H2PrismHydrogen intelligenceSubscribe

CIPP (Ceara’s Pecem Industrial Port Complex) Hydrogen project

6,926 MW · Electrolysis · Brazil

Concept

Brazil Map: Natural Earth
Capacity
6,926 MW
Target operation
2027
Technology
Electrolysis
Country
Brazil
Development stage
Concept

Target operation

2027Target operation
  1. 2025
  2. 2026
  3. 2027
  4. 2028
  5. 2029

Target year as recorded for this project. The axis does not imply stage history.

Country scale

#2 by recorded MW among 50 projects with capacity recorded in this country.

  1. Green Energy Park (GEP) phases I to VI16,161 MW
  2. CIPP (Ceara’s Pecem Industrial Port Complex) Hydrogen project6,926 MW
  3. Green H2 plant In Port of Pecem4,618 MW

All stages are included. Capacity does not describe current production.

Project details

Production capacity
1,200 ktpa
Site
Pecem Industrial and Port Complex
Sources (3)
  • IEA Hydrogen Production Projects 2026

    International Energy Agency

    Original value: 2027 (Schedule question: Date online)

    Original value: 1.2 Mt H2/y, capacity (Announced Size)

    Original value: Concept

    Original value: Capacity (MWel): 6926.273664768354

    Original value: Hydrogen (Product: Hydrogen)

    Original value: 1539171.9255040789 (Capacity (Nm³ H₂/h))

    Original value: Water electrolysis (Technology: Water electrolysis)

  • IEA Hydrogen Production Projects 2026 (preserved CSV edition, received 2026-10-24)

    International Energy Agency · As of 2026-06-18

    Original value: 6,926.273664768354 MW

    Original value: 1,200 kt H2/y (Product: Hydrogen)

    Original value: Pecem Industrial and Port Complex (Site: Pecem Industrial and Port Complex)

    Original value: 2027

    Original value: Concept

    Original value: Hydrogen (Product: Hydrogen)

    Published value: 6,926 MW

  • International Energy Agency

    International Energy Agency

    Original value: Hydrogen (Product: Hydrogen)

    Original value: 1539171.9255040789 (Capacity (Nm³ H₂/h))

    Original value: Water electrolysis (Technology: Water electrolysis)

Projects in Brazil

Major projects: operating and FID first, then by recorded capacity.

All projects in this country