IPCEI Blue Danube - first project

20 MW · Electrolysis · Germany

Feasibility

Germany Map: Natural Earth
Capacity
20 MW
Target operation
—
Technology
Electrolysis
Country
Germany
Development stage
Feasibility

Country scale

#86 by recorded MW among 219 projects with capacity recorded in this country.

  1. AquaVentus (completion)9,972 MW
  2. Wasserstoffpark Lingen1,500 MW
  3. IPCEI Blue Danube - first project20 MW

All stages are included. Capacity does not describe current production.

Project details

Product
Hydrogen
Production capacity
3.47 ktpa
Sources (7)
  • IPCEI Hydrogen Observatory

    IPCEI Hydrogen Observatory

    Original value: construction planned by 2028; commissioning stated by 2028

  • Hydrogenious - Green Hydrogen @ Blue Danube (DE59)

    IPCEI Hydrogen Observatory

    Original value: construction planned by 2028; commissioning stated by 2028

  • IEA Hydrogen Production Projects 2026 (preserved CSV edition, received 2026-10-24)

    International Energy Agency · As of 2026-06-18

    Original value: Hydrogen (Product: Hydrogen)

    Original value: 20 MW

    Original value: Feasibility

    Original value: 3.4650666666666665 kt H2/y (Product: Hydrogen)

    Published value: 3.465 kt H2/y

  • Hydrogenious LOHC Technologies GmbH

    Hydrogenious LOHC Technologies GmbH

    Original value: The FEED phase is planned to be completed in the second half of 2026 which will represent an important milestone to reach FID (Final Investment Decision) of the “Green Hydrogen @ Blue Danube” project. Following a positive FID, the construction phase will begin on site.

    Original value: Main scope of the project is the construction of an LOHC hub in southern Bavaria by 2028

    Original value: FEED phase planned for completion in the second half of 2026; construction follows a positive FID

  • IPCEI: Hydrogenious LOHC receives multi-million grant for Green Hydrogen @ Blue Danube

    Hydrogenious LOHC Technologies GmbH

    Original value: The FEED phase is planned to be completed in the second half of 2026 which will represent an important milestone to reach FID (Final Investment Decision) of the “Green Hydrogen @ Blue Danube” project. Following a positive FID, the construction phase will begin on site.

    Original value: FEED phase planned for completion in the second half of 2026; construction follows a positive FID

    Original value: Main scope of the project is the construction of an LOHC hub in southern Bavaria by 2028

  • IEA Hydrogen Production Projects 2026

    International Energy Agency

    Original value: Hydrogen (Product: Hydrogen)

    Original value: Water electrolysis (Technology: Water electrolysis)

    Original value: 20MW (Announced Size)

    Original value: 20 MWel

    Original value: 4444.444444444444 (Capacity (Nm³ H₂/h))

  • International Energy Agency

    International Energy Agency

    Original value: Hydrogen (Product: Hydrogen)

    Original value: Water electrolysis (Technology: Water electrolysis)

    Original value: 4444.444444444444 (Capacity (Nm³ H₂/h))

Projects in Germany

Major projects: operating and FID first, then by recorded capacity.

All projects in this country