Tyczka Hydrogen electrolysis plant in Schweinfurt
Electrolysis · Germany
- Capacity
- —
- Target operation
- —
- Technology
- Electrolysis
- Country
- Germany
- Development stage
- —
Project details
- Site
- port of Schweinfurt
- Function
- Production
Sources (3)
- Tyczka GmbH
Tyczka GmbH
Original value: planned / construction scheduled; commissioning scheduled end of 2026
Original value: port of Schweinfurt (Site: port of Schweinfurt)
Original value: Engineering and approval planning are currently underway; commissioning is scheduled to start at the end of 2026.
Original value: engineering and approval planning underway
Original value: Production (Function: Production)
- New hydrogen hub in the center of Germany: Tyczka Hydrogen builds electrolysis plant for green hydrogen in Schweinfurt
Tyczka GmbH
Original value: planned / construction scheduled; commissioning scheduled end of 2026
Original value: electrolysis
Original value: Water electrolysis (Technology: Water electrolysis)
Original value: port of Schweinfurt (Site: port of Schweinfurt)
Original value: Production (Function: Production)
Original value: industry
- Tyczka Hydrogen begins construction of refuelling station - planning for in-house production in full swing
Tyczka GmbH
Original value: Engineering and approval planning are currently underway; commissioning is scheduled to start at the end of 2026.
Original value: engineering and approval planning underway
Sources (2)
- New hydrogen hub in the center of Germany: Tyczka Hydrogen builds electrolysis plant for green hydrogen in Schweinfurt
Tyczka GmbH
Original value: Location
- Tyczka GmbH
Tyczka GmbH
Original value: Location
Projects in Germany
Major projects: operating and FID first, then by recorded capacity.
- Ostfriesland electrolysis / Clean Hydrogen Coastline - Electrolysis East FrisiaUnder construction280 MW
- GET H2 Nukleus (Phase 3)FID / Construction100 MW
- Hamburg Green Hydrogen Hub (HGHH) project - old Moorburg plantUnder construction100 MW
- REFHYNE (Phase 2)FID / Construction100 MW
- SALCOS - first expansion - phase 1FID / Construction100 MW