H2PrismHydrogen intelligenceSubscribe

Solatio H2V Piauí

Electrolysis · Brazil

Brazil Map: Natural Earth
Capacity
—
Target operation
second half of 2029
Technology
Water electrolysis
Country
Brazil
Development stage
—

Project details

Permit date
14/11/2027
Product
Ammonia · Hydrogen
Interruption
halted the works as soon as it was notified and went further, administratively cancelling its own environmental license
Site
Parnaíba Export Processing Zone
Sources (8)
  • Official Gazette of the State of Piaui no. 224/2024

    Piauí Official Gazette; applicant notice

    Original value: 14/11/2027 (Permit: PI-LP.05695-1/2023 · Target actual: actual)

  • Government of Piauí

    Government of Piauí

    Original value: segundo semestre de 2029 (Operation event: entre em operação no segundo semestre de 2029)

    Original value: Early site clearing reported; subsequent status unresolved

    English rendering: second half of 2029

  • With construction underway, world's largest green hydrogen plant positions Piaui as leader of the energy transition

    Government of Piauí · As of 2025-06-09

    Original value: segundo semestre de 2029 (Operation event: entre em operação no segundo semestre de 2029)

    Original value: Early site clearing reported; subsequent status unresolved

    English rendering: second half of 2029

  • Solatio H2V Piauí Environmental Impact Report

    Solatio H2V Piauí / SEMARH Piauí

    Original value: Water electrolysis (Technology: Water electrolysis)

    Original value: Ammonia (Product: Ammonia)

    Original value: Hydrogen (Product: Hydrogen)

    Original value: eletrolisador de 2.700 MW (2.700 MW)

    Original value: Parnaíba Export Processing Zone (Site: Parnaíba Export Processing Zone)

    English rendering: 2,700 MW electrolyzer

  • Solatio H2V Piauí / SEMARH Piauí

    Solatio H2V Piauí / SEMARH Piauí

    Original value: Water electrolysis (Technology: Water electrolysis)

    Original value: Ammonia (Product: Ammonia)

    Original value: Hydrogen (Product: Hydrogen)

    Original value: Parnaíba Export Processing Zone (Site: Parnaíba Export Processing Zone)

  • With construction underway, world's largest green hydrogen plant positions Piaui as leader of the energy transition

    Government of Piauí

    Original value: supressão vegetal e limpeza de 154 hectares

    English rendering: vegetation removal and clearing of 154 hectares

  • Portal O Dia

    Portal O Dia

    Original value: paralisou as obras assim que foi intimada e foi além, cancelando administrativamente a própria licença ambiental

    English rendering: halted the works as soon as it was notified and went further, administratively cancelling its own environmental license

  • Green Hydrogen: Solatio cancels licenses and abandons the project in Piaui

    Portal O Dia · As of 2026-02-05

    Original value: paralisou as obras assim que foi intimada e foi além, cancelando administrativamente a própria licença ambiental

    English rendering: halted the works as soon as it was notified and went further, administratively cancelling its own environmental license

Projects in Brazil

Major projects: operating and FID first, then by recorded capacity.

All projects in this country