Hydrogen projects
Public hydrogen production and supply projects tracked by H2Prism
Shown in catalog order. Capacity sort is unavailable because these results have no explicitly identified electrolyser MW_e values; generic MW values are not compared as the same measure.
| Project | Status | Country | Technology | Product | Capacity · sort unavailable |
|---|---|---|---|---|---|
| Electus Energy - Bakersfield | Cancellediea.org · as of 2026 | United Statesiea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | Roughly 75 MW (proposed solar-to-hydrogen facility; announced 28 November 2022)Production: Up to 9,300 tons per annum (planned; announced 28 November 2022) |
| MercurHy, phase 1 | Feasibilityiea.org · as of 2026 | Australiaiea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | 150 MWiea.org · as of 2026 |
| MercurHy, phase 2 | Conceptiea.org · as of 2026 | Australiaiea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | 350 MWiea.org · as of 2026 |
| MercurHy, phase 3 | Conceptiea.org · as of 2026 | Australiaiea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | 500 MWiea.org · as of 2026 |
| Orsted - Skovgaard Energy project in western Denmark - Phase 1 | Feasibilityiea.org · as of 2026 | Denmarkiea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | 150 MWiea.org · as of 2026 |
| Orsted - Skovgaard Energy project in western Denmark - Phase 2 (expansion) | Conceptiea.org · as of 2026 | Denmarkiea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | 2,850 MWiea.org · as of 2026 |
| First Hydrogen - Shawinigan | Dormantiea.org · as of 2026 | Canadaiea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | 35 MWiea.org · as of 2026 |
| Blastr Green Steel - Inkoo | Feasibilityiea.org · as of 2026 | Finlandiea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | 800 MWiea.org · as of 2026 |
| Liquid Wind, Flagship 3rd plant | On holdiea.org · as of 2026 | Swedeniea.org · as of 2026 | Not confirmed | MeOHiea.org · as of 2026 | 221 MWiea.org · as of 2026 |
| AM Green (formerly Greenko ZeroC) - Kakinada city, phase 1 | FID / Constructioniea.org · as of 2026 | IndiaMinistry of New and Renewable Energy, Government of India (https://nghm.mnre.gov.in/admin/uploads/1776341273_1018.pdf) | Not confirmed | Ammoniaiea.org · as of 2026 | 1,300 MWiea.org · as of 2026 |
| Enap - Cabo Negro | FID / Constructioniea.org · as of 2026 | Chileiea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | 1 MWiea.org · as of 2026 |
| Hydrogen Offshore Production Europe (HOPE) | Demoiea.org · as of 2026 | Germanyiea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | 10 MWiea.org · as of 2026 |
| Linde - Fort Saskatchewan | FID / Constructioniea.org · as of 2026 | Canadaiea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | Not confirmed |
| Yara-BASF Gulf Coast | Cancellediea.org · as of 2026 | United Statesiea.org · as of 2026 | Not confirmed | Ammoniaiea.org · as of 2026 | Not confirmed |
| SSE Aldbrough storage site | Feasibilityiea.org · as of 2026 | United Kingdomiea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | 35 MW |
| Kintore Scotland Hydrogen project - phase 1 | Feasibilityiea.org · as of 2026 | United Kingdomiea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | 500 MWiea.org · as of 2026 |
| Kintore Scotland Hydrogen project - phase 2 | Conceptiea.org · as of 2026 | United Kingdomiea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | 2,500 MWiea.org · as of 2026 |
| Rosedale Green Hydrogen project | Conceptiea.org · as of 2026 | Australiaiea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | 560 MWiea.org · as of 2026Production: Designed to generate 25,000 kg/day of green hydrogen (proposed) |
| Mauritania - Green Ammonia project - phase 1 | Conceptiea.org · as of 2026 | Mauritaniaiea.org · as of 2026 | Not confirmed | Ammoniaiea.org · as of 2026 | 400 MWiea.org · as of 2026 |
