- Capacity
- —
- Target operation
- —
- Technology
- Electrolysis
- Country
- Germany
- Development stage
- FID / Construction
- Connected companies
- 1
Project details
Sources (7)
- Gasunie and Storag Etzel start filling hydrogen caverns
Gasunie
Original value: pilot project
Original value: up to 1TWh of hydrogen
Original value: Gasunie will also start constructing the surface facility in the near future.
Original value: Research or pilot
Original value: conversion of two existing salt caverns and associated above-ground facilities for hydrogen storage
Original value: Hydrogen (Product: Hydrogen)
- Gasunie
Gasunie
Original value: pilot project
Original value: Gasunie will also start constructing the surface facility in the near future.
Original value: Research or pilot
Original value: conversion of two existing salt caverns and associated above-ground facilities for hydrogen storage
- IEA Hydrogen Production Projects 2026
International Energy Agency
Original value: 2007 (Schedule question: Date online)
Original value: DEMO
Original value: Water electrolysis (Technology: Water electrolysis)
- Salt caverns as flexible hydrogen storage facilities
Federal Ministry for Economic Affairs and Energy / Energy Research
Original value: FID / Construction
Original value: The above-ground facilities are currently being completed.
Original value: developing various highly flexible and multicyclic operating modes
Original value: underground hydrogen storage in salt caverns with purification, compression, and multicyclic operating modes (Process section: source process)
Original value: construction and testing
Original value: various highly flexible and multicyclic operating modes the gas will be purified, compressed and its quality monitored large-volume underground storage of hydrogen (Process section: underground hydrogen storage in salt caverns with purification, compression, and multicyclic operating modes)
- Federal Ministry for Economic Affairs and Energy / Energy Research
Federal Ministry for Economic Affairs and Energy / Energy Research
Original value: FID / Construction
Original value: The above-ground facilities are currently being completed.
Original value: developing various highly flexible and multicyclic operating modes
Original value: various highly flexible and multicyclic operating modes the gas will be purified, compressed and its quality monitored large-volume underground storage of hydrogen (Process section: underground hydrogen storage in salt caverns with purification, compression, and multicyclic operating modes)
Original value: construction and testing
- International Energy Agency
International Energy Agency
Original value: DEMO
Original value: Water electrolysis (Technology: Water electrolysis)
- IEA Hydrogen Production Projects 2026 (preserved CSV edition, received 2026-10-24)
International Energy Agency · As of 2026-06-18
Original value: Mobility (Product: Hydrogen)
Original value: Power generation (End use: Power generation · Product: Hydrogen)
Original value: Gas grid injection (End use: Gas grid injection · Product: Hydrogen)
Companies and roles
| Company | Role in project | Company activity |
|---|---|---|
| Gasunie | Developer | Developer · Operator · Transport and storage |
Sources (4)
- H2CAST Etzel Project Update – A picture that says more than any figure
H2CAST Etzel · As of 2026-09-14
Original value: Developer
- Gasunie
Gasunie
Original value: Operator (Company role: Operator)
Original value: Developer (Company role: Developer)
Original value: Transport and storage (Company role: Transport and storage)
- Gasunie official news
Gasunie
Original value: Operator (Company role: Operator)
Original value: Transport and storage (Company role: Transport and storage)
- Hydrogen network
Gasunie
Original value: Developer (Company role: Developer)
Sources (2)
- International Energy Agency
International Energy Agency
Original value: Location
- Gasunie and Storag Etzel start filling hydrogen caverns
Gasunie
Original value: Location
Projects in Germany
Major projects: operating and FID first, then by recorded capacity.
- Ostfriesland electrolysis / Clean Hydrogen Coastline - Electrolysis East FrisiaUnder construction280 MW
- GET H2 Nukleus (Phase 3)FID / Construction100 MW
- Hamburg Green Hydrogen Hub (HGHH) project - old Moorburg plantUnder construction100 MW
- REFHYNE (Phase 2)FID / Construction100 MW
- SALCOS - first expansion - phase 1FID / Construction100 MW