H2PrismHydrogen intelligenceSubscribe

Methane Synthesis test facility in Koshijihara Plant of INPEX’s - Nagaoa

0.07 MW · Japan

Operational

Japan Map: Natural Earth
Capacity
0.07 MW
Target operation
—
Technology
—
Country
Japan
Development stage
Operational

Country scale

#12 by recorded MW among 29 projects with capacity recorded in this country.

  1. Hydrogen plant in Tomakomai100 MW
  2. Suntory Hakushu Distillery and Suntory Minami Alps Hakushu Water Plant16 MW
  3. Methane Synthesis test facility in Koshijihara Plant of INPEX’s - Nagaoa0.07 MW

All stages are included. Capacity does not describe current production.

Project details

Product
Synthetic methane · Methane
Function
Production
Production capacity
0.01 ktpa
Operation start
2019
Announced size
16m3 H2/h
Sources (5)
  • IEA Hydrogen Production Projects 2026 (preserved CSV edition, received 2026-10-24)

    International Energy Agency · As of 2026-06-18

    Original value: Synthetic methane (Product: Synthetic methane)

    Original value: 0.072 MW

    Original value: 0.01247424 kt H2/y (Product: Hydrogen)

    Original value: Operational

    Original value: Other Electrolysis

    Published value: 0.01247 kt H2/y

  • International Energy Agency

    International Energy Agency

    Original value: 0.01247424 (Capacity (kt H2/y))

    Original value: 2019

    Original value: 16 (Capacity (Nm³ H₂/h))

    Original value: 16m3 H2/h

  • IEA Hydrogen Production Projects 2026

    International Energy Agency

    Original value: 0.01247424 (Capacity (kt H2/y))

    Original value: Capacity (MWel): 0.072; Technology: Other Electrolysis; Product: CH4 (Capacity (MWel))

    Original value: Operational

    Original value: Methane (Product: Methane)

    Original value: 2019

    Original value: 16 (Capacity (Nm³ H₂/h))

    Original value: 16m3 H2/h

    Original value: Capacity (MWel): 0.072

  • NEDO

    NEDO

    Original value: Koshijihara Plant, Nagaoka Field Office (Site: Koshijihara Plant, Nagaoka Field Office)

    Original value: Production (Function: Production)

    Original value: JP-15 Niigata Prefecture (Site: JP-15 Niigata Prefecture)

  • NEDO (https://www.nedo.go.jp/news/press/AA5_101217.html)

    NEDO

    Original value: Koshijihara Plant, Nagaoka Field Office (Site: Koshijihara Plant, Nagaoka Field Office)

    Original value: Production (Function: Production)

    Original value: JP-15 Niigata Prefecture (Site: JP-15 Niigata Prefecture)

Projects in Japan

Major projects: operating and FID first, then by recorded capacity.

All projects in this country