Projeto Hub de Hidrogênio Tramontina
Alkaline · Brazil
- Capacity
- —
- Target operation
- meados de 2027
- Technology
- Alkaline electrolyser
- Country
- Brazil
- Development stage
- —
Project details
- Product
- Hydrogen
- Status
- preliminary and installation licence
Sources (8)
- Revista Transforma 2026, Climate Change and Nature
Tramontina
Original value: meados de 2027 (Operation event: operation start)
- Tramontina
Tramontina
Original value: meados de 2027 (Operation event: operation start)
Original value: Alkaline electrolyser (Technology: Alkaline electrolyser)
- Government of Rio Grande do Sul
Government of Rio Grande do Sul
Original value: Hydrogen (Product: Hydrogen)
Original value: preliminary and installation licence
- Leite signs the contract and authorizes the start of works on Tramontina's pioneering green hydrogen project in Carlos Barbosa
Government of Rio Grande do Sul · As of 2025-12-12
Original value: Hydrogen (Product: Hydrogen)
Original value: preliminary and installation licence
- Hidrogênio Verde Tramontina
Tramontina
Original value: Alkaline electrolyser (Technology: Alkaline electrolyser)
- Tramontina green hydrogen project construction authorisation
Rio Grande do Sul State Government
Original value: Production (Function: Production)
- Leite signs the contract and authorizes the start of works on Tramontina's pioneering green hydrogen project in Carlos Barbosa
Government of Rio Grande do Sul
Original value: Carlos Barbosa (Site: Carlos Barbosa)
- Preliminary and Installation License for Alteration, LPIA No. 00533 / 2025
FEPAM
Original value: eletrolisador (capacidade de 260 Nm³/h) (260 Nm³/h)
English rendering: electrolyzer (capacity of 260 Nm3/h)
Sources (2)
- Leite signs the contract and authorizes the start of works on Tramontina's pioneering green hydrogen project in Carlos Barbosa
Government of Rio Grande do Sul · As of 2025-12-12
Original value: Location
- Government of Rio Grande do Sul
Government of Rio Grande do Sul
Original value: Location
Projects in Brazil
Major projects: operating and FID first, then by recorded capacity.