Nature Energy Glansager
Overview
Statusinitially designed to handle around 25% of plant biogas production
Country · regionDenmark · Sønderborg
TechnologyPower-to-Gas with electrolysis and biological methanation
Producte-methane / green methane
Capacity6 MWEuropean Clean Hydrogen Partnership · as of 2025
Capacity values retain their recorded units and scope. MW, kt H₂/y and Nm³ H₂/h are different measures; this page does not convert or add them without a shared operating basis.
Details
Technology & product
Componentselectrolysis plant, biological methanation trickle filter
Feedstockmanure, industrial waste, organic waste
Power Sourcesurplus power from solar cells and wind turbines
Status & timeline
Lifecycle Stageoperational / ready for production by 2023
EventPtX section inaugurated in fall 2023
Location & names
Site NameGlansager
Timeline
No recorded project events.
Sources & record history
Sources
- Energy Cluster Denmark Biogas P2X
- ProjectZero Power-to-Gas plant Shared by 6 fields: Current
- State of Green Integrating power and gas systems through Power-to-Gas in Sønderborg Shared by 5 fields: Current
- European Clean Hydrogen Partnership European Hydrogen Observatory projects Dec2025
Field sources
Shared date, confidence and value status appear once with their source above; a dash in the table refers to that source context.
| Field | Shown value | Original value | Source | Date basis | Meaning |
|---|---|---|---|---|---|
| Name | Nature Energy Glansager | View exact valueNature Energy Glansager | Biogas P2X | Current | |
| Site Name | Glansager | View exact valueGlansager | Power-to-Gas plant | — | |
| Administrative Area | Sønderborg | View exact valueSønderborg | Integrating power and gas systems through Power-to-Gas in Sønderborg | — | |
| Country | Denmark | View exact valueDenmark | Integrating power and gas systems through Power-to-Gas in Sønderborg | — | |
| Components | electrolysis plant, biological methanation trickle filter | View exact value["electrolysis plant","biological methanation trickle filter"] | Power-to-Gas plant | — | |
| Feedstock | manure, industrial waste, organic waste | View exact value["manure","industrial waste","organic waste"] | Power-to-Gas plant | — | |
| Power Source | surplus power from solar cells and wind turbines | View exact valuesurplus power from solar cells and wind turbines | Power-to-Gas plant | — | |
| Product | e-methane / green methane | View exact valuee-methane / green methane | Power-to-Gas plant | — | |
| Technology | Power-to-Gas with electrolysis and biological methanation | View exact valuePower-to-Gas with electrolysis and biological methanation | Integrating power and gas systems through Power-to-Gas in Sønderborg | — | |
| Capacity | 6 MW | View exact value6 MW | European Hydrogen Observatory projects Dec2025 Confidence: reported | Snapshot 2025-12-01 | Older value (2025) |
| Event | PtX section inaugurated in fall 2023 | View exact valuePtX section inaugurated in fall 2023 | Power-to-Gas plant | — | |
| Lifecycle Stage | operational / ready for production by 2023 | View exact valueoperational / ready for production by 2023 | Integrating power and gas systems through Power-to-Gas in Sønderborg | — | |
| Progress Status | initially designed to handle around 25% of plant biogas production | View exact valueinitially designed to handle around 25% of plant biogas production | Integrating power and gas systems through Power-to-Gas in Sønderborg | — |
Record history
11 current sourced values · 1 older value · Record updated