H2Prism
Hydrogen calculators & data

P2X Europe - Nordic Electrofuel Porsgrunn project, phase 1

Norway

Overview

StatusFeasibilityInternational Energy Agency · as of 2026
Country · regionNorwayInternational Energy Agency · as of 2026
TechnologyOther ElectrolysisInternational Energy Agency · as of 2026
ProductSynfuelsInternational Energy Agency · as of 2026
Capacity58.1 MWInternational Energy Agency · as of 2026

Capacity values retain their recorded units and scope. MW, kt H₂/y and Nm³ H₂/h are different measures; this page does not convert or add them without a shared operating basis. “Other Electrolysis” and “Unknown PtX” are recorded classifications, not a specific electrolyzer design or power-to-X route.

Details

Technology & product

Configuration DetailUnknown PtXInternational Energy Agency · as of 2026

Status & timeline

Date online (tracker field)2029 (meaning under review)International Energy Agency · as of 2026

Location & names

Site NameHerøya Industrial Park (proposed first-plant site, 4 January 2022)

Additional project information

Administrative AreaPorsgrunnInternational Energy Agency · as of 2026
Capacity (Announced Size)8kt synthetic hydrocarbons/y productionInternational Energy Agency · as of 2026
Capacity (kt H2/y)10.1 kt H2/yInternational Energy Agency · as of 2026
Capacity (Nm³ H₂/h)12,901 Nm³ H₂/hInternational Energy Agency · as of 2026

Timeline

No recorded project events.

Sources & record history

Sources

Field sources

Shared date, confidence and value status appear once with their source above; a dash in the table refers to that source context.

FieldShown valueOriginal valueSourceDate basisMeaning
NameP2X Europe - Nordic Electrofuel Porsgrunn project, phase 1
View exact valueP2X Europe - Nordic Electrofuel Porsgrunn project, phase 1
Products for the future: P2X Europe and Nordic Electrofuel cooperate on PtL productsCurrent
Site NameHerøya Industrial Park (proposed first-plant site, 4 January 2022)
View exact valueHerøya Industrial Park (proposed first-plant site, 4 January 2022)
Starting construction of Norway's first e-fuel production at HerøyaCurrent
CountryNorway
View exact valueNorway
IEA Hydrogen Projects dataset——
Configuration DetailUnknown PtX
View exact valueUnknown PtX
IEA Hydrogen Projects dataset——
ProductSynfuels
View exact valueSynfuels
IEA Hydrogen Projects dataset——
TechnologyOther Electrolysis
View exact valueOther Electrolysis
IEA Hydrogen Projects dataset——
Capacity58.1 MW
View exact value58.05648490936437 MW
IEA Hydrogen Projects dataset——
EventDate online : 2029
View exact value{"date":"2029","date_precision":"year","event":"Date online","basis":"iea_hydrogen_projects_raw.csv"}
IEA Hydrogen Projects dataset——
Progress StatusFeasibility
View exact valueFeasibility study
IEA Hydrogen Projects dataset——
Administrative AreaPorsgrunn
View exact valuePorsgrunn
IEA Hydrogen Projects dataset——
Capacity (Announced Size)8kt synthetic hydrocarbons/y production
View exact value8kt synthetic hydrocarbons/y production
IEA Hydrogen Projects dataset——
Capacity (kt H2/y)10.1 kt H2/y
View exact value10.058479532163743 kt H2/y
IEA Hydrogen Projects dataset——
Capacity (Nm³ H₂/h)12,901 Nm³ H₂/h
View exact value12901.441090969862 Nm³ H₂/h
IEA Hydrogen Projects dataset——

Record history

1 current sourced value · 7 older values · Record updated

H2Prism separates published values from estimates. Check the linked source before you use a value. · Back to Hydrogen projects

Records are compiled with AI assistance. Original source links are shown when available.