| Mauritania - Green Ammonia project - phase 2 | Conceptiea.org · as of 2026 | Mauritaniaiea.org · as of 2026 | Not confirmed | Ammoniaiea.org · as of 2026 | 9,600 MWiea.org · as of 2026 |
| Rio Grande do Sul | Conceptiea.org · as of 2026 | Braziliea.org · as of 2026 | Not confirmed | Ammoniaiea.org · as of 2026 | 483 MWiea.org · as of 2026 |
| Alesund green hydrogen project - phase 1 - FjordH2 | Feasibilityiea.org · as of 2026 | Norwayiea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | 20 MWiea.org · as of 2026 |
| Alesund green hydrogen project - phase 2 - FjordH2 | Conceptiea.org · as of 2026 | Norwayiea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | 250 MWiea.org · as of 2026 |
| EWE - Clean Hydrogen Coastline, project Bremen | On holdiea.org · as of 2026 | Germanyiea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | Planned 50 MW electrolysis plant in Bremen (announced 15 February 2024) |
| Valle H2 Navarra project | Feasibility | Spain | Not confirmed | H2 | 25 MW planned electrolyser capacity (announced 21 February 2023) |
| Saltend Chemicals Park - Hull - phase 1 | Feasibilityiea.org · as of 2026 | United Kingdomiea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | 100 MWiea.org · as of 2026 |
| Liquid Organic Hydrogen Carrier (LOHC) for Hydrogen Transport from Scotland (LHyTS) | Not confirmed | Not confirmed | Not confirmed | Not confirmed | Not confirmed |
| Borna Hydrogen Plant, phase 1 | On holdiea.org · as of 2026 | Germanyiea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | 100 MWiea.org · as of 2026 |
| Borna Hydrogen Plant, phase 2 | On holdiea.org · as of 2026 | Germanyiea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | 900 MWiea.org · as of 2026 |
| Hybla Project | Conceptiea.org · as of 2026 | Italyiea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | 80 MWiea.org · as of 2026 |
| Votalia - Taqa Arabia -phase 2 | Conceptiea.org · as of 2026 | Egyptiea.org · as of 2026 | Not confirmed | Ammoniaiea.org · as of 2026 | 500 MWiea.org · as of 2026 |
| Nujio'qonik Green Hydrogen -phase 1 | Cancellediea.org · as of 2026 | CanadaGovernment of Newfoundland and Labrador, Environment, Conservation and Climate Change (https://www.gov.nl.ca/eccc/projects/2202-2/) | Not confirmed | Ammoniaiea.org · as of 2026 | 650 MWiea.org · as of 2026 |
| RIC Energy Valladolid -phase 2 | Conceptiea.org · as of 2026 | Spainiea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | 5 MWiea.org · as of 2026 |
| Puertollano HydRIC project Phase II | Cancellediea.org · as of 2026 | Spainiea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | Not confirmed |
| Ground Investment Corp (GIC) - green hydrogen project | Feasibilityiea.org · as of 2026 | Romaniaiea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | 10 MW electrolyser (planned; announced 8 December 2022) |
| Nascar | Feasibilityiea.org · as of 2026 | Spainiea.org · as of 2026 | Not confirmed | MeOHiea.org · as of 2026 | 139 MWiea.org · as of 2026 |
| Vientos Magallanicos | Dormantiea.org · as of 2026 | Chileiea.org · as of 2026 | Not confirmed | Ammoniaiea.org · as of 2026 | 800 MWiea.org · as of 2026 |
| Dow Stade | Conceptiea.org · as of 2026 | Germanyiea.org · as of 2026 | Not confirmed | MeOHiea.org · as of 2026 | 387 MWiea.org · as of 2026 |
| Swiss Liquid Future - Elkem, methanol plant | Conceptiea.org · as of 2026 | Norwayiea.org · as of 2026 | Not confirmed | MeOHiea.org · as of 2026 | 820 MWiea.org · as of 2026 |
| Eastern Cape MeOH plant | Feasibilityiea.org · as of 2026 | South Africaiea.org · as of 2026 | Not confirmed | MeOHiea.org · as of 2026 | 120 MWiea.org · as of 2026 |
| Maersk - Ørsted methanol Gulf plant | Feasibilityiea.org · as of 2026 | United Statesiea.org · as of 2026 | Not confirmed | MeOHiea.org · as of 2026 | 675 MWiea.org · as of 2026Production: Approximately 300,000 tonnes of e-methanol per year (plan announced 10 March 2022). |
