H2Prism
Hydrogen calculators & data

Pioneer 2

South Wales

Pioneer 2 is a hydrogen project using PEM electrolysis; recorded capacity: 2.5 (unit not recorded).

Overview

StatusConceptEuropean Clean Hydrogen Partnership · as of 2025
Country · regionSouth Wales
TechnologyPEM electrolysis
Productgreen hydrogen
Capacity2.5 (unit not recorded)

Capacity values retain their recorded units and scope. MW, kt H₂/y and Nm³ H₂/h are different measures; this page does not convert or add them without a shared operating basis.

Details

Technology & product

Components2.5 MWe Nel PEM electrolyser, compression and dispensing systems, containerised system
Power Sourceon-site renewable power
Project Typegreen hydrogen production facility

Capacity & economics

Production Volume1 (unit not recorded)

Status & timeline

Lifecycle Stageoperational

Timeline

  1. first gas : 2026-05-05

Sources & record history

Sources

Field sources

Shared date, confidence and value status appear once with their source above; a dash in the table refers to that source context.

FieldShown valueOriginal valueSourceDate basisMeaning
NamePioneer 2
View exact valuePioneer 2
Pioneer 2 Green Hydrogen Project | Green Hydrogen Gas - Protium—
Administrative AreaSouth Wales
View exact valueSouth Wales
Protium Construction Update: Pioneer 2 Green Hydrogen Facility—
Components2.5 MWe Nel PEM electrolyser, compression and dispensing systems, containerised system
View exact value["2.5 MWe Nel PEM electrolyser","compression and dispensing systems","containerised system"]
Protium begins construction of second green hydrogen facility in South Wales—
Power Sourceon-site renewable power
View exact valueon-site renewable power
Pioneer 2 Green Hydrogen Project | Green Hydrogen Gas - Protium—
Productgreen hydrogen
View exact valuegreen hydrogen
Pioneer 2 Green Hydrogen Project | Green Hydrogen Gas - Protium—
Project Typegreen hydrogen production facility
View exact valuegreen hydrogen production facility
Protium begins construction of second green hydrogen facility in South Wales—
TechnologyPEM electrolysis
View exact valuePEM electrolysis
Protium Construction Update: Pioneer 2 Green Hydrogen Facility—
Capacity2.5 (unit not recorded)
View exact value2.5
Protium Construction Update: Pioneer 2 Green Hydrogen Facility—
Production Volume1 (unit not recorded)
View exact value1
Protium Construction Update: Pioneer 2 Green Hydrogen Facility—
Eventfirst gas : 2026-05-05
View exact value{"event":"first gas","event_date":"2026-05-05"}
Protium Construction Update: Pioneer 2 Green Hydrogen Facility—
Lifecycle Stageoperational
View exact valueoperational
Protium Construction Update: Pioneer 2 Green Hydrogen Facility—
Progress StatusConcept
View exact valueannounced_or_planned
European Hydrogen Observatory projects Dec2025 Confidence: reportedSnapshot 2025-12-01Older value (2025)

Record history

10 current sourced values · 1 older value · Record updated

H2Prism separates published values from estimates. Check the linked source before you use a value. · Back to Hydrogen projects

Records are compiled with AI assistance. Original source links are shown when available.