H2Prism
Hydrogen calculators & data

Camden County (GA), green power plant

United States · US-GA Georgia

Overview

StatusOperationalH2Prism earlier record
Country · regionUnited StatesPlug Power Inc. · US-GA GeorgiaPlug Power Inc.
TechnologyPEMInternational Energy Agency · as of 2026
ProductH2International Energy Agency · as of 2026
Capacity40 MWInternational Energy Agency · as of 2026

Capacity values retain their recorded units and scope. MW, kt H₂/y and Nm³ H₂/h are different measures; this page does not convert or add them without a shared operating basis.

Details

Technology & product

ComponentsElectrolyser (PEM)Plug Power Inc.
Project Typehydrogen production facilityPlug Power Inc.

Capacity & economics

Total Capex84,000,000 USDPlug Power Inc.

Status & timeline

Date online (tracker field)2024 (meaning under review)International Energy Agency · as of 2026

Location & names

Site NameCamden County Industrial Park, KingslandPlug Power Inc.
AliasCamden County green hydrogen plant; Woodbine, Georgia production plantPlug Power Inc.
Official NamePeachtree Green Hydrogen Plant; Plug Power's Georgia Hydrogen PlantPlug Power Inc.

Additional project information

Administrative AreaCamden County,Georgia, USAInternational Energy Agency · as of 2026
CountryUnited StatesInternational Energy Agency · as of 2026
Progress StatusOperationalInternational Energy Agency · as of 2026
Capacity (Nm³ H₂/h)7,692 Nm³ H₂/hInternational Energy Agency · as of 2026
Capacity (Announced Size)40 Mwel -15 t H2/d productionInternational Energy Agency · as of 2026
Capacity (kt H2/y)6 kt H2/yInternational Energy Agency · as of 2026

Timeline

  1. Announcement : 2021-06-10Plug Power Inc.
  2. Commercial operation : 2024-01Plug Power Inc.

Sources & record history

Sources

Field sources

Shared date, confidence and value status appear once with their source above; a dash in the table refers to that source context.

