O&L group - CMB.TECH hydrogen hub

4 MW · Electrolysis · Namibia

Operational

Namibia Map: Natural Earth
Capacity
4 MW
Target operation
—
Technology
Electrolysis
Country
Namibia
Development stage
Operational

Country scale

#11 by recorded MW among 12 projects with capacity recorded in this country.

  1. Hyphen Hydrogen Energy - phase II2,000 MW
  2. PV2Fuel1,039 MW
  3. O&L group - CMB.TECH hydrogen hub4 MW

All stages are included. Capacity does not describe current production.

Project details

Site
Walvis Bay
Electricity source
Solar
Production capacity
0.69 ktpa
Operation start
2025
Sources (3)
  • IEA Hydrogen Production Projects 2026

    International Energy Agency

    Original value: 2025 (Schedule question: Date online)

    Original value: Operational

    Original value: Capacity (MWel): 4; Technology: Other Electrolysis; Product: H2 (Capacity (MWel))

    Original value: Water electrolysis (Technology: Water electrolysis)

    Original value: Capacity (MWel): 4

    Original value: Hydrogen (Product: Hydrogen)

    Original value: 888.8888888888889 (Capacity (Nm³ H₂/h))

    Original value: 4MW (Announced Size)

  • IEA Hydrogen Production Projects 2026 (preserved CSV edition, received 2026-10-24)

    International Energy Agency · As of 2026-06-18

    Original value: Walvis Bay (Site: Walvis Bay)

    Original value: Operational

    Original value: Other Electrolysis

    Original value: Solar (Electricity source: Solar)

    Original value: Mobility (Product: Hydrogen)

    Original value: 0.6930133333333334 kt H2/y (Product: Hydrogen)

    Original value: 2025

    Original value: 4 MW

    Original value: Hydrogen (Product: Hydrogen)

    Published value: 0.6930 kt H2/y

  • International Energy Agency

    International Energy Agency

    Original value: Water electrolysis (Technology: Water electrolysis)

    Original value: Hydrogen (Product: Hydrogen)

    Original value: 888.8888888888889 (Capacity (Nm³ H₂/h))

Projects in Namibia

Major projects: operating and FID first, then by recorded capacity.

All projects in this country