Fronius house of the future / Fronius-Energiezelle, energieautonomes Einfamilien-Wohnhaus
0.01 MW · PEM · Austria
- Capacity
- 0.01 MW
- Target operation
- —
- Technology
- PEM electrolyser
- Country
- Austria
- Development stage
- —
Also known as Fronius Energy Cell, self-sufficient house
Country scale
#34 by recorded MW among 34 projects with capacity recorded in this country.
- PanHy, phase 2240 MW
- Energie Steiermark plant in Styrua, expansion149 MW
- Fronius house of the future / Fronius-Energiezelle, energieautonomes Einfamilien-Wohnhaus0.01 MW
All stages are included. Capacity does not describe current production.
Project details
- Production pathway
- Electrolysis
- Process description
- The final version will fulfil two roles - performing electrolysis and the function of the fuel cell.
- Announced size
- 1.7 Nm3 H2/h
Sources (12)
- IEA Hydrogen Production Projects 2026 (preserved CSV edition, received 2026-10-24)
International Energy Agency · As of 2026-06-18
Original value: Heat (End use: Heat · Product: Hydrogen)
Original value: Power generation (End use: Power generation · Product: Hydrogen)
- IEA Hydrogen Production Projects 2026
International Energy Agency
Original value: Capacity (kt H2/y): 0.0013253879999999998 (Capacity (kt H2/y))
Original value: 2012 (Schedule question: Date online)
Original value: 1.7 Nm3 H2/h
Original value: Hydrogen (Product: Hydrogen)
Original value: DEMO
Original value: Capacity (MWel): 0.008839999999999999
Original value: PEM electrolyser (Technology: PEM electrolyser)
Original value: Capacity (Nm³ H₂/h): 1.7 (Capacity (Nm³ H₂/h))
- CEG / MRS
CEG / MRS
Original value: Electrolysis (Pathway: Electrolysis)
Original value: The final version will fulfil two roles - performing electrolysis and the function of the fuel cell. (Process section: fuel cell)
- Energy Cells
CEG / MRS
Original value: Electrolysis (Pathway: Electrolysis)
Original value: The final version will fulfil two roles - performing electrolysis and the function of the fuel cell. (Process section: fuel cell)
Original value: electricity for consumers when solar power is unavailable
- International Energy Agency
International Energy Agency
Original value: 1.7 Nm3 H2/h
Original value: Hydrogen (Product: Hydrogen)
Original value: DEMO
Original value: PEM electrolyser (Technology: PEM electrolyser)
- pv magazine International
pv magazine International
Original value: about the pilot project soon to be commissioned at a Fronius site
Original value: planned / soon to be commissioned (historical 2012 reporting)
Original value: pilot project / model installation
- Fronius is ready for the future
pv magazine International
Original value: about the pilot project soon to be commissioned at a Fronius site
Original value: planned / soon to be commissioned (historical 2012 reporting)
Original value: pilot project / model installation
- Alternative Energy Magazine
Alternative Energy Magazine
Original value: will be commissioned shortly
- Intersolar 2012 - Fronius sets new milestone in the solar market
Alternative Energy Magazine
Original value: will be commissioned shortly
- IEA Hydrogen Production Projects 2026
International Energy Agency · As of 2026-06-18
Original value: 0.008839999999999999 MW
Published value: 0.008840 MW
- IKZ
IKZ
Original value: Research or pilot
- The "Energy-Autonomous Single-Family House" of the future
IKZ
Original value: Research or pilot
Sources (2)
- IEA Hydrogen Production Projects Database
International Energy Agency
Original value: Location
- International Energy Agency
International Energy Agency
Original value: Location
Projects in Austria
Major projects: operating and FID first, then by recorded capacity.