H2PrismHydrogen intelligenceSubscribe

L’usine H₂ V de Bécancour

· Canada

Dormant

Canada Map: Natural Earth
Capacity
—
Target operation
—
Technology
—
Country
Canada
Development stage
Dormant

Project details

Site
Bécancour
Electricity source
Grid mix
Product
Hydrogen
Sources (2)
  • IEA Hydrogen Production Projects 2026 (preserved CSV edition, received 2026-10-24)

    International Energy Agency · As of 2026-06-18

    Original value: Bécancour (Site: Bécancour)

    Original value: Grid mix (Electricity source: Grid mix)

    Original value: Biomass

    Original value: Hydrogen (Product: Hydrogen)

    Original value: Ammonia (Product: Hydrogen)

    Original value: 116 kt H2/year

    Original value: Methanol (Product: Hydrogen)

    Original value: Dormant

  • IEA Hydrogen Production Projects 2026

    International Energy Agency

    Original value: Capacity (kt H2/y): 116 (Capacity (kt H2/y))

    Original value: Biomass conversion (Pathway: Biomass conversion)

    Original value: Dormant

    Original value: 116k TPA H2 / 653k TPA NH3 / 738k TPA MeOH (Announced Size)

    Original value: Capacity (Nm³ H₂/h): 148786.6194653943 (Capacity (Nm³ H₂/h))

    Original value: Hydrogen (Product: Hydrogen)

Projects in Canada

Major projects: operating and FID first, then by recorded capacity.

All projects in this country