TAQA & Abu Dhabi Ports

577 MW · Electrolysis · United Arab Emirates

Concept

United Arab Emirates Map: Natural Earth
Capacity
577 MW
Target operation
—
Technology
Electrolysis
Country
United Arab Emirates
Development stage
Concept

Country scale

#3 by recorded MW among 12 projects with capacity recorded in this country.

  1. Brooge Renewable Energy's (BRE) renewable ammonia plant2,079 MW
  2. Khalifa Industrial Zone Abu Dhabi (KIZAD) Helios Industry- phase 2584 MW
  3. TAQA & Abu Dhabi Ports577 MW

All stages are included. Capacity does not describe current production.

Project details

Electricity source
Solar
Site
Abu Dhabi
Production capacity
100 ktpa
Sources (3)
  • IEA Hydrogen Production Projects 2026 (preserved CSV edition, received 2026-10-24)

    International Energy Agency · As of 2026-06-18

    Original value: Solar (Electricity source: Solar)

    Original value: Abu Dhabi (Site: Abu Dhabi)

    Original value: 100 kt H2/y (Product: Hydrogen)

    Original value: Concept

    Original value: Ammonia (Product: Hydrogen)

    Original value: 577.1894720640296 MW

    Original value: Ammonia (Product: Ammonia)

    Original value: Other Electrolysis

    Published value: 577.2 MW

  • IEA Hydrogen Production Projects 2026

    International Energy Agency

    Original value: Capacity (MWel): 577.1894720640296

    Original value: Concept

    Original value: 100kt H2/y capacity (Announced Size)

    Original value: 128264.32712533991 (Capacity (Nm³ H₂/h))

    Original value: 100 (Capacity (kt H2/y))

    Original value: Ammonia (Product: Ammonia)

    Original value: Water electrolysis (Technology: Water electrolysis)

  • International Energy Agency

    International Energy Agency

    Original value: 128264.32712533991 (Capacity (Nm³ H₂/h))

    Original value: 100 (Capacity (kt H2/y))

    Original value: Ammonia (Product: Ammonia)

    Original value: Water electrolysis (Technology: Water electrolysis)

Projects in United Arab Emirates

Major projects: operating and FID first, then by recorded capacity.

All projects in this country