H2Prism
Hydrogen calculators & data

Plant H2- Pico Truncado

Argentina · Santa Cruz Province, Argentina

Overview

Statusrestart initiative/agreement announced; current operation not established
Country · regionArgentina · Santa Cruz Province, Argentina
Technologywater electrolysis, wind-powered hydrogen production, alkaline electrolysis
Productpure hydrogen, oxygen
Capacity1 Nm 3 per hour hydrogen production capacity during the first phase

Capacity values retain their recorded units and scope. MW, kt H₂/y and Nm³ H₂/h are different measures; this page does not convert or add them without a shared operating basis. “Other Electrolysis” and “Unknown PtX” are recorded classifications, not a specific electrolyzer design or power-to-X route.

Details

Technology & product

Componentshydrogen generation room, high-pressure storage system, hydrogen utilization lab, hydrogen transportation workshop, hydrogen refuelling station
Configuration Detailwater electrolysis; compression; storage; piping; refuelling station
Feedstockwater
Final Usedevelopment and testing of utilization technologies, vehicle transport demonstration
Power Sourcewind electricity
Power Source Detailfour Enercon E-40 turbines; total installed capacity 2.4 MW
Project Groupjoint initiative involving Energía Argentina, Santa Cruz Province, and Pico Truncado municipality
Project Typeexperimental hydrogen demonstration plant

Status & timeline

Actual Utilizationmunicipal vehicles operated on hydrogen in 2010; activity paralyzed in 2015
Inactivity Signalhistorical inactivity signal; present signal not established
Lifecycle Stageexperimental plant; initiative to take it to semi-industrial scale
Operating Levelhistorical pilot/experimental operation; planned semi-industrial scale
Shutdownoperations paralyzed in 2015 after local government change
Suspension Characterreported paralysis associated with local government change
Eventconstruction began in 2003, first hydrogen obtained in January 2005, official inauguration in December 2005, operations paralyzed in 2015, restart agreement 2023-09-13

Location & names

Official NamePico Truncado Experimental Hydrogen Plant

Additional project information

Progress StatusConceptInternational Energy Agency · as of 2026
Configuration DetailUnknown PtXInternational Energy Agency · as of 2026
ProductH2International Energy Agency · as of 2026
TechnologyOther ElectrolysisInternational Energy Agency · as of 2026

Timeline

No recorded project events.

Sources & record history

Sources

Field sources

Shared date, confidence and value status appear once with their source above; a dash in the table refers to that source context.

