H2Prism
Hydrogen calculators & data

HyMarnham

United Kingdom

Overview

StatusOperationalH2Prism earlier record
Country · regionUnited KingdomHyMarnham Power
TechnologyOther ElectrolysisInternational Energy Agency · as of 2026
ProductH2International Energy Agency · as of 2026
Capacity15 MWInternational Energy Agency · as of 2026

Capacity values retain their recorded units and scope. MW, kt H₂/y and Nm³ H₂/h are different measures; this page does not convert or add them without a shared operating basis. “Other Electrolysis” and “Unknown PtX” are recorded classifications, not a specific electrolyzer design or power-to-X route.

Details

Technology & product

Componentselectrolyser (ALK)HyMarnham Power
Configuration DetailUnknown PtXInternational Energy Agency · as of 2026
Power SourceElectricity from a range of local sources, including a nearby biomass CHP plant (July 2025 announcement)
Project Typehydrogen production facilityHyMarnham Power

Capacity & economics

Total Capex50 million GBP project costHyMarnham Power

Status & timeline

EventAs of the 23 July 2025 announcement, GeoPura reported HyMarnham Power was already producing hydrogen while electrolyser commissioning was underway
Date online (tracker field)2026 (meaning under review)International Energy Agency · as of 2026

Location & names

Site Nameformer High Marnham coal-fired power station siteHyMarnham Power
AliasHyMarnhamHyMarnham Power
Official NameHyMarnham PowerHyMarnham Power

Additional project information

Administrative AreaNewarkInternational Energy Agency · as of 2026
CountryUnited KingdomInternational Energy Agency · as of 2026
Progress StatusFID / ConstructionInternational Energy Agency · as of 2026
Capacity (Announced Size)15 MWInternational Energy Agency · as of 2026
Capacity (kt H2/y)2.6 kt H2/yInternational Energy Agency · as of 2026
Capacity (Nm³ H₂/h)3,333 Nm³ H₂/hInternational Energy Agency · as of 2026

Timeline

  1. Construction start : 2024-09HyMarnham Power
  2. Commercial operation : 2026-04Department for Energy Security and Net Zero

Sources & record history

Sources

Field sources

Shared date, confidence and value status appear once with their source above; a dash in the table refers to that source context.