| Maersk - Carbon Sink methanol plant | Feasibilityiea.org · as of 2026 | United Statesiea.org · as of 2026 | Not confirmed | MeOHiea.org · as of 2026 | 221 MWiea.org · as of 2026 |
| H2 Emden Electrolyzer, phase 2 | Feasibilityiea.org · as of 2026 | Germanyiea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | 190 MWiea.org · as of 2026 |
| GreenGo Tarm plant (Megaton) | Cancellediea.org · as of 2026 | Denmarkiea.org · as of 2026 | Not confirmed | MeOHiea.org · as of 2026 | Not confirmed |
| Element Resources - Lancaster | Feasibilityiea.org · as of 2026 | United Statesiea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | 135 MWiea.org · as of 2026 |
| Solar methanol | Feasibilityiea.org · as of 2026 | Australiaiea.org · as of 2026 | Not confirmed | MeOHiea.org · as of 2026 | 10 MW planned electrolyser capacity (announced 13 February 2023) |
| ScaleH2 | Feasibility | Australiaiea.org · as of 2026 | Not confirmed | Ammoniaiea.org · as of 2026 | 1,000 MW (initial feasibility-study design; not committed capacity) |
| Omnia - WKN Windcurrent green ammonia plant | Conceptiea.org · as of 2026 | South Africaiea.org · as of 2026 | Not confirmed | Ammoniaiea.org · as of 2026 | 208 MWiea.org · as of 2026 |
| Brooge Renewable Energy's (BRE) renewable ammonia plant | FeasibilityBrooge Energy Limited, filed with U.S. Securities and Exchange Commission (https://www.sec.gov/Archives/edgar/data/1774983/000121390025038264/ea0240456-20fa1_brooge.htm) · as of 2025 | United Arab EmiratesBrooge Energy Limited, filed with U.S. Securities and Exchange Commission (https://www.sec.gov/Archives/edgar/data/1774983/000121390025038264/ea0240456-20fa1_brooge.htm) · as of 2025 | Not confirmed | Ammoniaiea.org · as of 2026 | 2,079 MWiea.org · as of 2026Production: Planned green ammonia production capacity of 1950 Tons Per Day (TPD), full project in two phases (announced 2 August 2023) |
| Pronghorn H2 | Conceptiea.org · as of 2026 | United Statesiea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | 1,000 MWiea.org · as of 2026 |
| Gobi H2 | Feasibilityiea.org · as of 2026 | Mongoliaiea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | 10 MWiea.org · as of 2026 |
| Sustainable Fuels Group - CIP Carbon reduced Ammonia plant St Rose (LA) | Feasibilityiea.org · as of 2026 | United Statesiea.org · as of 2026 | Not confirmed | Ammoniaiea.org · as of 2026 | Not confirmed |
| China State Shipbuilding (CSSC) 500MW wind power hydrogen methanol production project in Tong Liao | FID / Constructioniea.org · as of 2026 | Chinaiea.org · as of 2026 | Not confirmed | MeOHiea.org · as of 2026 | 316 MWiea.org · as of 2026 |
| Hy2gen Yucatan Marengo project, 1 | Conceptiea.org · as of 2026 | Mexicoiea.org · as of 2026 | Not confirmed | Ammoniaiea.org · as of 2026 | 160 MWiea.org · as of 2026 |
| Hy2gen Yucatan Marengo project, 2 | Conceptiea.org · as of 2026 | Mexicoiea.org · as of 2026 | Not confirmed | Ammoniaiea.org · as of 2026 | 40 MWiea.org · as of 2026 |
| GuofuHee - CMEC - Longyuan Power grren H2 plant in Inner Mongolia | Conceptiea.org · as of 2026 | Chinaiea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | 38.1 MWiea.org · as of 2026 |
| Lhyfe Bade-Würtemberg | FID / ConstructionH2Prism earlier record | Germanyiea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | 10 MWiea.org · as of 2026Production: Production capability of up to 4 tons of renewable hydrogen per day at the 10 MW Schwäbisch Gmünd plant (14 October 2025 announcement) |
| Fiume Santo, demo plant | Demoiea.org · as of 2026 | Italyiea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | 1 MWiea.org · as of 2026 |
| Fiume Santo, comercial plant | Feasibilityiea.org · as of 2026 | Italyiea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | 50 MWiea.org · as of 2026 |
