H2PrismHydrogen intelligenceSubscribe

MicrobEnergy GmbH, Schwandorf

0.18 MW · PEM · Germany

Operational

Germany Map: Natural Earth
Capacity
0.18 MW
Target operation
—
Technology
PEM
Country
Germany
Development stage
Operational

Also known as Biological methanation demonstration plant

Country scale

#194 by recorded MW among 219 projects with capacity recorded in this country.

  1. AquaVentus (completion)9,972 MW
  2. Wasserstoffpark Lingen1,500 MW
  3. MicrobEnergy GmbH, Schwandorf0.18 MW

All stages are included. Capacity does not describe current production.

Project details

Product
Synthetic methane
Scale
Demonstration
Function
Production
Operation start
2013
Process description
a methanation unit (BiON technology, MicrobEnergy GmbH) The first demonstration plant worldwide using the power to gas combination of electrolysis and biological methanation
Sources (7)
  • IEA Hydrogen Production Projects 2026 (preserved CSV edition, received 2026-10-24)

    International Energy Agency · As of 2026-06-18

    Original value: PEM electrolyser (Technology: PEM electrolyser)

    Original value: Synthetic methane (Product: Synthetic methane)

    Original value: Gas grid injection (End use: Gas grid injection · Product: Synthetic methane)

    Original value: Operational

    Original value: 0.18 MW

  • IEA Hydrogen Production Projects 2026

    International Energy Agency

    Original value: 0.18 MW (Announced Size)

    Original value: 34.61538461538461 (Capacity (Nm³ H₂/h))

    Original value: 0.02698753846153846 (Capacity (kt H2/y))

    Original value: PEM electrolyser (Technology: PEM electrolyser)

    Original value: Operational

    Original value: 2013

  • CS1810: BIOLOGICAL METHANATION DEMONSTRATION PLANT

    IEA Bioenergy Task 37

    Original value: biological methanation

    Original value: Schwandorf wastewater treatment plant (sewage works) (Site: Schwandorf wastewater treatment plant (sewage works))

    Original value: Gas grid injection (End use: Gas grid injection · Product: Methane)

    Original value: a methanation unit (BiON technology, MicrobEnergy GmbH) The first demonstration plant worldwide using the power to gas combination of electrolysis and biological methanation (Process section: power-to-gas)

  • International Energy Agency

    International Energy Agency

    Original value: 34.61538461538461 (Capacity (Nm³ H₂/h))

    Original value: 0.02698753846153846 (Capacity (kt H2/y))

    Original value: PEM electrolyser (Technology: PEM electrolyser)

    Original value: 2013

  • IEA Bioenergy Task 37

    IEA Bioenergy Task 37

    Original value: Schwandorf wastewater treatment plant (sewage works) (Site: Schwandorf wastewater treatment plant (sewage works))

    Original value: Gas grid injection (End use: Gas grid injection · Product: Methane)

    Original value: a methanation unit (BiON technology, MicrobEnergy GmbH) The first demonstration plant worldwide using the power to gas combination of electrolysis and biological methanation (Process section: power-to-gas)

  • Viessmann Group

    Viessmann Group

    Original value: Bavaria (Bayern) (Site: Bavaria (Bayern))

    Original value: Demonstration

    Original value: Production (Function: Production)

  • Power-to-gas plant put into operation

    Viessmann Group

    Original value: Bavaria (Bayern) (Site: Bavaria (Bayern))

    Original value: Demonstration

    Original value: Production (Function: Production)

Projects in Germany

Major projects: operating and FID first, then by recorded capacity.

All projects in this country