United Arab Emirates
20 hydrogen projects are linked to United Arab Emirates.
- Linked projects
- 20
- Operational
- 2
- FID / Construction
- 2
- Companies based here
- 6
From plans to production
- Concept1050%
- Feasibility315%
- Demo15%
- FID / Construction210%
- Operational210%
- Dormant15%
- Cancelled15%
Stage recorded for 20 of 20 projects.
Sources
Counts use the projects shown in this section's scope. Unknown stages are excluded from the distribution. Open a project for its sources.
Projects by recorded capacity
Projects with a positive capacity in MW. All stages are included.
- Brooge Renewable Energy's (BRE) renewable ammonia plant 2,079 MW
- Khalifa Industrial Zone Abu Dhabi (KIZAD) Helios Industry- phase 2 584 MW
- TAQA & Abu Dhabi Ports 577 MW
- TES Tree Energy Solutions - UAE Project 500 MW
- SK Hydrogen-Ammonia plant 260 MW
Sources
Capacity comes from the linked project pages. Open a project to inspect its original sources.
Country details
- Hydrogen strategy role
- The strategy contributes to fostering the domestic market, developing a regulatory framework and policies that support hydrogen as a sustainable fuel for the future, strengthening regional collaboration to establish a regional hydrogen market, and bolstering investments in research and development to improve cost effectiveness of hydrogen production, transport, and utilization.
Sources (3)
- ISO (undated)
ISO
Original value: 3166-1 alpha-2: AE (ISO) (Identifier: AE · Scheme: 3166-1 alpha-2)
Original value: 3166-1 alpha-3: ARE (ISO) (Identifier: ARE · Scheme: 3166-1 alpha-3)
- Ministry of Energy and Infrastructure (MoEI), UAE
Ministry of Energy and Infrastructure (MoEI), UAE
Original value: The strategy contributes to fostering the domestic market, developing a regulatory framework and policies that support hydrogen as a sustainable fuel for the future, strengthening regional collaboration to establish a regional hydrogen market, and bolstering investments in research and development to improve cost effectiveness of hydrogen production, transport, and utilization.
- Energy Strategies To Achieve Net Zero
Ministry of Energy and Infrastructure (MoEI), UAE
Original value: The strategy contributes to fostering the domestic market, developing a regulatory framework and policies that support hydrogen as a sustainable fuel for the future, strengthening regional collaboration to establish a regional hydrogen market, and bolstering investments in research and development to improve cost effectiveness of hydrogen production, transport, and utilization.
Connected companies
View 6 companies
- ADNOC Headquartered in
- Orascom Construction Registered in
- TAQA Headquartered in
- Masdar Registered in
- AMEA Power Headquartered in
- Fertiglobe Headquartered in
Sources (7)
- ADNOC DIGITAL PLATFORM TERMS AND CONDITIONS
ADNOC
Original value: Registered in
Original value: Headquartered in
- Annual Report 2022
Orascom Construction PLC
Original value: Registered in
- Official company source
taqa.com
Original value: Headquartered in
- Abu Dhabi, UAE office location
Masdar
Original value: Headquartered in
- Official company source
ameapower.com
Original value: Headquartered in
- Official company source
fertiglobe.com
Original value: Headquartered in
- Abu Dhabi Future Energy Company PJSC (Masdar) Report of the Board of Directors and Consolidated Financial Statements 31 December 2025
Masdar
Original value: Registered in
Connected projects
View 20 projects
- NWTN - CMEC Middle East green hydrogen plant Location
- Green Hydrogen and Ammonia Production Project, - Abu Dhabi Location
- TAZIZ project, MoU ADNOC, ENEOS, Mitsui, phase 2 Location
- Khalifa Industrial Zone Abu Dhabi (KIZAD) Helios Industry- phase 1 Location
- TES Tree Energy Solutions - UAE Project Location
- Emirates Steel Industries - Al Reyadah CCUS Location
- Masdar City green H2 Location
- TA’ZIZ blue ammonia Location
- TAQA & Abu Dhabi Ports Location
- Green hydrogen Project, Mohammad Bin Rashid Solar Park Location
- EMSTEEL green steel Location
- SK Hydrogen-Ammonia plant Location
- Brooge Renewable Energy's (BRE) renewable ammonia plant Location
- Khalifa Industrial Zone Abu Dhabi (KIZAD) Helios Industry- phase 2 Location
- DEWA Pilot project 2 (Alkaline) Location
- TAQA-Emirates Steel Green H2 Location
- Bee’ah waste-to-hydrogen Location
- Engie - Masdar - Fertiglobe Abu Dhabi Location
- Uniper Masdar Hydrogen Solar PV Park Location
- Liberty Steel green steel Location
Sources (8)
- IEA Hydrogen Production Projects 2026 (preserved CSV edition, received 2026-10-24)
International Energy Agency · As of 2026-06-18
Original value: Location
- IEA Hydrogen Production Projects 2026
International Energy Agency
Original value: Location
- Masdar (https://masdar.ae/en/news/newsroom/totalenergies-joins-masdar-and-siemens-energy-in-initiative-to-drive-green-hydrogen-development)
Masdar
Original value: Location
- International Energy Agency
International Energy Agency
Original value: Location
- IEA Hydrogen Production Projects Database
International Energy Agency
Original value: Location
- Brooge Energy Limited via GlobeNewswire (https://www.globenewswire.com/news-release/2023/08/02/2716921/0/en/Brooge-Renewable-Energy-Limited-Successfully-Concludes-Feasibility-Study-for-Green-Ammonia-Project-Ushering-in-a-Bright-and-Sustainable-Energy-Future-in-UAE.html)
Brooge Energy Limited via GlobeNewswire
Original value: Location
- Power plant profile: Uniper Masdar Hydrogen Solar PV Park, United Arab Emirates
Power Technology / GlobalData
Original value: Location
- LIBERTY Steel Signs MoU with AD Ports Group to Explore Plans to Host a Green Iron Production Facility in KEZAD
LIBERTY Steel Group
Original value: Location