Tent Mountain
Overview
StatusDormantInternational Energy Agency · as of 2026
Country · regionCanadaInternational Energy Agency · as of 2026
TechnologyOther ElectrolysisInternational Energy Agency · as of 2026
ProductH2International Energy Agency · as of 2026
Capacity100 MW planned green hydrogen electrolyser (2022 annual report)
Capacity values retain their recorded units and scope. MW, kt H₂/y and Nm³ H₂/h are different measures; this page does not convert or add them without a shared operating basis. “Other Electrolysis” and “Unknown PtX” are recorded classifications, not a specific electrolyzer design or power-to-X route.
Details
Technology & product
Configuration DetailUnknown PtXInternational Energy Agency · as of 2026
Additional project information
Administrative AreaTent mountainInternational Energy Agency · as of 2026
Capacity (MWel)80.8 MWelInternational Energy Agency · as of 2026
Capacity (Nm³ H₂/h)17,957 Nm³ H₂/hInternational Energy Agency · as of 2026
Capacity (Announced Size)14 kt H2/yInternational Energy Agency · as of 2026
Capacity (kt H2/y)14 kt H2/yInternational Energy Agency · as of 2026
Timeline
No recorded project events.
Sources & record history
Sources
- IEA Hydrogen Projects dataset Shared by 11 fields: Snapshot 2026-06-18 · Confidence: reported · Older value (2026)
- Montem Resources Limited Montem Resources Limited Annual Report for year ended 31 December 2021 · 2022-03-29
Field sources
Shared date, confidence and value status appear once with their source above; a dash in the table refers to that source context.
| Field | Shown value | Original value | Source | Date basis | Meaning |
|---|---|---|---|---|---|
| Name | Tent Mountain | View exact valueTent Mountain | IEA Hydrogen Projects dataset | — | — |
| Country | Canada | View exact valueCanada | IEA Hydrogen Projects dataset | — | — |
| Configuration Detail | Unknown PtX | View exact valueUnknown PtX | IEA Hydrogen Projects dataset | — | — |
| Product | H2 | View exact valueH2 | IEA Hydrogen Projects dataset | — | — |
| Technology | Other Electrolysis | View exact valueOther Electrolysis | IEA Hydrogen Projects dataset | — | — |
| Capacity | 100 MW planned green hydrogen electrolyser (2022 annual report) | View exact value100 MW planned green hydrogen electrolyser (2022 annual report) | Montem Resources Limited Annual Report for year ended 31 December 2021 | Source dated 2022-03-29 | Current |
| Progress Status | Dormant | View exact valueDormant | IEA Hydrogen Projects dataset | — | — |
| Administrative Area | Tent mountain | View exact valueTent mountain | IEA Hydrogen Projects dataset | — | — |
| Capacity (MWel) | 80.8 MWel | View exact value80.80652608896413 MWel | IEA Hydrogen Projects dataset | — | — |
| Capacity (Nm³ H₂/h) | 17,957 Nm³ H₂/h | View exact value17957.005797547587 Nm³ H₂/h | IEA Hydrogen Projects dataset | — | — |
| Capacity (Announced Size) | 14 kt H2/y | View exact value14 kt H2/y | IEA Hydrogen Projects dataset | — | — |
| Capacity (kt H2/y) | 14 kt H2/y | View exact value14 kt H2/y | IEA Hydrogen Projects dataset | — | — |
Record history
1 current sourced value · 5 older values · Record updated