H2PrismHydrogen intelligenceSubscribe

Porto, CUTE

0.3 MW · Alkaline · Portugal

Decommissioned

Portugal Map: Natural Earth
Capacity
0.3 MW
Target operation
—
Technology
Alkaline electrolyser
Country
Portugal
Development stage
Decommissioned

Country scale

#37 by recorded MW among 38 projects with capacity recorded in this country.

  1. Iberdrola - H2 Green Steel800 MW
  2. MadoquaPower2X - Sines - phase 2700 MW
  3. Porto, CUTE0.3 MW

All stages are included. Capacity does not describe current production.

Project details

Process description
demonstrate fuel cell buses and their hydrogen supply infrastructures
Function
Consumption
Scale
Demonstration
Site
Porto
Sources (13)
  • Clean Urban Transport for Europe (CUTE) - Hydrogen and Fuel Cell Buses

    IEA

    Original value: public transport

    Original value: Decommissioned

    Original value: operation finished in December 2005

    Original value: Porto (Site: Porto)

  • International Journal of Hydrogen Energy / Elsevier

    International Journal of Hydrogen Energy / Elsevier

    Original value: demonstrate fuel cell buses and their hydrogen supply infrastructures (Process section: fuel cell buses with hydrogen supply infrastructure)

    Original value: Consumption (Function: Consumption)

  • Lessons learned from infrastructure operation in the CUTE project

    International Journal of Hydrogen Energy / Elsevier

    Original value: demonstrate fuel cell buses and their hydrogen supply infrastructures (Process section: fuel cell buses with hydrogen supply infrastructure)

    Original value: Consumption (Function: Consumption)

  • International Energy Agency

    International Energy Agency

    Original value: Alkaline electrolyser (Technology: Alkaline electrolyser)

    Original value: DEMO

  • IEA Hydrogen Production Projects 2026

    International Energy Agency

    Original value: Alkaline electrolyser (Technology: Alkaline electrolyser)

    Original value: Capacity (MWel): 0.3

    Original value: Capacity (kt H2/y): 0.050846086956521735 (Capacity (kt H2/y))

    Original value: 2003 (Schedule question: Date online)

    Original value: DEMO

    Original value: Capacity (Nm³ H₂/h): 65.21739130434783 (Capacity (Nm³ H₂/h))

    Original value: 0.3MW - 60 Nm3 H2/h (Announced Size)

  • STCP abandons hydrogen project due to "poor results"

    Ambiente Online

    Original value: closed

    Original value: a experiência-piloto, que decorreu entre 2001 e 2006

    English rendering: the pilot experiment, which ran between 2001 and 2006

  • CUTE Hydrogen Bus Project: Findings and Extension to Hyfleet

    Transportation Research Board TRID

    Original value: The CUTE project was officially closed on March 2006

  • Transportation Research Board TRID

    Transportation Research Board TRID

    Original value: The CUTE project was officially closed on March 2006

  • Ambiente Online

    Ambiente Online

    Original value: closed

    Original value: a experiência-piloto, que decorreu entre 2001 e 2006

    English rendering: the pilot experiment, which ran between 2001 and 2006

  • IEA Hydrogen Production Projects 2026

    International Energy Agency · As of 2026-06-18

    Original value: 0.3 MW

  • IEA

    IEA

    Original value: Decommissioned

    Original value: operation finished in December 2005

    Original value: Porto (Site: Porto)

  • CUTE Hydrogen Bus Project: Findings and Extension to Hyfleet

    TRID / Transportation Research Board

    Original value: Hydrogen (Product: Hydrogen)

  • IEA Hydrogen Production Projects 2026 (preserved CSV edition, received 2026-10-24)

    International Energy Agency · As of 2026-06-18

    Original value: Mobility (Product: Hydrogen)

    Original value: Demonstration

Projects in Portugal

Major projects: operating and FID first, then by recorded capacity.

All projects in this country