Wind to Gas Sudermarsch
Wind to Gas Sudermarsch is a hydrogen project in Germany using PEM electrolysis; recorded capacity: 2.4 megawatt PEM Power-to-Gas system.
Overview
StatusConceptEuropean Clean Hydrogen Partnership · as of 2025
Country · regionGermany
TechnologyPEM electrolysis
Producthydrogen
Capacity2.4 megawatt PEM Power-to-Gas system
Capacity values retain their recorded units and scope. MW, kt H₂/y and Nm³ H₂/h are different measures; this page does not convert or add them without a shared operating basis.
Details
Technology & product
Componentsfive wind energy turbines, electrolysis plant, hydrogen pipeline/grid injection, adjacent hydrogen filling station, battery storage
Final Useinjection into local natural-gas network; supply to adjacent hydrogen filling station until end of 2024
Power Sourceexcess wind power
Power Source Detailexcess electricity from five wind energy turbines
Project TypePower-to-Gas system for hydrogen production
Location & names
Site NameWind-to-Gas-Park
Timeline
No recorded project events.
Sources & record history
Sources
- Kraftwerke Mainz-Wiesbaden AG (KMW) Aus Wind wird Wasserstoff: Der Wind-to-Gas-Park von KMW Shared by 7 fields: Current
- Hydrogenics Corporation Hydrogenics Awarded 2.4 MW Power-to-Gas Plant in Germany (Exhibit 99.1) Shared by 4 fields: Current
- European Clean Hydrogen Partnership European Hydrogen Observatory projects Dec2025
Field sources
Shared date, confidence and value status appear once with their source above; a dash in the table refers to that source context.
| Field | Shown value | Original value | Source | Date basis | Meaning |
|---|---|---|---|---|---|
| Name | Wind to Gas Sudermarsch | View exact valueWind to Gas Sudermarsch | Aus Wind wird Wasserstoff: Der Wind-to-Gas-Park von KMW | — | |
| Site Name | Wind-to-Gas-Park | View exact valueWind-to-Gas-Park | Aus Wind wird Wasserstoff: Der Wind-to-Gas-Park von KMW | — | |
| Country | Germany | View exact valueGermany | Hydrogenics Awarded 2.4 MW Power-to-Gas Plant in Germany (Exhibit 99.1) | — | |
| Components | five wind energy turbines, electrolysis plant, hydrogen pipeline/grid injection, adjacent hydrogen filling station, battery storage | View exact value["five wind energy turbines","electrolysis plant","hydrogen pipeline/grid injection","adjacent hydrogen filling station","battery storage"] | Aus Wind wird Wasserstoff: Der Wind-to-Gas-Park von KMW | — | |
| Final Use | injection into local natural-gas network; supply to adjacent hydrogen filling station until end of 2024 | View exact valueinjection into local natural-gas network; supply to adjacent hydrogen filling station until end of 2024 | Aus Wind wird Wasserstoff: Der Wind-to-Gas-Park von KMW | — | |
| Power Source | excess wind power | View exact valueexcess wind power | Aus Wind wird Wasserstoff: Der Wind-to-Gas-Park von KMW | — | |
| Power Source Detail | excess electricity from five wind energy turbines | View exact valueexcess electricity from five wind energy turbines | Aus Wind wird Wasserstoff: Der Wind-to-Gas-Park von KMW | — | |
| Product | hydrogen | View exact valuehydrogen | Aus Wind wird Wasserstoff: Der Wind-to-Gas-Park von KMW | — | |
| Project Type | Power-to-Gas system for hydrogen production | View exact valuePower-to-Gas system for hydrogen production | Hydrogenics Awarded 2.4 MW Power-to-Gas Plant in Germany (Exhibit 99.1) | — | |
| Technology | PEM electrolysis | View exact valuePEM electrolysis | Hydrogenics Awarded 2.4 MW Power-to-Gas Plant in Germany (Exhibit 99.1) | — | |
| Capacity | 2.4 megawatt PEM Power-to-Gas system | View exact value2.4 megawatt PEM Power-to-Gas system | Hydrogenics Awarded 2.4 MW Power-to-Gas Plant in Germany (Exhibit 99.1) | — | |
| Progress Status | Concept | View exact valueannounced_or_planned | European Hydrogen Observatory projects Dec2025 Confidence: reported | Snapshot 2025-12-01 | Older value (2025) |
Record history
10 current sourced values · 1 older value · Record updated