FieldShown valueOriginal valueSourceDate basisMeaning
NameCamden County (GA), green power plant
View exact valueCamden County (GA), green power plant
IEA Hydrogen Projects dataset——
Site NameCamden County Industrial Park, Kingsland
View exact valueCamden County Industrial Park, Kingsland
Plug Power Inc. (https://www.ir.plugpower.com/press-releases/news-details/2021/Plug-Power-Announces-Green-Hydrogen-Plant-in-Camden-County-Georgia-2021-6-10/); Plug Power Inc. (https://www.ir.plugpower.com/press-releases/news-details/2024/Plug-Power-Starts-Production-of-Liquid-Green-Hydrogen-at-its-Georgia-Plant/default.aspx); Plug Power Inc., filed with U.S. SEC (https://www.sec.gov/Archives/edgar/data/1093691/000110465923070999/tm2318675d1_ex99-1.htm); H2Prism earlier record (SRC-C-P200); H2Prism earlier record (SRC-C-P200)Older value
Administrative AreaUS-GA Georgia
View exact valueUS-GA Georgia
Plug Power Inc. (https://www.ir.plugpower.com/press-releases/news-details/2021/Plug-Power-Announces-Green-Hydrogen-Plant-in-Camden-County-Georgia-2021-6-10/); Plug Power Inc. (https://www.ir.plugpower.com/press-releases/news-details/2024/Plug-Power-Starts-Production-of-Liquid-Green-Hydrogen-at-its-Georgia-Plant/default.aspx); Plug Power Inc., filed with U.S. SEC (https://www.sec.gov/Archives/edgar/data/1093691/000110465923070999/tm2318675d1_ex99-1.htm); H2Prism earlier record (SRC-C-P200); H2Prism earlier record (SRC-C-P200)Older value
AliasCamden County green hydrogen plant; Woodbine, Georgia production plant
View exact value[{"kind":"source_label","name":"Camden County green hydrogen plant"},{"kind":"source_label","name":"Woodbine, Georgia production plant"}]
Plug Power Inc. (https://www.ir.plugpower.com/press-releases/news-details/2021/Plug-Power-Announces-Green-Hydrogen-Plant-in-Camden-County-Georgia-2021-6-10/); Plug Power Inc. (https://www.ir.plugpower.com/press-releases/news-details/2024/Plug-Power-Starts-Production-of-Liquid-Green-Hydrogen-at-its-Georgia-Plant/default.aspx); Plug Power Inc., filed with U.S. SEC (https://www.sec.gov/Archives/edgar/data/1093691/000110465923070999/tm2318675d1_ex99-1.htm); H2Prism earlier record (SRC-C-P200); H2Prism earlier record (SRC-C-P200)Older value
CountryUnited States
View exact valueUSA
Plug Power Inc. (https://www.ir.plugpower.com/press-releases/news-details/2021/Plug-Power-Announces-Green-Hydrogen-Plant-in-Camden-County-Georgia-2021-6-10/); Plug Power Inc. (https://www.ir.plugpower.com/press-releases/news-details/2024/Plug-Power-Starts-Production-of-Liquid-Green-Hydrogen-at-its-Georgia-Plant/default.aspx); Plug Power Inc., filed with U.S. SEC (https://www.sec.gov/Archives/edgar/data/1093691/000110465923070999/tm2318675d1_ex99-1.htm); H2Prism earlier record (SRC-C-P200); H2Prism earlier record (SRC-C-P200)Older value
Official NamePeachtree Green Hydrogen Plant; Plug Power's Georgia Hydrogen Plant
View exact value[{"lang":"en","name":"Peachtree Green Hydrogen Plant","evidence":["E-05"]},{"lang":"en","name":"Plug Power's Georgia Hydrogen Plant","evidence":["E-04"]}]
Plug Power Inc. (https://www.ir.plugpower.com/press-releases/news-details/2021/Plug-Power-Announces-Green-Hydrogen-Plant-in-Camden-County-Georgia-2021-6-10/); Plug Power Inc. (https://www.ir.plugpower.com/press-releases/news-details/2024/Plug-Power-Starts-Production-of-Liquid-Green-Hydrogen-at-its-Georgia-Plant/default.aspx); Plug Power Inc., filed with U.S. SEC (https://www.sec.gov/Archives/edgar/data/1093691/000110465923070999/tm2318675d1_ex99-1.htm); H2Prism earlier record (SRC-C-P200); H2Prism earlier record (SRC-C-P200)Older value
ComponentsElectrolyser (PEM)
View exact value{"kind":"전해조","tech":"PEM","tech_raw":"PEM electrolyzers","component_id":"CMP-1"}
Plug Power Inc. (https://www.ir.plugpower.com/press-releases/news-details/2021/Plug-Power-Announces-Green-Hydrogen-Plant-in-Camden-County-Georgia-2021-6-10/); Plug Power Inc. (https://www.ir.plugpower.com/press-releases/news-details/2024/Plug-Power-Starts-Production-of-Liquid-Green-Hydrogen-at-its-Georgia-Plant/default.aspx); Plug Power Inc., filed with U.S. SEC (https://www.sec.gov/Archives/edgar/data/1093691/000110465923070999/tm2318675d1_ex99-1.htm); H2Prism earlier record (SRC-C-P200); H2Prism earlier record (SRC-C-P200)Older value
