Power to Gas hydrogen-energy demonstration at Yuhigaoka Wind Farm “Furaibo”, Tomamae Town, Hokkaido
0.14 MW · Alkaline · Japan
Demo
- Capacity
- 0.14 MW
- Target operation
- —
- Technology
- Alkaline electrolyser
- Country
- Japan
- Development stage
- DEMO
Country scale
#11 by recorded MW among 29 projects with capacity recorded in this country.
- Hydrogen plant in Tomakomai100 MW
- Suntory Hakushu Distillery and Suntory Minami Alps Hakushu Water Plant16 MW
- Power to Gas hydrogen-energy demonstration at Yuhigaoka Wind Farm “Furaibo”, Tomamae Town, Hokkaido0.14 MW
All stages are included. Capacity does not describe current production.
Project details
- Announced size
- 0.135MW
- Scale
- Demonstration
Sources (4)
- IEA Hydrogen Production Projects 2026 (preserved CSV edition, received 2026-10-24)
International Energy Agency · As of 2026-06-18
Original value: CHP (Product: Hydrogen)
Original value: Demonstration
- IEA Hydrogen Production Projects 2026
International Energy Agency · As of 2026-06-18
Original value: DEMO
Original value: 0.135 MW
- IEA Hydrogen Production Projects 2026
International Energy Agency
Original value: Capacity (Nm³ H₂/h): 29.347826086956523 (Capacity (Nm³ H₂/h))
Original value: 0.135MW
Original value: DEMO
Original value: Alkaline electrolyser (Technology: Alkaline electrolyser)
Original value: Hydrogen (Product: Hydrogen)
Original value: Capacity (MWel): 0.135
Original value: Capacity (kt H2/y): 0.02288073913043478 (Capacity (kt H2/y))
Original value: 2017 (Schedule question: Date online)
- International Energy Agency
International Energy Agency
Original value: 0.135MW
Original value: DEMO
Original value: Alkaline electrolyser (Technology: Alkaline electrolyser)
Original value: Hydrogen (Product: Hydrogen)
Sources (2)
- International Energy Agency
International Energy Agency
Original value: Location
- A power-to-gas demonstration project is to start in Hokkaido: maximizing the potential of wind power with hydrogen
Toyota Tsusho Corporation
Original value: Location
Projects in Japan
Major projects: operating and FID first, then by recorded capacity.