FieldShown valueOriginal valueSourceDate basisMeaning
NamePlant H2- Pico Truncado
View exact valuePlant H2- Pico Truncado
Hidrogeno | AEAhidrogeno—
Administrative AreaSanta Cruz Province, Argentina
View exact valueSanta Cruz Province, Argentina
Hydrogen energy demonstration plant in Patagonia: Description and safety issues—
CountryArgentina
View exact valueArgentina
Ley 27038 — Ciudad de Pico Truncado, Capital Nacional del HidrógenoCurrent
Official NamePico Truncado Experimental Hydrogen Plant
View exact valuePico Truncado Experimental Hydrogen Plant
Hidrogeno | AEAhidrogeno—
Componentshydrogen generation room, high-pressure storage system, hydrogen utilization lab, hydrogen transportation workshop, hydrogen refuelling station
View exact value["hydrogen generation room","high-pressure storage system","hydrogen utilization lab","hydrogen transportation workshop","hydrogen refuelling station"]
Hydrogen energy demonstration plant in Patagonia: Description and safety issues—
Configuration Detailwater electrolysis; compression; storage; piping; refuelling station
View exact valuewater electrolysis; compression; storage; piping; refuelling station
Hydrogen energy demonstration plant in Patagonia: Description and safety issues—
Feedstockwater
View exact valuewater
Hydrogen energy demonstration plant in Patagonia: Description and safety issues—
Final Usedevelopment and testing of utilization technologies, vehicle transport demonstration
View exact value["development and testing of utilization technologies","vehicle transport demonstration"]
Hydrogen energy demonstration plant in Patagonia: Description and safety issues—
Power Sourcewind electricity
View exact valuewind electricity
Hydrogen energy demonstration plant in Patagonia: Description and safety issues—
Power Source Detailfour Enercon E-40 turbines; total installed capacity 2.4 MW
View exact valuefour Enercon E-40 turbines; total installed capacity 2.4 MW
Hydrogen energy demonstration plant in Patagonia: Description and safety issues—
Productpure hydrogen, oxygen
View exact value["pure hydrogen","oxygen"]
Hydrogen energy demonstration plant in Patagonia: Description and safety issues—
Project Groupjoint initiative involving Energía Argentina, Santa Cruz Province, and Pico Truncado municipality
View exact valuejoint initiative involving Energía Argentina, Santa Cruz Province, and Pico Truncado municipality
ACUERDO PARA PONER EN MARCHA LA PLANTA DE HIDRÓGENO DE PICO TRUNCADO—
Project Typeexperimental hydrogen demonstration plant
View exact valueexperimental hydrogen demonstration plant
Hydrogen energy demonstration plant in Patagonia: Description and safety issues—
Technologywater electrolysis, wind-powered hydrogen production, alkaline electrolysis
View exact value["water electrolysis","wind-powered hydrogen production","alkaline electrolysis"]
Hydrogen energy demonstration plant in Patagonia: Description and safety issues—
Capacity1 Nm 3 per hour hydrogen production capacity during the first phase
View exact value1 Nm 3 per hour hydrogen production capacity during the first phase
Hydrogen energy demonstration plant in Patagonia: Description and safety issues—
Actual Utilizationmunicipal vehicles operated on hydrogen in 2010; activity paralyzed in 2015
View exact valuemunicipal vehicles operated on hydrogen in 2010; activity paralyzed in 2015
ACUERDO PARA PONER EN MARCHA LA PLANTA DE HIDRÓGENO DE PICO TRUNCADO—
Eventconstruction began in 2003, first hydrogen obtained in January 2005, official inauguration in December 2005, operations paralyzed in 2015, restart agreement 2023-09-13
View exact value["construction began in 2003","first hydrogen obtained in January 2005","official inauguration in December 2005","operations paralyzed in 2015","restart agreement 2023-09-13"]
ACUERDO PARA PONER EN MARCHA LA PLANTA DE HIDRÓGENO DE PICO TRUNCADO—
Inactivity Signalhistorical inactivity signal; present signal not established
View exact valuehistorical inactivity signal; present signal not established
ACUERDO PARA PONER EN MARCHA LA PLANTA DE HIDRÓGENO DE PICO TRUNCADO—
Lifecycle Stageexperimental plant; initiative to take it to semi-industrial scale
View exact valueexperimental plant; initiative to take it to semi-industrial scale
ACUERDO PARA PONER EN MARCHA LA PLANTA DE HIDRÓGENO DE PICO TRUNCADO—
Operating Levelhistorical pilot/experimental operation; planned semi-industrial scale
View exact valuehistorical pilot/experimental operation; planned semi-industrial scale
ACUERDO PARA PONER EN MARCHA LA PLANTA DE HIDRÓGENO DE PICO TRUNCADO—
Progress Statusrestart initiative/agreement announced; current operation not established
View exact valuerestart initiative/agreement announced; current operation not established
ACUERDO PARA PONER EN MARCHA LA PLANTA DE HIDRÓGENO DE PICO TRUNCADO—
Shutdownoperations paralyzed in 2015 after local government change
View exact valueoperations paralyzed in 2015 after local government change
ACUERDO PARA PONER EN MARCHA LA PLANTA DE HIDRÓGENO DE PICO TRUNCADO—
Suspension Characterreported paralysis associated with local government change
View exact valuereported paralysis associated with local government change
ACUERDO PARA PONER EN MARCHA LA PLANTA DE HIDRÓGENO DE PICO TRUNCADO—
Progress StatusConcept
View exact valueConcept
IEA Hydrogen Projects dataset——
Configuration DetailUnknown PtX
View exact valueUnknown PtX
IEA Hydrogen Projects dataset——
ProductH2
View exact valueH2
IEA Hydrogen Projects dataset——
TechnologyOther Electrolysis
View exact valueOther Electrolysis
IEA Hydrogen Projects dataset——

Record history

22 current sourced values · 0 older values · Record updated

H2Prism separates published values from estimates. Check the linked source before you use a value. · Back to Hydrogen projects

Records are compiled with AI assistance. Original source links are shown when available.