow, as the first project to reach FID and enter construction within the GHECO platform, marks a significant step in the continued growth of Schroders Greencoat’s broader energy transition capability which spans hydrogen, grid infrastructure, battery storage, district heating and electric vehicle charging.","date_precision":"day"}
Carlton Power (https://www.carltonpower.co.uk/news/carlton-power-and-schroders-greencoat-reach-final-investment-decision-on-barrow-green-hydrogen-project); H2Prism earlier record (SRC-C-P200); H2Prism earlier record (SRC-C-P200)Source dated 2026-05-20Older value (2026)
EventTarget start of operation : 2028
View exact value{"date":"2028","tags":{"as_of":"2026-05-20","source":"Carlton Power","evidence":["E-06"],"judged_by":"transcription","confidence":"high","accessed_at":"2026-08-18T00:00:00Z"},"ev_type":"EV-14","event_id":"V-03","raw_date_text":"This development, set to enter commercial operation in 2028, aims to support the Government’s low-carbon hydrogen production programme, part of the UK’s clean energy mission, and represents a meaningful step in mobilising private capital at scale behind the UK’s hydrogen ambitions.","date_precision":"year"}
Carlton Power (https://www.carltonpower.co.uk/news/carlton-power-and-schroders-greencoat-reach-final-investment-decision-on-barrow-green-hydrogen-project); H2Prism earlier record (SRC-C-P200); H2Prism earlier record (SRC-C-P200)Source dated 2026-05-20Older value (2026)
EventDate online : 2028
View exact value{"date":"2028","date_precision":"year","event":"Date online","basis":"iea_hydrogen_projects_raw.csv"}
IEA Hydrogen Projects dataset——
Progress StatusFID / Construction
View exact valueFID/Construction
IEA Hydrogen Projects dataset——
Administrative AreaBarrow-in-Furness
View exact valueBarrow-in-Furness
IEA Hydrogen Projects dataset——
CountryUnited Kingdom
View exact valueUnited Kingdom
IEA Hydrogen Projects dataset——
TechnologyPEM
View exact valuePEM
IEA Hydrogen Projects dataset——
Capacity (Nm³ H₂/h)5,769 Nm³ H₂/h
View exact value5769.2307692307695 Nm³ H₂/h
IEA Hydrogen Projects dataset——
Capacity (kt H2/y)4.5 kt H2/y
View exact value4.497923076923077 kt H2/y
IEA Hydrogen Projects dataset——
Capacity (Announced Size)30 MW
View exact value30 MW
IEA Hydrogen Projects dataset——

Record history

2 current sourced values · 14 older values · Record updated

H2Prism separates published values from estimates. Check the linked source before you use a value. · Back to Hydrogen projects

Records are compiled with AI assistance. Original source links are shown when available.