Solatio H2V Piauí
Electrolysis · Brazil
- Capacity
- —
- Target operation
- second half of 2029
- Technology
- Water electrolysis
- Country
- Brazil
- Development stage
- —
Project details
- Permit date
- 14/11/2027
- Product
- Ammonia · Hydrogen
- Interruption
- halted the works as soon as it was notified and went further, administratively cancelling its own environmental license
- Site
- Parnaíba Export Processing Zone
Sources (8)
- Official Gazette of the State of Piaui no. 224/2024
Piauí Official Gazette; applicant notice
Original value: 14/11/2027 (Permit: PI-LP.05695-1/2023 · Target actual: actual)
- Government of Piauí
Government of Piauí
Original value: segundo semestre de 2029 (Operation event: entre em operação no segundo semestre de 2029)
Original value: Early site clearing reported; subsequent status unresolved
English rendering: second half of 2029
- With construction underway, world's largest green hydrogen plant positions Piaui as leader of the energy transition
Government of Piauí · As of 2025-06-09
Original value: segundo semestre de 2029 (Operation event: entre em operação no segundo semestre de 2029)
Original value: Early site clearing reported; subsequent status unresolved
English rendering: second half of 2029
- Solatio H2V Piauí Environmental Impact Report
Solatio H2V Piauí / SEMARH Piauí
Original value: Water electrolysis (Technology: Water electrolysis)
Original value: Ammonia (Product: Ammonia)
Original value: Hydrogen (Product: Hydrogen)
Original value: eletrolisador de 2.700 MW (2.700 MW)
Original value: Parnaíba Export Processing Zone (Site: Parnaíba Export Processing Zone)
English rendering: 2,700 MW electrolyzer
- Solatio H2V Piauí / SEMARH Piauí
Solatio H2V Piauí / SEMARH Piauí
Original value: Water electrolysis (Technology: Water electrolysis)
Original value: Ammonia (Product: Ammonia)
Original value: Hydrogen (Product: Hydrogen)
Original value: Parnaíba Export Processing Zone (Site: Parnaíba Export Processing Zone)
- With construction underway, world's largest green hydrogen plant positions Piaui as leader of the energy transition
Government of Piauí
Original value: supressão vegetal e limpeza de 154 hectares
English rendering: vegetation removal and clearing of 154 hectares
- Portal O Dia
Portal O Dia
Original value: paralisou as obras assim que foi intimada e foi além, cancelando administrativamente a própria licença ambiental
English rendering: halted the works as soon as it was notified and went further, administratively cancelling its own environmental license
- Green Hydrogen: Solatio cancels licenses and abandons the project in Piaui
Portal O Dia · As of 2026-02-05
Original value: paralisou as obras assim que foi intimada e foi além, cancelando administrativamente a própria licença ambiental
English rendering: halted the works as soon as it was notified and went further, administratively cancelling its own environmental license
Sources (2)
- Official Gazette of the State of Piaui no. 224/2024
Piauí Official Gazette; applicant notice · As of 2024-11-18
Original value: Location
- Piauí Official Gazette; applicant notice
Piauí Official Gazette; applicant notice
Original value: Location
Projects in Brazil
Major projects: operating and FID first, then by recorded capacity.