H2PrismHydrogen intelligenceSubscribe

TA’ZIZ blue ammonia

· United Arab Emirates

Feasibility

United Arab Emirates Map: Natural Earth
Capacity
—
Target operation
2030
Technology
—
Country
United Arab Emirates
Development stage
Feasibility

Target operation

2030Target operation
  1. 2028
  2. 2029
  3. 2030
  4. 2031
  5. 2032

Target year as recorded for this project. The axis does not imply stage history.

Project details

Announced size
1000 kt NH3/y
Site
Abu Dahbi
Process description
Unknown technology
Sources (3)
  • International Energy Agency

    International Energy Agency

    Original value: 1000 kt NH3/y

    Original value: Ammonia (Product: Ammonia)

    Original value: 230968.13914114208 (Capacity (Nm³ H₂/h))

    Original value: Unknown technology

    Original value: 180.072 (Capacity (kt H2/y))

  • IEA Hydrogen Production Projects 2026

    International Energy Agency

    Original value: 1000 kt NH3/y

    Original value: Ammonia (Product: Ammonia)

    Original value: Feasibility study

    Original value: 2030 (Schedule question: Date online)

    Original value: NG w CCUS

    Original value: 230968.13914114208 (Capacity (Nm³ H₂/h))

    Original value: Natural gas reforming (Pathway: Natural gas reforming)

    Original value: Unknown technology

    Original value: 180.072 (Capacity (kt H2/y))

  • IEA Hydrogen Production Projects 2026 (preserved CSV edition, received 2026-10-24)

    International Energy Agency · As of 2026-06-18

    Original value: Feasibility

    Original value: Abu Dahbi (Site: Abu Dahbi)

    Original value: Ammonia (Product: Ammonia)

    Original value: Ammonia (Product: Hydrogen)

    Original value: 2030

Projects in United Arab Emirates

Major projects: operating and FID first, then by recorded capacity.

All projects in this country