H2Prism
Hydrogen calculators & data

rabh2

UK

Overview

Statusplan to conduct a feasibility study leading to installation of an electrolyser at a BOC UK facility
Country · regionUK
TechnologyALKInternational Energy Agency · as of 2026
ProductH2International Energy Agency · as of 2026
Capacity0.005 MWInternational Energy Agency · as of 2026

Capacity values retain their recorded units and scope. MW, kt H₂/y and Nm³ H₂/h are different measures; this page does not convert or add them without a shared operating basis.

Details

Status & timeline

Lifecycle Stagefeasibility study leading to installation
Date online (tracker field)2011 (meaning under review)International Energy Agency · as of 2026

Additional project information

CountryUnited KingdomInternational Energy Agency · as of 2026
Progress StatusDemoInternational Energy Agency · as of 2026
Capacity (Announced Size)0.005 MWInternational Energy Agency · as of 2026
Capacity (Nm³ H₂/h)1.09 Nm³ H₂/hInternational Energy Agency · as of 2026
Capacity (kt H2/y)0.001 kt H2/yInternational Energy Agency · as of 2026

Timeline

No recorded project events.

Sources & record history

Sources

Field sources

Shared date, confidence and value status appear once with their source above; a dash in the table refers to that source context.

FieldShown valueOriginal valueSourceDate basisMeaning
Namerabh2
View exact valuerabh2
Green schemes: Hydrogen supply chain scheme launched in UK—
CountryUK
View exact valueUK
Green schemes: Hydrogen supply chain scheme launched in UK—
ProductH2
View exact valueH2
IEA Hydrogen Projects dataset——
TechnologyALK
View exact valueALK
IEA Hydrogen Projects dataset——
Capacity0.005 MW
View exact value0.005 MW
IEA Hydrogen Projects dataset——
EventDate online : 2011
View exact value{"date":"2011","date_precision":"year","event":"Date online","basis":"iea_hydrogen_projects_raw.csv"}
IEA Hydrogen Projects dataset——
Lifecycle Stagefeasibility study leading to installation
View exact valuefeasibility study leading to installation
Green schemes: Hydrogen supply chain scheme launched in UK—
Progress Statusplan to conduct a feasibility study leading to installation of an electrolyser at a BOC UK facility
View exact valueplan to conduct a feasibility study leading to installation of an electrolyser at a BOC UK facility
Green schemes: Hydrogen supply chain scheme launched in UK—
CountryUnited Kingdom
View exact valueUnited Kingdom
IEA Hydrogen Projects dataset——
Progress StatusDemo
View exact valueDEMO
IEA Hydrogen Projects dataset——
Capacity (Announced Size)0.005 MW
View exact value0.005MW
IEA Hydrogen Projects dataset——
Capacity (Nm³ H₂/h)1.09 Nm³ H₂/h
View exact value1.0869565217391304 Nm³ H₂/h
IEA Hydrogen Projects dataset——
Capacity (kt H2/y)0.001 kt H2/y
View exact value0.0008474347826086956 kt H2/y
IEA Hydrogen Projects dataset——

Record history

3 current sourced values · 4 older values · Record updated

H2Prism separates published values from estimates. Check the linked source before you use a value. · Back to Hydrogen projects

Records are compiled with AI assistance. Original source links are shown when available.