NEOM Green Hydrogen Project

Overview

Sources
Name · ACWA Power

Current value: Value: NEOM Green Hydrogen Project

ACWA Power

Acwa | ACWA Power breaks ground on green hydrogen project in Uzbekistan

ACWA Power

Last confirmed: 2026-09-21T10:58:25.08186+00:00

As of: 2023-11-29

ACWA Power

Acwa | NEOM Green Hydrogen Project

ACWA Power

Last confirmed: 2026-09-21T10:58:34.885286+00:00

Capacity · International Energy Agency

Earlier value: Value: 2200

International Energy Agency

iea_hydrogen_projects_raw.csv

International Energy Agency

Original field: Capacity (MWel)

Last confirmed: 2026-09-01T01:50:00+00:00

As of: 2026-06-18

Earlier value: Value: 2.2GW - 650t H2/d - 1.2Mt NH3/y

International Energy Agency

iea_hydrogen_projects_raw.csv

International Energy Agency

Original field: Announced Size

Last confirmed: 2026-09-01T01:50:00+00:00

As of: 2026-06-18

Earlier value: Value: 372.8713043478261

International Energy Agency

iea_hydrogen_projects_raw.csv

International Energy Agency

Original field: Capacity (kt H2/y)

Last confirmed: 2026-09-01T01:50:00+00:00

As of: 2026-06-18

Earlier value: Value: 478260.8695652174

International Energy Agency

iea_hydrogen_projects_raw.csv

International Energy Agency

Original field: Capacity (Nm³ H₂/h)

Last confirmed: 2026-09-01T01:50:00+00:00

As of: 2026-06-18

Status · International Energy Agency

Earlier value: Value: FID/Construction

International Energy Agency

iea_hydrogen_projects_raw.csv

International Energy Agency

Original field: Status

Last confirmed: 2026-09-01T01:50:00+00:00

As of: 2026-06-18

Country · nghc.com

Current value: Value: Saudi Arabia

nghc.com

https://nghc.com/news/neom-green-hydrogen-company-completes-financial-close/

nghc.com

Last confirmed: 2026-10-13T06:08:34.203814+00:00

As of: 2023-05-22

Earlier value: Value: Saudi Arabia

International Energy Agency

iea_hydrogen_projects_raw.csv

International Energy Agency

Original field: Country (ISO-3)

Last confirmed: 2026-09-01T01:50:00+00:00

As of: 2026-06-18

Target operation · Source
Capacity—
Status—
CountrySaudi Arabia
Target operation—

Location & names

Sources
Site Name · nghc.com

Current value: Value: Oxagon

nghc.com

https://nghc.com/news/neom-green-hydrogen-company-completes-financial-close/

nghc.com

Last confirmed: 2026-10-13T06:08:34.203814+00:00

As of: 2023-05-22

Administrative Area · International Energy Agency

Earlier value: Value: Future location of Neom

International Energy Agency

iea_hydrogen_projects_raw.csv

International Energy Agency

Original field: Location

Last confirmed: 2026-09-01T01:50:00+00:00

As of: 2026-06-18

Alias · NEOM Green Hydrogen Company

Earlier value: Value: source_label; Value: NGHP

NEOM Green Hydrogen Company

NEOM Green Hydrogen Company (https://nghc.com/wp-content/uploads/2024/01/NEOM-Aqaba-WF-ESIA_Executive-Summary.pdf)

NEOM Green Hydrogen Company

Last confirmed: 2026-08-17T16:32:20+00:00

NEOM Green Hydrogen Company

NEOM Green Hydrogen Company (https://nghc.com/the-plant/)

NEOM Green Hydrogen Company

Last confirmed: 2026-08-17T16:32:20+00:00

H2Prism earlier record (SRC-C-P200)

H2Prism earlier record (SRC-C-P200)

Last confirmed: 2026-08-17T14:44:10+00:00

H2Prism earlier record (SRC-C-P200)

H2Prism earlier record (SRC-C-P200)

Last confirmed: 2026-08-17T14:44:10+00:00

Coordinates Precision · International Energy Agency

Earlier value: Value: 28.3059081292703; Value: 34.8492849222152

International Energy Agency

iea_hydrogen_projects_raw.csv

International Energy Agency

Original field: Latitude+Longitude

Last confirmed: 2026-09-01T01:50:00+00:00

As of: 2026-06-18

External Identifier · Source
Lineage Relation · Source
Local Name · Source
Official Name · NEOM Green Hydrogen Company

Earlier value: Value: en; Value: NEOM Green Hydrogen Project; Value: E-01

NEOM Green Hydrogen Company

NEOM Green Hydrogen Company (https://nghc.com/wp-content/uploads/2024/01/NEOM-Aqaba-WF-ESIA_Executive-Summary.pdf)

