Overview

StatusDormantInternational Energy Agency · as of 2026
Country · regionSpainInternational Energy Agency · as of 2026
TechnologyOther ElectrolysisInternational Energy Agency · as of 2026
ProductH2International Energy Agency · as of 2026
Capacity7 MW (planned electrolysis; Endesa announcement of 1 February 2021)

Capacity values retain their recorded units and scope. MW, kt H₂/y and Nm³ H₂/h are different measures; this page does not convert or add them without a shared operating basis. “Other Electrolysis” and “Unknown PtX” are recorded classifications, not a specific electrolyzer design or power-to-X route.

Details

Technology & product

Configuration DetailUnknown PtXInternational Energy Agency · as of 2026
Final UsePlanned green hydrogen use in a new power-generation plant at Barranco de Tirajana (announced 1 February 2021)
Power Source13 MW solar generation associated with the planned hydrogen project (Endesa announcement of 1 February 2021)

Additional project information

Administrative AreaBarranco de TirajanaInternational Energy Agency · as of 2026
Capacity (Announced Size)7 MWInternational Energy Agency · as of 2026
Capacity (Nm³ H₂/h)1,556 Nm³ H₂/hInternational Energy Agency · as of 2026
Capacity (kt H2/y)1.21 kt H2/yInternational Energy Agency · as of 2026
Capacity (MWel)7 MWelInternational Energy Agency · as of 2026

Timeline

No recorded project events.

Sources & record history

Sources

Field sources

Shared date, confidence and value status appear once with their source above; a dash in the table refers to that source context.

FieldShown valueOriginal valueSourceDate basisMeaning
NameBarranco de Tirajana - Endesa
View exact valueBarranco de Tirajana - Endesa
IEA Hydrogen Projects dataset——
CountrySpain
View exact valueSpain
IEA Hydrogen Projects dataset——
Configuration DetailUnknown PtX
View exact valueUnknown PtX
IEA Hydrogen Projects dataset——
Final UsePlanned green hydrogen use in a new power-generation plant at Barranco de Tirajana (announced 1 February 2021)
View exact valuePlanned green hydrogen use in a new power-generation plant at Barranco de Tirajana (announced 1 February 2021)
Endesa studies developing 23 green hydrogen projects in Spain with an investment of 2.9 billion euros—
Power Source13 MW solar generation associated with the planned hydrogen project (Endesa announcement of 1 February 2021)
View exact value13 MW solar generation associated with the planned hydrogen project (Endesa announcement of 1 February 2021)
Endesa studies developing 23 green hydrogen projects in Spain with an investment of 2.9 billion euros—
ProductH2
View exact valueH2
IEA Hydrogen Projects dataset——
TechnologyOther Electrolysis
View exact valueOther Electrolysis
IEA Hydrogen Projects dataset——
Capacity7 MW (planned electrolysis; Endesa announcement of 1 February 2021)
View exact value7 MW (planned electrolysis; Endesa announcement of 1 February 2021)
Endesa studies developing 23 green hydrogen projects in Spain with an investment of 2.9 billion euros—
Progress StatusDormant
View exact valueDormant
IEA Hydrogen Projects dataset——
Administrative AreaBarranco de Tirajana
View exact valueBarranco de Tirajana
IEA Hydrogen Projects dataset——
Capacity (Announced Size)7 MW
View exact value7MW
IEA Hydrogen Projects dataset——
Capacity (Nm³ H₂/h)1,556 Nm³ H₂/h
View exact value1555.5555555555557 Nm³ H₂/h
IEA Hydrogen Projects dataset——
Capacity (kt H2/y)1.21 kt H2/y
View exact value1.2127733333333335 kt H2/y
IEA Hydrogen Projects dataset——
Capacity (MWel)7 MWel
View exact value7 MWel
IEA Hydrogen Projects dataset——

Record history

3 current sourced values · 5 older values · Record updated

H2Prism separates published values from estimates. Check the linked source before you use a value. · Back to Hydrogen projects

Records are compiled with AI assistance. Original source links are shown when available.