H2PrismHydrogen intelligenceSubscribe

TPJ Jesenice

0.35 MW · Electrolysis · Slovenia

Operational

Slovenia Map: Natural Earth
Capacity
0.35 MW
Target operation
—
Technology
Electrolysis
Country
Slovenia
Development stage
Operational

Country scale

#2 by recorded MW among 4 projects with capacity recorded in this country.

  1. Zero Emission Mobility Corridor34 MW
  2. TPJ Jesenice0.35 MW
  3. Steklarna Hrastnik glass manufacturing plant0.15 MW

All stages are included. Capacity does not describe current production.

Project details

Operation start
2000
Production capacity
0.06 ktpa
Sources (3)
  • IEA Hydrogen Production Projects 2026

    International Energy Agency

    Original value: Water electrolysis (Technology: Water electrolysis)

    Original value: 77.77777777777779 (Capacity (Nm³ H₂/h))

    Original value: Hydrogen (Product: Hydrogen)

    Original value: Operational

    Original value: 0.35 MWel

    Original value: 2000

    Original value: 0.35MW (Announced Size)

  • International Energy Agency

    International Energy Agency

    Original value: Water electrolysis (Technology: Water electrolysis)

    Original value: 77.77777777777779 (Capacity (Nm³ H₂/h))

    Original value: Hydrogen (Product: Hydrogen)

    Original value: 2000

  • IEA Hydrogen Production Projects 2026 (preserved CSV edition, received 2026-10-24)

    International Energy Agency · As of 2026-06-18

    Original value: 0.35 MW

    Original value: Operational

    Original value: 0.060638666666666674 kt H2/y (Product: Hydrogen)

    Original value: Hydrogen (Product: Hydrogen)

    Published value: 0.06064 kt H2/y

Projects in Slovenia

Major projects: operating and FID first, then by recorded capacity.

All projects in this country