H2Prism
Hydrogen calculators & data

Iberdrola - H2 Green Steel

Portugal

Overview

StatusCancelledInternational Energy Agency · as of 2026
Country · regionPortugalInternational Energy Agency · as of 2026
TechnologyOther ElectrolysisInternational Energy Agency · as of 2026Other hydrogen productionIberdrola
ProductH2International Energy Agency · as of 2026HydrogenIberdrola
Capacity1,000 MWIberdrola

Capacity values retain their recorded units and scope. MW, kt H₂/y and Nm³ H₂/h are different measures; this page does not convert or add them without a shared operating basis. “Other Electrolysis” and “Unknown PtX” are recorded classifications, not a specific electrolyzer design or power-to-X route.

Details

Technology & product

Configuration DetailUnknown PtXInternational Energy Agency · as of 2026
Final UseSteelIberdrola

Capacity & economics

Total Capex2.3 billion euros estimated investment (announcement, not stated)Iberdrola

Status & timeline

EventOn 2 December 2021, H2 Green Steel and Iberdrola announced a partnership for a proposed 1 GW green-hydrogen electrolysis plant; several sites on the Iberian Peninsula were under consideration. This announcement does not establish a Portugal site or current project status.

Additional project information

Administrative AreaRandon location PortugalInternational Energy Agency · as of 2026
Capacity (Announced Size)800 MWInternational Energy Agency · as of 2026
Capacity (kt H2/y)139 kt H2/yInternational Energy Agency · as of 2026
Capacity (MWel)800 MWelInternational Energy Agency · as of 2026
Capacity (Nm³ H₂/h)177,778 Nm³ H₂/hInternational Energy Agency · as of 2026

Timeline

No recorded project events.

Sources & record history

Sources

Field sources

Shared date, confidence and value status appear once with their source above; a dash in the table refers to that source context.

FieldShown valueOriginal valueSourceDate basisMeaning
NameIberdrola - H2 Green Steel
View exact valueIberdrola - H2 Green Steel
IEA Hydrogen Projects dataset——
CountryPortugal
View exact valuePortugal
IEA Hydrogen Projects dataset——
Configuration DetailUnknown PtX
View exact valueUnknown PtX
IEA Hydrogen Projects dataset——
Final UseSteel
View exact value철강
Iberdrola (https://www.iberdrola.com/press-room/news/detail/deal-green-hydrogen-iberdrola-h2-green-steel); H2Prism earlier record (SRC-C-P200); H2Prism earlier record (SRC-C-P200)Older value
ProductH2
View exact valueH2
IEA Hydrogen Projects dataset——
ProductHydrogen
View exact value수소
Iberdrola (https://www.iberdrola.com/press-room/news/detail/deal-green-hydrogen-iberdrola-h2-green-steel); H2Prism earlier record (SRC-C-P200); H2Prism earlier record (SRC-C-P200)Older value
TechnologyOther Electrolysis
View exact valueOther Electrolysis
IEA Hydrogen Projects dataset——
TechnologyOther hydrogen production
View exact valueT-13
Iberdrola (https://www.iberdrola.com/press-room/news/detail/deal-green-hydrogen-iberdrola-h2-green-steel); H2Prism earlier record (SRC-C-P200); H2Prism earlier record (SRC-C-P200)Older value
Capacity1,000 MW
View exact value1000 MW
Iberdrola (https://www.iberdrola.com/press-room/news/detail/deal-green-hydrogen-iberdrola-h2-green-steel); H2Prism earlier record (SRC-C-P200); H2Prism earlier record (SRC-C-P200)Older value
Total Capex2.3 billion euros estimated investment (announcement, not stated)
View exact value{"unit":"billion euros","basis":"not stated","nature":"announcement","number":2.3,"of_what":"estimated investment"}
Iberdrola (https://www.iberdrola.com/press-room/news/detail/deal-green-hydrogen-iberdrola-h2-green-steel); H2Prism earlier record (SRC-C-P200); H2Prism earlier record (SRC-C-P200)Older value
EventOn 2 December 2021, H2 Green Steel and Iberdrola announced a partnership for a proposed 1 GW green-hydrogen electrolysis plant; several sites on the Iberian Peninsula were under consideration. This announcement does not establish a Portugal site or current project status.
View exact valueOn 2 December 2021, H2 Green Steel and Iberdrola announced a partnership for a proposed 1 GW green-hydrogen electrolysis plant; several sites on the Iberian Peninsula were under consideration. This announcement does not establish a Portugal site or current project status.
H2 Green Steel and Iberdrola announce €2.3 billion Green hydrogen ventureCurrent
Progress StatusCancelled
View exact valueCancelled
IEA Hydrogen Projects dataset——
Administrative AreaRandon location Portugal
View exact valueRandon location Portugal
IEA Hydrogen Projects dataset——
Capacity (Announced Size)800 MW
View exact value800MW
IEA Hydrogen Projects dataset——
Capacity (kt H2/y)139 kt H2/y
View exact value138.60266666666666 kt H2/y
IEA Hydrogen Projects dataset——
Capacity (MWel)800 MWel
View exact value800 MWel
IEA Hydrogen Projects dataset——
Capacity (Nm³ H₂/h)177,778 Nm³ H₂/h
View exact value177777.77777777778 Nm³ H₂/h
IEA Hydrogen Projects dataset——

Record history

1 current sourced value · 10 older values · Record updated

H2Prism separates published values from estimates. Check the linked source before you use a value. · Back to Hydrogen projects

Records are compiled with AI assistance. Original source links are shown when available.