| OX2 Neptunus Hub | Conceptiea.org · as of 2026 | Swedeniea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | 2,361 MWiea.org · as of 2026Production: Applied-for maximum hydrogen production of 370,000 tonnes annually (16 January 2024 permit-application announcement). |
| Urbaser methanol plant, phase 1 | Feasibilityiea.org · as of 2026 | Spainiea.org · as of 2026 | Not confirmed | MeOHiea.org · as of 2026 | Not confirmed |
| Los Barrios coal plant, Cadiz, phase 2 | Feasibilityiea.org · as of 2026 | Spainiea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | 100 MWiea.org · as of 2026 |
| Los Barrios coal plant, Cadiz, phase 3 | Conceptiea.org · as of 2026 | Spainiea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | 400 MWiea.org · as of 2026 |
| Hydrogen Utopia waste-to-plastic plant | Feasibilityiea.org · as of 2026 | Ireland | Not confirmed | H2iea.org · as of 2026 | Not confirmed |
| Toqlukuti'k Wind and H2 Project | FeasibilityToqlukuti’k Wind and Hydrogen Ltd. / Government of Newfoundland and Labrador (https://www.gov.nl.ca/ecc/files/EA-2368-Registration.pdf) · as of 2025 | CanadaToqlukuti’k Wind and Hydrogen Ltd. / Government of Newfoundland and Labrador (https://www.gov.nl.ca/ecc/files/EA-2368-Registration.pdf) · as of 2025 | Not confirmed | H2iea.org · as of 2026 | 2,500 MWiea.org · as of 2026Production: 4,400 to 5,550 tonnes per day ammonia (announced)Toqlukuti’k Wind and Hydrogen Ltd. / Government of Newfoundland and Labrador (https://www.gov.nl.ca/ecc/files/EA-2368-Registration.pdf) · as of 2025 |
| Holmaneset Project (GAP FFI Holmaneset) | Feasibilityiea.org · as of 2026 | Norwayiea.org · as of 2026 | Not confirmed | Ammoniaiea.org · as of 2026 | 300 MWiea.org · as of 2026 |
| Onyx plant - Port of Rotterdam | Feasibilityiea.org · as of 2026 | Netherlandsiea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | Not confirmed |
| Ecopetrol green methanol and biofuel project | Cancellediea.org · as of 2026 | Colombiaiea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | Not confirmed |
| Chubu Electric Power - Chiyoda - Hazer, phase 1 | Conceptiea.org · as of 2026 | Japaniea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | Not confirmed |
| Chubu Electric Power - Chiyoda - Hazer, phase 2 | Conceptiea.org · as of 2026 | Japaniea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | Not confirmed |
| Adams Fork Energy (WV) | Conceptiea.org · as of 2026 | United Statesiea.org · as of 2026 | Not confirmed | Ammoniaiea.org · as of 2026 | Not confirmed |
| Horizonte de Verano - Summer Horizon - phase 1 | Conceptiea.org · as of 2026 | Peruiea.org · as of 2026 | Not confirmed | Ammoniaiea.org · as of 2026 | 873 MWiea.org · as of 2026 |
| Pampas | Dormantiea.org · as of 2026 | Argentinaiea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | 505 MWiea.org · as of 2026 |
| Bear Head Energy - Nova Scotia project Phase 1a | Dormantiea.org · as of 2026 | Canadaiea.org · as of 2026 | Not confirmed | Ammoniaiea.org · as of 2026 | 400 MWiea.org · as of 2026 |
| Hive H2 Albamed, phase 1 | Feasibilityiea.org · as of 2026 | Spainiea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | 800 MWiea.org · as of 2026 |
| Hive H2 Albamed, phase 2 | Conceptiea.org · as of 2026 | Spainiea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | 3,200 MWiea.org · as of 2026 |
| Achema - green hydrogen plant | Cancellediea.org · as of 2026 | Lithuaniaiea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | Not confirmed |
| CF's Verdigris Complex (OK) | Cancellediea.org · as of 2026 | United Statesiea.org · as of 2026 | Not confirmed | Ammoniaiea.org · as of 2026 | 100 MW proposed electrolysis capacity (announced 24 April 2023) |