NEOM Green Hydrogen Company

Last confirmed: 2026-08-17T16:32:20+00:00

NEOM Green Hydrogen Company

NEOM Green Hydrogen Company (https://nghc.com/the-plant/)

NEOM Green Hydrogen Company

Last confirmed: 2026-08-17T16:32:20+00:00

H2Prism earlier record (SRC-C-P200)

H2Prism earlier record (SRC-C-P200)

Last confirmed: 2026-08-17T14:44:10+00:00

H2Prism earlier record (SRC-C-P200)

H2Prism earlier record (SRC-C-P200)

Last confirmed: 2026-08-17T14:44:10+00:00

Site NameOxagon

Technology & product

Sources
Carbon Reduction · Source
Components · NEOM Green Hydrogen Company

Earlier value: Value: 전해조; Value: 알칼라인; Original technology: alkaline water electrolysis module

NEOM Green Hydrogen Company

NEOM Green Hydrogen Company (https://nghc.com/wp-content/uploads/2024/01/NEOM-Aqaba-WF-ESIA_Executive-Summary.pdf)

NEOM Green Hydrogen Company

Last confirmed: 2026-08-17T16:32:20+00:00

NEOM Green Hydrogen Company

NEOM Green Hydrogen Company (https://nghc.com/the-plant/)

NEOM Green Hydrogen Company

Last confirmed: 2026-08-17T16:32:20+00:00

H2Prism earlier record (SRC-C-P200)

H2Prism earlier record (SRC-C-P200)

Last confirmed: 2026-08-17T14:44:10+00:00

H2Prism earlier record (SRC-C-P200)

H2Prism earlier record (SRC-C-P200)

Last confirmed: 2026-08-17T14:44:10+00:00

Configuration Detail · Larsen & Toubro Limited

Current value: Value: Larsen & Toubro EPC scope includes three 380 kV switching stations and 306 km of 380 kV overhead lines and underground cables required to the Kingdom grid network, plus an Energy Power Monitoring System; reported 1 June 2023

Larsen & Toubro Limited

L&T Construction is all set to create Renewable Energy Infrastructure for the World’s Largest Green Hydrogen plant at NEOM

Larsen & Toubro Limited

Last confirmed: 2026-10-14T07:14:26.988844+00:00

As of: 2023-06-01

Current value: Value: thyssenkrupp alkaline water electrolysis plant based on 20 MW modules

www.thyssenkrupp-nucera.com

https://www.thyssenkrupp-nucera.com/newsroom/news-press-releases/one-of-the-largest-green-hydrogen-projects-in-the-world-thyssenkrupp-signs-contract-to-install-over-2gw-electrolysis-plant-for-air-products-in-neom

www.thyssenkrupp-nucera.com

Last confirmed: 2026-10-13T06:09:06.305112+00:00

As of: 2021-12-13

Current value: Value: 400 MWh battery energy storage system included in Larsen & Toubro power-elements EPC scope, reported 1 June 2023

Larsen & Toubro Limited

L&T Construction is all set to create Renewable Energy Infrastructure for the World’s Largest Green Hydrogen plant at NEOM

Larsen & Toubro Limited

Last confirmed: 2026-10-14T07:14:26.988844+00:00

As of: 2023-06-01

Current value: Value: Once operational, green ammonia is planned to be transferred directly to tanker ships through the NGHC purpose-built jetty, with exports up to 1.2 million tonnes per year; described by Air Products South Africa on 18 June 2026

Air Products South Africa

NEOM Green Hydrogen Complex

Air Products South Africa

Last confirmed: 2026-10-14T07:14:27.68946+00:00

As of: 2026-06-18

Current value: Value: Topsoe ammonia technology identified for the planned NEOM green ammonia production facility in the announcement of 11 July 2020

Topsoe

World’s largest green hydrogen project will use Haldor Topsoe ammonia technology

Topsoe

Last confirmed: 2026-10-14T07:14:26.698239+00:00

As of: 2020-07-11

Current value: Value: More than 100 interconnected electrolyser units, each with a capacity of 20 MW

www.kfw-ipex-bank.de

https://www.kfw-ipex-bank.de/Presse/News/Pressemitteilungsdetails_764672-2.html

www.kfw-ipex-bank.de

Last confirmed: 2026-10-13T06:09:08.968659+00:00

As of: 2023-05-26

Feedstock · Source
Final Use · Source
Power Contract Attribute · Source
Power Source · Air Products South Africa

Current value: Value: Solar and wind renewable power

Air Products South Africa

NEOM Green Hydrogen Complex

Air Products South Africa

Last confirmed: 2026-10-14T07:14:27.68946+00:00

As of: 2026-06-18

Power Source Detail · Larsen & Toubro Limited

Current value: Value: Larsen & Toubro contracted EPC scope: 2.2 GWac PV solar plant, 1.65 GW wind generation balance of plant and a 400 MWh battery energy storage system; reported 1 June 2023