FieldShown valueOriginal valueSourceDate basisMeaning
NameHyMarnham
View exact valueHyMarnham
IEA Hydrogen Projects dataset——
Site Nameformer High Marnham coal-fired power station site
View exact valueformer High Marnham coal-fired power station site
HyMarnham Power (https://hymarnhampower.com/about-us/); HyMarnham Power (https://hymarnhampower.com/about-us/); H2Prism earlier record (SRC-C-P200); H2Prism earlier record (SRC-C-P200)Older value
AliasHyMarnham
View exact value[{"kind":"source_label","name":"HyMarnham"}]
HyMarnham Power (https://hymarnhampower.com/about-us/); HyMarnham Power (https://hymarnhampower.com/about-us/); H2Prism earlier record (SRC-C-P200); H2Prism earlier record (SRC-C-P200)Older value
CountryUnited Kingdom
View exact valueGBR
HyMarnham Power (https://hymarnhampower.com/about-us/); HyMarnham Power (https://hymarnhampower.com/about-us/); H2Prism earlier record (SRC-C-P200); H2Prism earlier record (SRC-C-P200)Older value
Official NameHyMarnham Power
View exact value[{"lang":"en","name":"HyMarnham Power","evidence":["E-01"]}]
HyMarnham Power (https://hymarnhampower.com/about-us/); HyMarnham Power (https://hymarnhampower.com/about-us/); H2Prism earlier record (SRC-C-P200); H2Prism earlier record (SRC-C-P200)Older value
Componentselectrolyser (ALK)
View exact value{"kind":"electrolyser","tech":"ALK","tech_raw":"production of hydrogen gas by alkaline electrolysis of water","component_id":"CMP-1"}
HyMarnham Power (https://hymarnhampower.com/about-us/); HyMarnham Power (https://hymarnhampower.com/about-us/); H2Prism earlier record (SRC-C-P200); H2Prism earlier record (SRC-C-P200)Older value
Configuration DetailUnknown PtX
View exact valueUnknown PtX
IEA Hydrogen Projects dataset——
Power SourceElectricity from a range of local sources, including a nearby biomass CHP plant (July 2025 announcement)
View exact valueElectricity from a range of local sources, including a nearby biomass CHP plant (July 2025 announcement)
GeoPura and JG Pears Reach Major Infrastructure Milestone at HyMarnham Power Project—
ProductH2
View exact valueH2
IEA Hydrogen Projects dataset——
Project Typehydrogen production facility
View exact valuehydrogen_production_facility
HyMarnham Power (https://hymarnhampower.com/about-us/); HyMarnham Power (https://hymarnhampower.com/about-us/); H2Prism earlier record (SRC-C-P200); H2Prism earlier record (SRC-C-P200)Older value
TechnologyOther Electrolysis
View exact valueOther Electrolysis
IEA Hydrogen Projects dataset——
Capacity15 MW
View exact value15 MW
IEA Hydrogen Projects dataset——
Total Capex50 million GBP project cost
View exact value{"unit":"million GBP","number":50,"of_what":"project cost","raw_text":"Our £50 million project"}
HyMarnham Power (https://hymarnhampower.com/about-us/); H2Prism earlier record (SRC-C-P200); H2Prism earlier record (SRC-C-P200)Older value
EventConstruction start : 2024-09
View exact value{"date":"2024-09","tags":{"as_of":"2024-09","source":"HyMarnham Power","evidence":["E-04"],"judged_by":"transcription","confidence":"high","accessed_at":"2026-08-18T03:00:00Z"},"ev_type":"EV-10","event_id":"V-01","raw_date_text":"September 2024 ... Construction to transform the brownfield site into a clean energy hub","date_precision":"month"}
HyMarnham Power (https://hymarnhampower.com/about-us/); H2Prism earlier record (SRC-C-P200); H2Prism earlier record (SRC-C-P200)Older value
EventCommercial operation : 2026-04
View exact value{"date":"2026-04","tags":{"as_of":"2026-04","source":"Department for Energy Security and Net Zero","evidence":["E-05"],"judged_by":"transcription","confidence":"high","accessed_at":"2026-08-18T03:00:00Z"},"ev_type":"EV-13","event_id":"V-02","raw_date_text":"HyMarnham Power, beginning commercial operations in April 2026","date_precision":"month"}
Department for Energy Security and Net Zero (https://assets.publishing.service.gov.uk/media/6a16b44e29bb11891b1cf18a/flexibility-in-electrolytic-hydrogen-call-for-evidence.pdf); H2Prism earlier record (SRC-C-P200); H2Prism earlier record (SRC-C-P200)Older value
EventAs of the 23 July 2025 announcement, GeoPura reported HyMarnham Power was already producing hydrogen while electrolyser commissioning was underway
View exact valueAs of the 23 July 2025 announcement, GeoPura reported HyMarnham Power was already producing hydrogen while electrolyser commissioning was underway
GeoPura and JG Pears Reach Major Infrastructure Milestone at HyMarnham Power Project—
EventDate online : 2026
View exact value{"date":"2026","date_precision":"year","event":"Date online","basis":"iea_hydrogen_projects_raw.csv"}
IEA Hydrogen Projects dataset——
Progress StatusOperational
View exact valueOperational
H2Prism earlier record (SRC-S3); H2Prism earlier record (SRC-S3)Older value
Administrative AreaNewark
View exact valueNewark
IEA Hydrogen Projects dataset——
CountryUnited Kingdom
View exact valueUnited Kingdom
IEA Hydrogen Projects dataset——
Progress StatusFID / Construction
View exact valueFID/Construction
IEA Hydrogen Projects dataset——
Capacity (Announced Size)15 MW
View exact value15MW
IEA Hydrogen Projects dataset——
Capacity (kt H2/y)2.6 kt H2/y
View exact value2.5988 kt H2/y
IEA Hydrogen Projects dataset——
Capacity (Nm³ H₂/h)3,333 Nm³ H₂/h
View exact value3333.3333333333335 Nm³ H₂/h
IEA Hydrogen Projects dataset——

Record history

2 current sourced values · 15 older values · Record updated

H2Prism separates published values from estimates. Check the linked source before you use a value. · Back to Hydrogen projects

Records are compiled with AI assistance. Original source links are shown when available.