- Capacity
- 2.37 MW
- Target operation
- 2026
- Technology
- Electrolysis
- Country
- United States
- Development stage
- FID / Construction
Target operation
- 2024
- 2025
- 2026
- 2027
- 2028
Target year as recorded for this project. The axis does not imply stage history.
Country scale
#74 by recorded MW among 105 projects with capacity recorded in this country.
- Hydrogen City, phase 215,316 MW
- Angeles Link15,000 MW
- Great Falls - Calumet & Montana Renewables2.37 MW
All stages are included. Capacity does not describe current production.
Project details
- Site
- Great Falls
Sources (3)
- IEA Hydrogen Production Projects 2026 (preserved CSV edition, received 2026-10-24)
International Energy Agency · As of 2026-06-18
Original value: 2.3719129689944265 MW
Original value: 2026
Original value: FID / Construction
Original value: Biofuels (Product: Hydrogen)
Original value: Great Falls (Site: Great Falls)
Original value: Synthetic diesel and gasoline (Product: Synthetic diesel and gasoline)
Original value: Other Electrolysis
Published value: 2.372 MW
- IEA Hydrogen Production Projects 2026
International Energy Agency
Original value: FID/Construction
Original value: 2026 (Schedule question: Date online)
Original value: Synthetic fuels (Product: Synthetic fuels)
Original value: Capacity (MWel): 2.3719129689944265
Original value: 0.4109418282548477 (Capacity (kt H2/y))
Original value: 527.0917708876503 (Capacity (Nm³ H₂/h))
Original value: 18,000 bpd total, 15,000 bpd SAF (biofuels) (Announced Size)
Original value: Water electrolysis (Technology: Water electrolysis)
- International Energy Agency
International Energy Agency
Original value: 0.4109418282548477 (Capacity (kt H2/y))
Original value: 527.0917708876503 (Capacity (Nm³ H₂/h))
Sources (2)
- IEA Hydrogen Production Projects 2026 (preserved CSV edition, received 2026-10-24)
International Energy Agency · As of 2026-06-18
Original value: Location
- IEA Hydrogen Production Projects 2026
International Energy Agency
Original value: Location
Projects in United States
Major projects: operating and FID first, then by recorded capacity.