Larsen & Toubro Limited

L&T Construction is all set to create Renewable Energy Infrastructure for the World’s Largest Green Hydrogen plant at NEOM

Larsen & Toubro Limited

Last confirmed: 2026-10-14T07:14:26.988844+00:00

As of: 2023-06-01

Current value: Value: Air Products South Africa describes 1.6 GW wind generation and a 2.2 GW solar farm, with a dedicated transmission grid being constructed to carry 4 GW across the site; page dated 18 June 2026

Air Products South Africa

NEOM Green Hydrogen Complex

Air Products South Africa

Last confirmed: 2026-10-14T07:14:27.68946+00:00

As of: 2026-06-18

Product · International Energy Agency

Earlier value: Value: Ammonia

International Energy Agency

iea_hydrogen_projects_raw.csv

International Energy Agency

Original field: Product

Last confirmed: 2026-09-01T01:50:00+00:00

As of: 2026-06-18

Project Group · Source
Project Type · NEOM Green Hydrogen Company

Earlier value: Value: hydrogen_production_facility

NEOM Green Hydrogen Company

NEOM Green Hydrogen Company (https://nghc.com/wp-content/uploads/2024/01/NEOM-Aqaba-WF-ESIA_Executive-Summary.pdf)

NEOM Green Hydrogen Company

Last confirmed: 2026-08-17T16:32:20+00:00

NEOM Green Hydrogen Company

NEOM Green Hydrogen Company (https://nghc.com/the-plant/)

NEOM Green Hydrogen Company

Last confirmed: 2026-08-17T16:32:20+00:00

H2Prism earlier record (SRC-C-P200)

H2Prism earlier record (SRC-C-P200)

Last confirmed: 2026-08-17T14:44:10+00:00

H2Prism earlier record (SRC-C-P200)

H2Prism earlier record (SRC-C-P200)

Last confirmed: 2026-08-17T14:44:10+00:00

Technology · International Energy Agency

Earlier value: Value: ALK

International Energy Agency

iea_hydrogen_projects_raw.csv

International Energy Agency

Original field: Technology

Last confirmed: 2026-09-01T01:50:00+00:00

As of: 2026-06-18

Power SourceSolar and wind renewable power

Capacity & economics

Sources
Awarded Price · Source
Demand Consumption · Source
Financing · nghc.com

Current value: Value: USD 6.1 billion non-recourse financing from 23 banks and financial institutions; financial close announced 22 May 2023

nghc.com

https://nghc.com/news/neom-green-hydrogen-company-completes-financial-close/

nghc.com

Last confirmed: 2026-10-13T06:08:34.203814+00:00

As of: 2023-05-22

Production Cost · Source
Production · NEOM Green Hydrogen Company

Current value: Value: up to 600 tonnes per day of carbon-free hydrogen

NEOM Green Hydrogen Company

World’s Largest Green Hydrogen Plant Achieves 90% Overall Construction Completion Across All Sites

NEOM Green Hydrogen Company

Last confirmed: 2026-09-28T22:32:28.729084+00:00

As of: 2026-03-26

Purchase Agreement Details · nghc.com

Current value: Value: Exclusive 30-year offtake agreement with Air Products for all green ammonia produced at the facility, secured as of 22 May 2023

nghc.com

https://nghc.com/news/neom-green-hydrogen-company-completes-financial-close/

nghc.com

Last confirmed: 2026-10-13T06:08:34.203814+00:00

As of: 2023-05-22

Sales Price · Source
Total Capex · nghc.com

Current value: Value: USD 8.4 billion total investment at financial close announced 22 May 2023

nghc.com

https://nghc.com/news/neom-green-hydrogen-company-completes-financial-close/

nghc.com

Last confirmed: 2026-10-13T06:08:34.203814+00:00

As of: 2023-05-22

FinancingUSD 6.1 billion non-recourse financing from 23 banks and financial institutions; financial close announced 22 May 2023
ProductionUp to 600 tpd
Purchase Agreement DetailsExclusive 30-year offtake agreement with Air Products for all green ammonia produced at the facility, secured as of 22 May 2023
Total CapexUSD 8.4 billion total investment at financial close announced 22 May 2023

Status & timeline

Sources
Actual Output · Source
Actual Utilization · Source
Event · thyssenkrupp

Earlier value: Value: 2021-12-13; Value: 2021-12-13; Value: E-03; Value: transcription; Value: EV-08; Value: December 13, 2021; Value: day

thyssenkrupp

thyssenkrupp (https://www.thyssenkrupp.com/en/newsroom/press-releases/pressdetailpage/one-of-the-largest-green-hydrogen-projects-in-the-world--thyssenkrupp-signs-contract-to-install-over-2gw-electrolysis-plant-for-air-products-in-neom-124584)

thyssenkrupp

Last confirmed: 2026-08-17T16:32:20+00:00

As of: 2021-12-13

H2Prism earlier record (SRC-C-P200)

