Overview
StatusFeasibilityInternational Energy Agency · as of 2026
Country · regionNetherlandsInternational Energy Agency · as of 2026
TechnologyPEMInternational Energy Agency · as of 2026
ProductH2International Energy Agency · as of 2026
Capacity200 MWInternational Energy Agency · as of 2026
Capacity values retain their recorded units and scope. MW, kt H₂/y and Nm³ H₂/h are different measures; this page does not convert or add them without a shared operating basis.
Details
Capacity & economics
FinancingIn the summer of 2025, Uniper was awarded a €297 million grant for the first phase
Status & timeline
Date online (tracker field)2028 (meaning under review)International Energy Agency · as of 2026
Additional project information
Administrative AreaMaasvlakte Benelux Power PlantInternational Energy Agency · as of 2026
Capacity (kt H2/y)30 kt H2/yInternational Energy Agency · as of 2026
Capacity (Announced Size)200 MWInternational Energy Agency · as of 2026
Capacity (Nm³ H₂/h)38,462 Nm³ H₂/hInternational Energy Agency · as of 2026
Timeline
No recorded project events.
Sources & record history
Sources
- IEA Hydrogen Projects dataset Shared by 11 fields: Snapshot 2026-06-18 · Confidence: reported · Older value (2026)
- Gasunie (quotes Uniper hydrogen lead Martijn Overgaag) Hydrogen pipeline crucial to industrial energy transition in port of Rotterdam
Field sources
Shared date, confidence and value status appear once with their source above; a dash in the table refers to that source context.
| Field | Shown value | Original value | Source | Date basis | Meaning |
|---|---|---|---|---|---|
| Name | Uniper H2Maasvlakte, phase I | View exact valueUniper H2Maasvlakte, phase I | IEA Hydrogen Projects dataset | — | — |
| Country | Netherlands | View exact valueNetherlands | IEA Hydrogen Projects dataset | — | — |
| Product | H2 | View exact valueH2 | IEA Hydrogen Projects dataset | — | — |
| Technology | PEM | View exact valuePEM | IEA Hydrogen Projects dataset | — | — |
| Capacity | 200 MW | View exact value200 MW | IEA Hydrogen Projects dataset | — | — |
| Financing | In the summer of 2025, Uniper was awarded a €297 million grant for the first phase | View exact valueIn the summer of 2025, Uniper was awarded a €297 million grant for the first phase | Hydrogen pipeline crucial to industrial energy transition in port of Rotterdam | Current | |
| Event | Date online : 2028 | View exact value{"date":"2028","date_precision":"year","event":"Date online","basis":"iea_hydrogen_projects_raw.csv"} | IEA Hydrogen Projects dataset | — | — |
| Progress Status | Feasibility | View exact valueFeasibility study | IEA Hydrogen Projects dataset | — | — |
| Administrative Area | Maasvlakte Benelux Power Plant | View exact valueMaasvlakte Benelux Power Plant | IEA Hydrogen Projects dataset | — | — |
| Capacity (kt H2/y) | 30 kt H2/y | View exact value29.986153846153844 kt H2/y | IEA Hydrogen Projects dataset | — | — |
| Capacity (Announced Size) | 200 MW | View exact value200 MW | IEA Hydrogen Projects dataset | — | — |
| Capacity (Nm³ H₂/h) | 38,462 Nm³ H₂/h | View exact value38461.53846153846 Nm³ H₂/h | IEA Hydrogen Projects dataset | — | — |
Record history
1 current sourced value · 6 older values · Record updated