| Dominica Geothermal Development Company - Kenesjay green hydrogen plant | Conceptiea.org · as of 2026 | Dominicaiea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | 164 MWiea.org · as of 2026 |
| ErasmoPower2X | Feasibilityiea.org · as of 2026 | Spainiea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | 325 MWiea.org · as of 2026Production: 55,000 tonnes per year |
| Electrolysis Corridor East Germany (H2 Corridor) Phase I - Pasewalk | Feasibilityiea.org · as of 2026 | Germanyiea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | 60 MWiea.org · as of 2026 |
| Green Pegasus | Dormantiea.org · as of 2026 | Chileiea.org · as of 2026 | Not confirmed | Ammoniaiea.org · as of 2026 | 1,590 MWiea.org · as of 2026 |
| H2Montoir | Conceptiea.org · as of 2026 | Franceiea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | Not confirmed |
| JSW Steel | Successfully commissioned (reported 17 October 2025) | Indiaiea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | 25 MW electrolyser capacity (reported 17 October 2025)Production: Reported 3,800tpa hydrogen (17 October 2025) |
| Idemitsu Refinery - H2 from municipal waste | Conceptiea.org · as of 2026 | Japaniea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | Not confirmed |
| Argentia Renewables Project | Cancellediea.org · as of 2026 | Not confirmed | Not confirmed | Ammoniaiea.org · as of 2026 | Not confirmed |
| Solatio - Ammonia project state of Piaui (phase I) | On holdiea.org · as of 2026 | Braziliea.org · as of 2026 | Not confirmed | Ammoniaiea.org · as of 2026 | 1,000 MWiea.org · as of 2026 |
| Solatio - Ammonia project Parnaiba export zone (phases II and III) | On holdiea.org · as of 2026 | Braziliea.org · as of 2026 | Not confirmed | Ammoniaiea.org · as of 2026 | 2000 MWiea.org · as of 2026 |
| Koping - Waste-to-Hydrogen | Feasibilityiea.org · as of 2026 | Swedeniea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | Not confirmed |
| Hydrogen for self-sufficiency | Cancellediea.org · as of 2026 | Canadaiea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | Not confirmed |
| H2 production for a H2 Fuell station | FID / Constructioniea.org · as of 2026 | Netherlandsiea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | 1 MWiea.org · as of 2026 |
| Repsol Tarragona, phase 1 | Feasibilityiea.org · as of 2026 | Spainiea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | 150 MWiea.org · as of 2026 |
| Breogan project | Feasibilityiea.org · as of 2026 | Spainiea.org · as of 2026 | Not confirmed | Synfuelsiea.org · as of 2026 | 115 MWiea.org · as of 2026 |
| BalticSeaH2 | Feasibilityiea.org · as of 2026 | Estoniaiea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | 1,049 MWiea.org · as of 2026 |
| Puertollano HydRIC project Phase I | Cancellediea.org · as of 2026 | Spainiea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | Not confirmed |
| Calix green steel plant | Feasibilityiea.org · as of 2026 | Australiaiea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | 10.4 MWiea.org · as of 2026 |
| HYRO 3 Northfleet- Kimberly-Clark project (2 pamts) | FID / Constructioniea.org · as of 2026 | United KingdomDepartment for Energy Security and Net Zero (https://www.gov.uk/government/news/jobs-unlocked-as-first-wave-of-hydrogen-projects-sign-contracts) · as of 2025 | Not confirmed | H2iea.org · as of 2026 | 12.5 MWiea.org · as of 2026 |
| Ver-Amonia | Feasibilityiea.org · as of 2026 | Spainiea.org · as of 2026 | Not confirmed | Ammoniaiea.org · as of 2026 | Planned 25 MW integrated electrolysis in Utrillas, Teruel (announced 4 June 2025) |
| Green Port Langosteira | Feasibilityiea.org · as of 2026 | Spainiea.org · as of 2026 | Not confirmed | Ammoniaiea.org · as of 2026 | 312 MWiea.org · as of 2026 |
| Raven Iberia Zaragoza waste-to-hydrogen plant | Feasibilityiea.org · as of 2026 | Spainiea.org · as of 2026 | Not confirmed | H2iea.org · as of 2026 | Not confirmed |