H2Prism earlier record (SRC-C-P200)

Last confirmed: 2026-08-17T14:44:10+00:00

H2Prism earlier record (SRC-C-P200)

H2Prism earlier record (SRC-C-P200)

Last confirmed: 2026-08-17T14:44:10+00:00

Earlier value: Value: 2023-05-22; Value: 2023-05-22; Value: E-06; Value: transcription; Value: EV-06; Value: 22 May 2023; Value: day

Air Products and Chemicals, Inc.

Air Products and Chemicals, Inc. (https://investors.airproducts.com/static-files/3d2d0305-b4e9-4575-8778-daee1b1333ec)

Air Products and Chemicals, Inc.

Last confirmed: 2026-08-17T16:32:20+00:00

As of: 2023-05-22

H2Prism earlier record (SRC-C-P200)

H2Prism earlier record (SRC-C-P200)

Last confirmed: 2026-08-17T14:44:10+00:00

H2Prism earlier record (SRC-C-P200)

H2Prism earlier record (SRC-C-P200)

Last confirmed: 2026-08-17T14:44:10+00:00

Earlier value: Value: 2023-05-22; Value: 2023-05-22; Value: E-06; Value: transcription; Value: EV-09; Value: 22 May 2023; Value: day

Air Products and Chemicals, Inc.

Air Products and Chemicals, Inc. (https://investors.airproducts.com/static-files/3d2d0305-b4e9-4575-8778-daee1b1333ec)

Air Products and Chemicals, Inc.

Last confirmed: 2026-08-17T16:32:20+00:00

As of: 2023-05-22

H2Prism earlier record (SRC-C-P200)

H2Prism earlier record (SRC-C-P200)

Last confirmed: 2026-08-17T14:44:10+00:00

H2Prism earlier record (SRC-C-P200)

H2Prism earlier record (SRC-C-P200)

Last confirmed: 2026-08-17T14:44:10+00:00

Earlier value: Value: 2027; Value: 2026-03-26; Value: E-04; Value: transcription; Value: EV-14; Value: first green ammonia product availability planned for 2027; Value: year

NEOM Green Hydrogen Company

NEOM Green Hydrogen Company (https://nghc.com/news/worlds-largest-green-hydrogen-plant-achieves-90-overall-construction-completion-across-all-sites/)

NEOM Green Hydrogen Company

Last confirmed: 2026-08-17T16:32:20+00:00

As of: 2026-03-26

H2Prism earlier record (SRC-C-P200)

H2Prism earlier record (SRC-C-P200)

Last confirmed: 2026-08-17T14:44:10+00:00

H2Prism earlier record (SRC-C-P200)

H2Prism earlier record (SRC-C-P200)

Last confirmed: 2026-08-17T14:44:10+00:00

Current value: Value: Financial close announced on 22 May 2023

nghc.com

https://nghc.com/news/neom-green-hydrogen-company-completes-financial-close/

nghc.com

Last confirmed: 2026-10-13T06:08:34.203814+00:00

As of: 2023-05-22

Current value: Value: 90% overall construction completion across all sites; renewable generation assets approximately 95% complete, reported 26 March 2026

nghc.com

https://nghc.com/news/worlds-largest-green-hydrogen-plant-achieves-90-overall-construction-completion-across-all-sites/

nghc.com

Last confirmed: 2026-10-13T06:08:44.890925+00:00

As of: 2026-03-26

Current value: Value: Air Products South Africa reported that construction was in final completion and commissioning had started with energization on its page dated 18 June 2026

Air Products South Africa

NEOM Green Hydrogen Complex

Air Products South Africa

Last confirmed: 2026-10-14T07:14:27.68946+00:00

As of: 2026-06-18

Current value: Value: First green ammonia product availability planned for 2027, reported 26 March 2026

nghc.com

https://nghc.com/news/worlds-largest-green-hydrogen-plant-achieves-90-overall-construction-completion-across-all-sites/

nghc.com

Last confirmed: 2026-10-13T06:08:44.890925+00:00

As of: 2026-03-26

Earlier value: Value: 2027

International Energy Agency

iea_hydrogen_projects_raw.csv

International Energy Agency

Original field: Date online

Last confirmed: 2026-09-01T01:50:00+00:00

As of: 2026-06-18

Inactivity Signal · Source
Lifecycle Stage · Source
Operating Level · Source
Permit Type · Source
Permits · Source
Phase Sequence · Source
Shutdown · Source
Suspension Character · Source