ProductH2
View exact valueH2
IEA Hydrogen Projects dataset——
Project Typehydrogen production facility
View exact valuehydrogen_production_facility
Plug Power Inc. (https://www.ir.plugpower.com/press-releases/news-details/2021/Plug-Power-Announces-Green-Hydrogen-Plant-in-Camden-County-Georgia-2021-6-10/); Plug Power Inc. (https://www.ir.plugpower.com/press-releases/news-details/2024/Plug-Power-Starts-Production-of-Liquid-Green-Hydrogen-at-its-Georgia-Plant/default.aspx); Plug Power Inc., filed with U.S. SEC (https://www.sec.gov/Archives/edgar/data/1093691/000110465923070999/tm2318675d1_ex99-1.htm); H2Prism earlier record (SRC-C-P200); H2Prism earlier record (SRC-C-P200)Older value
TechnologyPEM
View exact valuePEM
IEA Hydrogen Projects dataset——
Capacity40 MW
View exact value40 MW
IEA Hydrogen Projects dataset——
Total Capex84,000,000 USD
View exact value{"number":84000000,"currency":"USD","raw_text":"Plug Power is investing $84 million in the facility"}
Plug Power Inc. (https://www.ir.plugpower.com/press-releases/news-details/2021/Plug-Power-Announces-Green-Hydrogen-Plant-in-Camden-County-Georgia-2021-6-10/); H2Prism earlier record (SRC-C-P200); H2Prism earlier record (SRC-C-P200)Older value
EventAnnouncement : 2021-06-10
View exact value{"date":"2021-06-10","tags":{"as_of":"2021-06-10","source":"Plug Power Inc.","evidence":["E-01"],"judged_by":"transcription","confidence":"high","accessed_at":"2026-08-18T02:52:00+09:00"},"ev_type":"EV-01","event_id":"V-01","raw_date_text":"today announced plans to build a green hydrogen production plant in Camden County, Georgia","date_precision":"day"}
Plug Power Inc. (https://www.ir.plugpower.com/press-releases/news-details/2021/Plug-Power-Announces-Green-Hydrogen-Plant-in-Camden-County-Georgia-2021-6-10/); H2Prism earlier record (SRC-C-P200); H2Prism earlier record (SRC-C-P200)Older value
EventCommercial operation : 2024-01
View exact value{"date":"2024-01","tags":{"as_of":"2025-05-29","source":"Plug Power Inc.","evidence":["E-04"],"judged_by":"worker_review","confidence":"high","accessed_at":"2026-08-18T02:52:00+09:00"},"ev_type":"EV-13","event_id":"V-02","raw_date_text":"The plant, which opened in January 2024 ... It’s commercial hydrogen production","date_precision":"month"}
Plug Power Inc. (https://www.ir.plugpower.com/press-releases/news-details/2025/Plug-Powers-Georgia-Hydrogen-Plant-Sets-U-S--Production-Record-Using-Plug-Electrolyzer-Technology/default.aspx); H2Prism earlier record (SRC-C-P200); H2Prism earlier record (SRC-C-P200)Older value
EventDate online : 2024
View exact value{"date":"2024","date_precision":"year","event":"Date online","basis":"iea_hydrogen_projects_raw.csv"}
IEA Hydrogen Projects dataset——
Progress StatusOperational
View exact valueOperational
H2Prism earlier record (SRC-S3); H2Prism earlier record (SRC-S3)Older value
Administrative AreaCamden County,Georgia, USA
View exact valueCamden County,Georgia, USA
IEA Hydrogen Projects dataset——
CountryUnited States
View exact valueUnited States
IEA Hydrogen Projects dataset——
Progress StatusOperational
View exact valueOperational
IEA Hydrogen Projects dataset——
Capacity (Nm³ H₂/h)7,692 Nm³ H₂/h
View exact value7692.307692307692 Nm³ H₂/h
IEA Hydrogen Projects dataset——
Capacity (Announced Size)40 Mwel -15 t H2/d production
View exact value40 Mwel -15 t H2/d production
IEA Hydrogen Projects dataset——
Capacity (kt H2/y)6 kt H2/y
View exact value5.997230769230769 kt H2/y
IEA Hydrogen Projects dataset——

Record history

0 current sourced values · 15 older values · Record updated

H2Prism separates published values from estimates. Check the linked source before you use a value. · Back to Hydrogen projects

Records are compiled with AI assistance. Original source links are shown when available.