H21 Leeds City Gate - Teesside hydrogen
Overview
StatusFeasibilityInternational Energy Agency · as of 2026
Country · regionUnited Kingdom
TechnologyNG w CCUSInternational Energy Agency · as of 2026
ProductH2International Energy Agency · as of 2026
Capacity values retain their recorded units and scope. MW, kt H₂/y and Nm³ H₂/h are different measures; this page does not convert or add them without a shared operating basis.
Details
Technology & product
Configuration DetailATR+CCUSInternational Energy Agency · as of 2026
Status & timeline
Lifecycle StageCompleted
Date online (tracker field)2035 (meaning under review)International Energy Agency · as of 2026
Additional project information
Administrative AreaTeessideInternational Energy Agency · as of 2026
CountryUnited KingdomInternational Energy Agency · as of 2026
Capacity (Announced Size)1 GW H2 - 1.5Mt CO2/yInternational Energy Agency · as of 2026
Capacity (t CO₂ capt/y)15,000,000 t CO₂ capt/yInternational Energy Agency · as of 2026
Capacity (Nm³ H₂/h)3,890,730 Nm³ H₂/hInternational Energy Agency · as of 2026
Capacity (kt H2/y)3,033 kt H2/yInternational Energy Agency · as of 2026
Timeline
No recorded project events.
Sources & record history
Sources
- Energy Networks Association Innovation Portal H21 Leeds Citygate Shared by 2 fields: Current
- Northern Gas Networks H21 Leeds City Gate Executive Summary
- International Energy Agency IEA Hydrogen Projects dataset Shared by 11 fields: Snapshot 2026-06-18 · Confidence: reported · Older value (2026)
Field sources
Shared date, confidence and value status appear once with their source above; a dash in the table refers to that source context.
| Field | Shown value | Original value | Source | Date basis | Meaning |
|---|---|---|---|---|---|
| Name | H21 Leeds City Gate - Teesside hydrogen | View exact valueH21 Leeds City Gate - Teesside hydrogen | H21 Leeds Citygate | — | |
| Country | United Kingdom | View exact valueGBR | H21 Leeds City Gate Executive Summary | Current | |
| Configuration Detail | ATR+CCUS | View exact valueATR+CCUS | IEA Hydrogen Projects dataset | — | — |
| Product | H2 | View exact valueH2 | IEA Hydrogen Projects dataset | — | — |
| Technology | NG w CCUS | View exact valueNG w CCUS | IEA Hydrogen Projects dataset | — | — |
| Event | Date online : 2035 | View exact value{"date":"2035","date_precision":"year","event":"Date online","basis":"iea_hydrogen_projects_raw.csv"} | IEA Hydrogen Projects dataset | — | — |
| Lifecycle Stage | Completed | View exact valueCompleted | H21 Leeds Citygate | — | |
| Progress Status | Feasibility | View exact valueFeasibility study | IEA Hydrogen Projects dataset | — | — |
| Administrative Area | Teesside | View exact valueTeesside | IEA Hydrogen Projects dataset | — | — |
| Country | United Kingdom | View exact valueUnited Kingdom | IEA Hydrogen Projects dataset | — | — |
| Capacity (Announced Size) | 1 GW H2 - 1.5Mt CO2/y | View exact value1GW H2 - 1.5Mt CO2/y | IEA Hydrogen Projects dataset | — | — |
| Capacity (t CO₂ capt/y) | 15,000,000 t CO₂ capt/y | View exact value15000000 t CO₂ capt/y | IEA Hydrogen Projects dataset | — | — |
| Capacity (Nm³ H₂/h) | 3,890,730 Nm³ H₂/h | View exact value3890730.337078652 Nm³ H₂/h | IEA Hydrogen Projects dataset | — | — |
| Capacity (kt H2/y) | 3,033 kt H2/y | View exact value3033.369 kt H2/y | IEA Hydrogen Projects dataset | — | — |
Record history
2 current sourced values · 5 older values · Record updated