- Capacity
- —
- Target operation
- —
- Technology
- Electrolysis
- Country
- Netherlands
- Development stage
- FID / Construction
- Connected companies
- 1
Project details
- Product
- Hydrogen
- Construction target
- december 2020
Sources (5)
- IEA Hydrogen Production Projects 2026
International Energy Agency
Original value: Water electrolysis (Technology: Water electrolysis)
Original value: Hydrogen (Product: Hydrogen)
- International Energy Agency
International Energy Agency
Original value: Water electrolysis (Technology: Water electrolysis)
- Arcadis, Hoogeveen and LiveFree realise first hydrogen neighbourhood
Arcadis
Original value: planned construction; start scheduled for December 2020
Original value: planned
Original value: december 2020
Original value: Intussen worden de huizen verkocht aan geïnteresseerde partijen en dan begint de bouw in december 2020.
English rendering: Meanwhile the houses are being sold to interested parties, and then construction begins in December 2020.
- IEA Hydrogen Production Projects 2026 (preserved CSV edition, received 2026-10-24)
International Energy Agency · As of 2026-06-18
Original value: Heat (End use: Heat · Product: Hydrogen)
Original value: Hydrogen (Product: Hydrogen)
Original value: FID / Construction
- Arcadis
Arcadis
Original value: planned construction; start scheduled for December 2020
Original value: planned
Original value: december 2020
Original value: Intussen worden de huizen verkocht aan geïnteresseerde partijen en dan begint de bouw in december 2020.
English rendering: Meanwhile the houses are being sold to interested parties, and then construction begins in December 2020.
Companies and roles
| Company | Role in project |
|---|---|
| LiveFree | Developer |
Sources (1)
- Risk-assessment en bouw- en woonrijp maken in Hoogeveen | Arcadis
Arcadis
Original value: Developer
Sources (2)
- Arcadis
Arcadis
Original value: Location
- Arcadis, Hoogeveen and LiveFree realise first hydrogen neighbourhood
Arcadis
Original value: Location
Projects in Netherlands
Major projects: operating and FID first, then by recorded capacity.