Meraker
Overview
StatusFeasibilityInternational Energy Agency · as of 2026
Country · regionNorwayInternational Energy Agency · as of 2026
TechnologyALKInternational Energy Agency · as of 2026
ProductH2International Energy Agency · as of 2026
Capacity6 MW installed electrolyser capacity intended for the first phase at Kopperå, Meråker (HYDS announcement 5 June 2024; not an as-built capacity)
Capacity values retain their recorded units and scope. MW, kt H₂/y and Nm³ H₂/h are different measures; this page does not convert or add them without a shared operating basis.
Details
Status & timeline
Lifecycle StagePlanned development as of 5 June 2024; FID was planned for Q1 2025, followed by execution and construction (milestones not confirmed achieved)
Date online (tracker field)2027 (meaning under review)International Energy Agency · as of 2026
Additional project information
Administrative AreaMerakerInternational Energy Agency · as of 2026
Capacity (kt H2/y)1.02 kt H2/yInternational Energy Agency · as of 2026
Capacity (MWel)6 MWelInternational Energy Agency · as of 2026
Capacity (Announced Size)6 MWInternational Energy Agency · as of 2026
Capacity (Nm³ H₂/h)1,304 Nm³ H₂/hInternational Energy Agency · as of 2026
Timeline
No recorded project events.
Sources & record history
Sources
- IEA Hydrogen Projects dataset Shared by 11 fields: Snapshot 2026-06-18 · Confidence: reported · Older value (2026)
- HYDS HYDS has acquired shares in Meraker Hydrogen AS Shared by 2 fields: Current
Field sources
Shared date, confidence and value status appear once with their source above; a dash in the table refers to that source context.
| Field | Shown value | Original value | Source | Date basis | Meaning |
|---|---|---|---|---|---|
| Name | Meraker | View exact valueMeraker | IEA Hydrogen Projects dataset | — | — |
| Country | Norway | View exact valueNorway | IEA Hydrogen Projects dataset | — | — |
| Product | H2 | View exact valueH2 | IEA Hydrogen Projects dataset | — | — |
| Technology | ALK | View exact valueALK | IEA Hydrogen Projects dataset | — | — |
| Capacity | 6 MW installed electrolyser capacity intended for the first phase at Kopperå, Meråker (HYDS announcement 5 June 2024; not an as-built capacity) | View exact value6 MW installed electrolyser capacity intended for the first phase at Kopperå, Meråker (HYDS announcement 5 June 2024; not an as-built capacity) | HYDS has acquired shares in Meraker Hydrogen AS | — | |
| Event | Date online : 2027 | View exact value{"date":"2027","date_precision":"year","event":"Date online","basis":"iea_hydrogen_projects_raw.csv"} | IEA Hydrogen Projects dataset | — | — |
| Lifecycle Stage | Planned development as of 5 June 2024; FID was planned for Q1 2025, followed by execution and construction (milestones not confirmed achieved) | View exact valuePlanned development as of 5 June 2024; FID was planned for Q1 2025, followed by execution and construction (milestones not confirmed achieved) | HYDS has acquired shares in Meraker Hydrogen AS | — | |
| Progress Status | Feasibility | View exact valueFeasibility study | IEA Hydrogen Projects dataset | — | — |
| Administrative Area | Meraker | View exact valueMeraker | IEA Hydrogen Projects dataset | — | — |
| Capacity (kt H2/y) | 1.02 kt H2/y | View exact value1.0169217391304346 kt H2/y | IEA Hydrogen Projects dataset | — | — |
| Capacity (MWel) | 6 MWel | View exact value6 MWel | IEA Hydrogen Projects dataset | — | — |
| Capacity (Announced Size) | 6 MW | View exact value6 MW | IEA Hydrogen Projects dataset | — | — |
| Capacity (Nm³ H₂/h) | 1,304 Nm³ H₂/h | View exact value1304.3478260869565 Nm³ H₂/h | IEA Hydrogen Projects dataset | — | — |
Record history
2 current sourced values · 5 older values · Record updated